Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84,647Accepted-AOC | ₹84,647 Quoted ₹84,646.59 | L1 | Accepted-AOC Accepted Vide Resolution No.1(1) Dt.27-10-2025 of Thenkara GP |
| 2 | L2₹89,381.08Rejected-AOC | ₹89,381.08 | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | Space Builders L2 | MUNEER P L1 |
|---|---|---|---|---|---|
| 1.00Well maintenance | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.32 | cum | 2,129.84 ₹4,941.23 | 2,129.84 ₹4,941.23 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1.9 | cum | 257.63 ₹490.01 | 257.63 ₹490.01 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.88 | cum | 8,000 ₹7,032 | 7,932.89 ₹6,973.01 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.34 | cum | 9,235.97 ₹21,630.64 | 9,235.97 ₹21,630.64 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 2.98 | sqm | 386.16 ₹1,151.92 | 386.16 ₹1,151.92 |
| 1.01 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 0.25 | cum | 9,847.37 ₹2,491.38 | 9,847.37 ₹2,491.38 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7.59 | kilogram | 112.43 ₹853.34 | 112.43 ₹853.34 |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 13.26 | sqm | 500 ₹6,631.50 | 308.96 ₹4,097.74 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 190.36 | kg | 178.42 ₹33,964.03 | 178.42 ₹33,964.03 |
Updated dates
Tender Value
₹84,647
EMD Value
₹2,117
Closing Date
22 Oct 2025, 10:00 amClosed
Assistant Engineer
Office of the Assistant Engineer, LID EW Section, Thenkara Grama Panchayat
Proj.No.-425/26 Pulinkunnu public well renovation in ward 1 -100000/-
2025_LSGD_808614_19
05/AE/LSGD/THR/2025-26
Open Tender
Civil Works - Roads
Thenkara GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹2,117
8 May 2026
13 Oct 2025
23 Oct 2025
13 Oct 2025
22 Oct 2025
13 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1348895.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
425_SBD.pdf
Tender Documents • 1.77 MB
BOQ_1348895.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid