Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC l1 |
| Sl No | Description | Qty | Unit | K M ALI L1 |
|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | ||||
| 1.01 | Quarry Waste | 10.53 | cum | 935 ₹9,845.55 Lowest |
| 1.02 | interlocking C.C. Paver block (80mm thick M-30) | 140.4 | sqm | 944 ₹1,32,537.6 Lowest |
| 1.03 | Stone aggregate (single size):06mm nominal size | 7.02 | cum | 2,520 ₹17,690.4 Lowest |
| 1.04 | Stone aggregate (single size): 20mm nominal size | 0.4 | cum | 2,467.5 ₹982.07 Lowest |
| 1.05 | Stone aggregate (single size): 10mm nominal size | 0.13 | cum | 2,467.5 ₹323.24 Lowest |
| 1.06 | Coarse sand (zone iii) | 0.26 | cum | 2,572.5 ₹679.14 Lowest |
| 1.07 | Portland Cement | 0.19 | tonne | 10,240 ₹1,945.6 Lowest |
| 1.08 | Hire charge of Concrete Mixer 0.25 to 0.40 cum with Hopper | 0.04 | Day | 3,000 ₹126 Lowest |
| 1.09 | Vibrator | 0.04 | Day | 1,300 ₹54.6 Lowest |
Tender Value
₹2.0 L
EMD Value
₹3,997
Closing Date
14 Mar 2026, 4:00 pmClosed
PANCHAYATH SECRATARY
Secretary ChoornikkaraGp
interlockkattavirikkal
2026_DP_844539_1
114/24-25 (retender)
Open Tender
Raw Materials
Item Rate
CHOORNIKKARA GP
Please refer Tender documents.
4 documents required · 4 mandatory
₹376
₹3,997
14 Jul 2026
6 Mar 2026
16 Mar 2026
7 Mar 2026
14 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Quarry Waste | 1 | cum | 935 | ₹934.07 |
| 1.02 | interlocking C.C. Paver block (80mm thick M-30) | - | sqm | 944 | - |
| 1.03 | Stone aggregate (single size):06mm nominal size | 1 | cum | 2,520 | ₹2,517.48 |
| 1.04 | Stone aggregate (single size): 20mm nominal size | - | cum | 2,467.5 | - |
| 1.05 | Stone aggregate (single size): 10mm nominal size | - | cum | 2,467.5 | - |
| 1.06 | Coarse sand (zone iii) | - | cum | 2,572.5 | - |
| 1.07 | Portland Cement | 1 | tonne | 10,240 | ₹10,229.76 |
| 1.08 | Hire charge of Concrete Mixer 0.25 to 0.40 cum with Hopper | - | Day | 3,000 | - |
| 1.09 | Vibrator | - | Day | 1,300 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_1425889.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .