| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-Finance | ₹49.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹64.2 LRejected-Finance | ₹64.2 L | L2 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | M/S SHAMBHVI MAHAKAL CONSTRUCTION L2 | R P SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section | 1,235.68 | CUM | 112.78 ₹1.4 L | 50 ₹61,784 |
| 2.00 | Laying Cement concrete in M-10 1:3:6 including all costs of T&P material required for proper completion of work. | 51.6 | CUM | 5,118.25 ₹2.6 L | 2,000 ₹1.0 L |
| 3.00 | Laying C.C. in M-15 1:2:4 in Road etc. including all costs of T&P material required for proper completion of work. | 14.56 | CUM | 5,291.75 ₹77,047.88 | 2,000 ₹29,120 |
| 4.00 | Laying R.C.C. in M-20 1:1.5:3 in Toe wall Transitions sleepers lining etc. including all costs of T&P material required for proper completion of work. | 57.75 | CUM | 6,246 ₹3.6 L | 5,500 ₹3.2 L |
| 5.00 | Laying R.C.C. in M-25 1:1:2 in Raft wall bridge, wearing Coat etc. including all costs of T&P material required for proper completion of work. | 228.84 | CUM | 6,940 ₹15.9 L | 6,300 ₹14.4 L |
| 6.00 | Centering and shuttering for C.C. works in peir abutment including cost of all labour and T&P etc. complete. | 102.96 | SQM | 433.75 ₹44,658.90 | 100 ₹10,296 |
| 7.00 | Centering and shuttering for ordinary R.C.C. works including cost of all labour and T&P etc. complete. | 65.38 | SQM | 713.09 ₹46,621.50 | 200 ₹13,076 |
| 8.00 | Centering and Shuttering for Special type of R.C.C. works including cost of all labour and T&P etc. complete. | 369.03 | SQM | 876.18 ₹3.2 L | 100 ₹36,903 |
| 9.00 | Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete. | 31.17 | M.T. | 65,930 ₹20.6 L | 60,000 ₹18.7 L |
| 10.00 | S/L Settlement Joint with G.P./ Copper/Stainless Steel water stop including cost of all labour and T&P etc. Complete. | 12.2 | R.M. | 14,747.5 ₹1.8 L | 3,000 ₹36,600 |
Tender Value
₹74 L
EMD Value
₹1.5 L
Closing Date
9 Mar 2026, 5:00 pmClosed
Suprintending Engineer
Madhya Ganga Canal Construction Moradabad
Construction of V.R.B at Km 10.550 of Chandausi Branch.
2026_UPIDC_1119667_2
03/SE/2025-26
Open Tender
Civil Works - Bridges
90 days
Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.5 L
Moradabad
18 Apr 2026
25 Feb 2026
10 Mar 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
27 Feb 2026
Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section
Laying Cement concrete in M-10 1:3:6 including all costs of T&P material required for proper completion of work.
Laying C.C. in M-15 1:2:4 in Road etc. including all costs of T&P material required for proper completion of work.
Laying R.C.C. in M-20 1:1.5:3 in Toe wall Transitions sleepers lining etc. including all costs of T&P material required for proper completion of work.
Laying R.C.C. in M-25 1:1:2 in Raft wall bridge, wearing Coat etc. including all costs of T&P material required for proper completion of work.
Centering and shuttering for C.C. works in peir abutment including cost of all labour and T&P etc. complete.
Centering and shuttering for ordinary R.C.C. works including cost of all labour and T&P etc. complete.
Centering and Shuttering for Special type of R.C.C. works including cost of all labour and T&P etc. complete.
Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete.
S/L Settlement Joint with G.P./ Copper/Stainless Steel water stop including cost of all labour and T&P etc. Complete.
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete.
Providing & Fixing 225 mm wide water stop seal including cost of all labour and T&P etc. Complete.
Earth work in filling for Ramp lifting the level of roads upto the VRB levels including Cost of all labour and T&P etc. Complete.
Making wall & for stopping traffic in M- 100 B/W in 1:6 Cement mortar cost of all labour and T & P etc. Complete for diversion.
Making and fixing sign board at site of work. including cost of all labour and T&P etc. Complete.
S/Laying and consolidation of 150 mm thick stone ballast (40-63) including cost of material, all labour and T&P etc. Complete.
S/Laying and consolidation of 120mm thick stone ballast (22.4-53) including cost of material, all labour and T&P etc. Complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_2082286.pdf
techsummary_2082286.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2082286.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid