| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.2 LAdmitted-Finance | -24.00% | ₹41.2 L | L1 | Admitted-Finance |
| 2 | L2₹41.3 L+₹13,549.55 (0.33%)Admitted-Finance | -23.75% | ₹41.3 L+₹13,549.55 (0.33%) | L2 | Admitted-Finance |
| 3 | L3₹42.8 L+₹1.6 L (3.96%)Admitted-Finance AT KANTAPAHADA P S PO BANKI GHOLAPUR DIST CUTTACK | -20.99% | ₹42.8 L+₹1.6 L (3.96%) | L3 | Admitted-Finance |
| 4 | L4₹44.2 L+₹3.0 L (7.38%)Admitted-Finance | -18.39% | ₹44.2 L+₹3.0 L (7.38%) | L4 | Admitted-Finance |
| 5 | L5₹48.3 L+₹7.2 L (17.4%)Admitted-Finance AT JAYASANKHAPUR PO TALADANDA PS KUNJANG DIST JAGATSINGHPUR | -10.80% | ₹48.3 L+₹7.2 L (17.4%) | L5 | Admitted-Finance |
Tender Value
₹54.2 L
EMD Value
₹54,200
Closing Date
22 Jul 2026, 5:00 pmClosed
Superintending Engineer RWD, PLB
O/o the Superintending Engineer Rural Works Division, Phulbani
Construction of Revenue Inspectors office Cum Residence at Chakapada for the year 2025-26
2026_CERWI_135727_1
Online Tender/04/SERWD-PLB/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Phulbani
2 documents required · 2 mandatory
₹10,000
₹54,200
Yes
3 Aug 2026
14 Jul 2026
23 Jul 2026
14 Jul 2026
22 Jul 2026
14 Jul 2026
14 Jul 2026 - 21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil within initial leads and lifts including dressing and levelling the bed and depositing the excavated earth places away from work site including all cost of labour, T&P Royalty, Cess etc. complete in all respect as directed by the Engineer-in-charge. | 72.42 | cum | 282.89 | ₹20,486.89 |
| 2 | Filling foundation and plinth with fine coarse sand of approved quality with proper thick layer including watering, ramming with cost, conveyance, royalty, Cess and taxes of all materials and labour, T&P etc. complete as per specification and direction of the EIC | 65.45 | cum | 775.89 | ₹50,782 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and plinth using 4cm size clean hard black hand broken granite metal of approved quality from approved quarry including hoisting lowering & laying concrete in layers to the required level including cost conveyance and royalty of all materials with all taxes and compacting watering curing and all labour with T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-Charge. | 22.21 | cum | 6,589.12 | ₹1,46,344.36 |
| 4 | Providing and laying cement concrete (1:2:4) in foundation and plinth using 12mm size hard granite hand broken chips of approved quality from approved quarry including hoisting lowering and laying concrete in layers to the required thick including cost conveyance and Royalty Cess of al materials with all taxes and all labour with T&P required for the work etc. complete as per specification and direction of the Engineer-in-Charge. | 3.19 | cum | 8,415.59 | ₹26,845.73 |
| 5 | Fly ash brick work in CM (1:6) after immersing brick for six hours in water before use in foundation and plinth having crushing strength not less than 75Kg./Cm2 including splays cutting circular moulding and similar such type of work with necessary projections chamfering and corbelling watering and curing etc. complete including cost conveyance and royalty of all materials with all taxes and all labour with T&P articles required for the work etc. complete as per specifications and directions of E.I.C. | 25.38 | cum | 5,770.46 | ₹1,46,454.27 |
| 6 | Fly ash brick work in CM (1:6) after immersing brick for six hours in water before use in superstructure having crushing strength not less than 75Kg./Cm2 including splays cutting circular moulding and similar such type of work with necessary projections chamfering and corbelling watering and curing etc. complete including cost conveyance and royalty of all materials with all taxes and all labour with T&P articles required for the work etc. complete as per specifications and directions of E.I.C. | 21.39 | Cum | 5,803.79 | ₹1,24,143.07 |
| 7 | Fly ash brick work in CM (1:4) after immersing brick for six hours in water before use in superstructure having crushing strength not less than 75Kg./Cm2 including splays cutting circular moulding and similar such type of work with necessary projections chamfering and corbelling watering and curing etc. complete including cost conveyance and royalty of all materials with all taxes and all labour with T&P articles required for the work etc. complete as per specifications and directions of E.I.C. | 4.34 | cum | 6,029.2 | ₹26,166.73 |
| 8 | R.C.C. work of M-25 grde with 20mm down graded black hard granite crusher broken chips aggregates as per drawing and technical specification etc. complete with watering curing etc. including cost conveyance and Royalty, Cess of all materials with all taxes and compacting watering curing and all labour with T and P articles required for the work etc. complete as per specification and direction of the EIC (Column Base) | 13.05 | cum | 7,633.04 | ₹99,611.17 |
| 9 | Plinth Band | 4.69 | cum | 8,507.46 | ₹39,899.99 |
| 10 | Column in Superstructure (Ground Floor) | 3.9 | cum | 19,455.26 | ₹75,875.51 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.80 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_601384.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .