| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-Finance NOT SPECIFIED | ₹1.5 Cr | 1 | Accepted-Finance only bid |
| Sl No | Description | Qty | Unit | MARYMATHA INFRASTRUCTURE PVT LTD L1 |
|---|---|---|---|---|
| 1.00APPENDIX A- CONSTRUCTION OF BOX CULVERT | ||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 200 | sqm | 20 ₹4,000 |
| 1.00 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. | 796.9 | kg | 20 ₹15,938 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 49.73 | cum | 2,000 ₹99,450 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 16.57 | cum | 3,000 ₹49,725 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 96.99 | cum | 3,800 ₹3.7 L |
| 1.01 | OD34056/2025-2026:Conveying the spoil/debris obtained from time to time and disposing at
dumping site plant (Avg. distance of 5km) by lorry or by any other suitable means including
loading from site to unloading at dumping site(The actual distance from the site to the yard will be considered for payment. This data has been prepared based on an average distance of 5 km. If the yard is located more than 5 km away from the site, it will be taken care of during execution.) | 135.45 | cum | 500 ₹67,726.50 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 344.18 | cum | 500 ₹1.7 L |
| 1.01 | OD30272/2024-2025:Providing temporary Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically
in lines and levels interlocking with adjacent piles with suitable pile driving unit and
all accessories including all labour, hire charges etc. complete for protection of
adjacent structures and road and removing the same after work as per the directions of
departmental officers at site. (measurements will be for depth of excavation)
Details for3.35M2(For 3.5mtre excavation 7mtre length of sheet pile is to be driven)
Driving rate per running meter length
Ztype pile [email protected]/m2=412.45Kg
2% wastage=8.250Kg
Total=420.70Kg | 263.25 | per sqm | 4,500 ₹11.8 L |
| 1.01 | OD32562/2024-2025:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour
dismantling the bund after completion of the work etc. complete. | 63 | cum | 1,200 ₹75,600 |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
27 Dec 2025, 6:00 pmClosed
Superintending Engineer, MICC
Superintending Engineer, MICC, Kakkanad
Flood Mitigation and control works in Pottachal and Parutheli Area near Cochin University in Kalamassery Muncipality, Ernakulam District
2025_Irrig_817113_2
IRR/IA/TR/232/2025_5_1_1/1
Open Tender
Civil Works - Others
180 days
kalamassery municipality
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,508
Yes
₹50,000
Yes
29 Dec 2025
20 Dec 2025
29 Dec 2025
20 Dec 2025
27 Dec 2025
20 Dec 2025
20 Dec 2025 - 27 Dec 2025
Amount
APPENDIX A- CONSTRUCTION OF BOX CULVERT
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
OD34056/2025-2026:Conveying the spoil/debris obtained from time to time and disposing at dumping site plant (Avg. distance of 5km) by lorry or by any other suitable means including loading from site to unloading at dumping site(The actual distance from the site to the yard will be considered for payment. This data has been prepared based on an average distance of 5 km. If the yard is located more than 5 km away from the site, it will be taken care of during execution.)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD30272/2024-2025:Providing temporary Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour, hire charges etc. complete for protection of adjacent structures and road and removing the same after work as per the directions of departmental officers at site. (measurements will be for depth of excavation) Details for3.35M2(For 3.5mtre excavation 7mtre length of sheet pile is to be driven) Driving rate per running meter length Ztype pile [email protected]/m2=412.45Kg 2% wastage=8.250Kg Total=420.70Kg
OD32562/2024-2025:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
OD32564/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
19.15.1:Providing M.S. foot rests including fixing in manholes with 20x20x10 cm cement concrete blocks 1:3:6 (1 cement : 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) as per standard design.With 20x20 mm square bar
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
APPENDIX B -RECONSTRUCTION OF CULVERT
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD34057/2025-2026:Conveying the spoil/debris obtained from time to time and disposing at dumping site plant (Avg. distance of 5km) by lorry or by any other suitable means including loading from site to unloading at dumping site(The actual distance from the site to the yard will be considered for payment. This data has been prepared based on an average distance of 5 km. If the yard is located more than 5 km away from the site, it will be taken care of during execution.)
OD29969/2024-2025:Providing temporary Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour, hire charges etc. complete for protection of adjacent structures and road and removing the same after work as per the directions of departmental officers at site. (measurements will be for depth of excavation) Details for3.35M2(For 3.5mtre excavation 7mtre length of sheet pile is to be driven) Driving rate per running meter length Ztype pile [email protected]/m2=412.45Kg 2% wastage=8.250Kg Total=420.70Kg
60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
OD29971/2024-2025:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end
60.64.6:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
16.78.2:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25
16.91.2:Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
Bidder Name
MARYMATHA INFRASTRUCTURE PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1379439.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_1379439.xls
BOQ • 0.34 MB
NIT.pdf
Tender Documents • 0.26 MB
SBD.pdf
Tender Documents • 2.98 MB
Download all tender documents and submit your bid