Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC QUOTED THE LOWEST RATE FOR THE ITEM | |
| 2 | L2₹8.4 L+₹3.1 L (58.3%)Rejected-Finance | L2 | Rejected-Finance NOT QUOTED THE LOWEST RATE FOR THE ITEM | |
| 3 | Rejected-Technical 23 KULATHANGARAI STREET KULATHANGARAI STREET UTHIRAMERUR KANCHIPURAM TAMIL NADU 603406 | KANCHIPURAM | TAMIL NADU | 603406 | - | Rejected-Technical DOES NOT COMPLY WITH TERMS AND CONDITIONS | |
| 4 | Not Admitted-Fee/PreQual/Technical F 34 8 PHASE II OKHLA INDUSTRIAL AREA NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Rejected-Technical 1 3 PERIYAPANICHERI SIDCO INDUSTRIAL ESTATE PORUR KUNDRATHUR MAIN ROAD CHENNAI TAMIL NADU 600128 | KANCHIPURAM | TAMIL NADU | 600128 | - | Rejected-Technical DOES NOT COMPLY WITH TERMS AND CONDITIONS |
Tender Value
Refer Docs
Closing Date
15 Feb 2020, 6:00 pmClosed
PRINCIPAL
GCE, SRIRANGAM,TRICHY
Renewable Energy Lab
2020_DoTE_156360_1
DOTE / GCE-SRI / E7 / 563/ EEE25 /2020
Open Tender
Laboratory and scientific equipment
Supply
15 days
GCE, SRIRANGAM, TRICHY
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
25 Feb 2021
1 Feb 2020
17 Feb 2020
1 Feb 2020
15 Feb 2020
1 Feb 2020
PV Emulator: 2 kW Solar PV Emulator, 2 channels of 1 kW each Voltage Range = 0-50 V per channel Current Range = 0-20 Amp. Per channel • An active measurement panel to be provided to measure voltage current, power and energy • Ability to test response of PV system for wide range of solar panels. • Should Simulate the I-V curve under varying environment conditions • Should have the capacity to Test and verify different parameters of PV system like – MPPT tracking algorithm of PV inverter efficiency of MPPT tracking • Should have the capacity to Measure and verify the overall efficiency and conversion efficiency of PV inverter for variety of solar panels and in varying weather condition • Should have the capacity to simulate partial shading effects and obtain up to four peaks • Two users should use single PV emulator to carry out different results using PV emulator in 1 KW mode • should be able to Track load point and load line • IV /PV graphs can be seen using any software • Data can be saved in excel format • Graphs can be saved in image formats
PANTECH PROLABS INDIA PVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .