| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L1₹18.0 LRejected-Finance H NO 129 BEHIND CHAPEL KHADPABANDH PONDA GOA | SOUTH GOA | GOA | 403103 | L1 | Rejected-Finance as per instructions |
| Sl No | Description | Qty | Unit | Balaji Constructions and Traders L1 | M/S JYOTI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/ manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be by adopting any approved method or methods as may be convenient or permitted incl. of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge etc. complete. | 393.3 | cum | 220 ₹86,526 Lowest | 230 ₹90,459 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 39.6 | cum | 1,901.03 ₹75,280.79 Lowest | 2,211.07 ₹87,558.37 |
| 3.00 | Centering and shuttering including struttings,propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete. | 327.31 | sq.m | 370 ₹1,21,104.7 | 340 ₹1,11,285.4 Lowest |
| 4.00 | Providing & laying cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded granitic orbasaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level | 148.51 | cum | 5,107.5 ₹7,58,514.83 Lowest | 5,114.31 ₹7,59,526.18 |
| 5.00 | Laterite boulder masonry in cement concrete 1:3:6 (1 cement:3coarse sand:6graded stone aggregate of 40mm nominal size in foundation. | 118.8 | cum | 3,794.17 ₹4,50,747.4 | 3,684.15 ₹4,37,677.02 Lowest |
| 6.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall,wing wall and earth retaining structures complete as directed by the Engineer in charge.
A)110mm dia | 112.5 | RM | 279.64 ₹31,459.5 Lowest | 330.02 ₹37,127.25 |
Tender Value
₹22.5 L
EMD Value
₹44,947
Closing Date
4 Aug 2025, 4:00 pmClosed
EE XI, WRD
Ravonfond, Navelim
Construction of Protection wall in Sy. No. 124/1 and 128/0 near Balwadi at Opawada in Ward No. 3 Khandepar in V.P.Curti Khandepar in Ponda Constituency in Ponda Taluka
2025_WRD_23912_1
WDXI/PB/F.24/2025-26/662/Sr2
Open Tender
Miscellaneous Works
Item Rate
45 days
Ravonfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹44,947
5 Jan 2026
22 Jul 2025
6 Aug 2025
22 Jul 2025
4 Aug 2025
22 Jul 2025
Amount
Earthwork in excavation by mechanical/ manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be by adopting any approved method or methods as may be convenient or permitted incl. of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge etc. complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings,propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded granitic orbasaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level
Laterite boulder masonry in cement concrete 1:3:6 (1 cement:3coarse sand:6graded stone aggregate of 40mm nominal size in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall,wing wall and earth retaining structures complete as directed by the Engineer in charge. A)110mm dia
M/S JYOTI CONSTRUCTIONS (BID ID -51356)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .