| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.4 L+₹85,812.75 (13.1%)Admitted-Finance 21 FIDDER ROAD MONDAL PARA PO TALPUKUR BARRACKPORE 24 PGS N PIN 700123 | BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 700123 | L2 | Admitted-Finance | ||
| 3 | L3₹7.4 L+₹86,897.15 (13.2%)Admitted-Finance 73 38 A N ROYBAGA A LANE TALPUKUR BARRACKPORE PIN 700119 | BARRACKPORE | 24 PARAGANAS NORTH | WEST BENGAL | 700119 | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical 38 JOY GOPAL ROYCHOWDHURY ROAD PANIHATI KOLKATA KOLKATA KOLKATA 700114 | 24 PARAGANAS NORTH | WEST BENGAL | 700114 | - | Rejected-Technical Shortfall documents of EPF and ESI Registration Certificate along with current monthly conformity receipts as per NIT as asked for in the shortfall process not submitted | ||
| 5 | Rejected-Technical 36 JESSORE ROAD HRIDAYPUR RATHTALA NORTH 24 PARGANAS | - | Rejected-Technical Shortfall documents of EPF and ESI Registration Certificate along with current monthly conformity receipts as per NIT as asked for in the shortfall process not submitted |
Tender Value
₹7.2 L
EMD Value
₹14,460
Closing Date
18 Sept 2026, 5:00 pmClosed
EE, DIV-IV (BSUP),HS, KMDA
OFFICE OF THE EXECUTIVE ENGINEER DIVISION-IV, HOUSING SECTOR (BSUP), KMDA. UNNAYAN BHAWAN, BLOCK A (6TH FLOOR), SALT LAKE CITY, KOL-91
Repairing and renovation of concrete pathway and allied civil works at Ramkrishna Sarada Mission Vivekananda Vidyabhavan at 33, Sree Maa Sarada Sarani, Kolkata- 700055
2026_KMDA_1041330_1
19/EE/DIV-IV/Housing (BSUP)/KMDA of 2026-2027
Open Tender
CIVIL WORKS
Percentage
45 days
33, Sree Maa Sarada Sarani
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹14,460
30 Sept 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing compound premises of shurbs,plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | 700 | Sqm | 11 | ₹7,700 |
| 2 | Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank,drain and compound including cutting, loading, unloadingto and from truck or cart by Mathor labour & removing thesame to any distance. | 10 | Cum | 56.62 | ₹566.2 |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 2 | Cum | 447 | ₹894 |
| 4 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 304.5 | Cum | 119.27 | ₹36,317.72 |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes.a) Pakur Variety | 29.4 | Cum | 5,177.76 | ₹1,52,226.14 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. i) In ground floor | 14 | Sqm | 335 | ₹4,690 |
| 7 | Brick work with 1st class bricks in cement mortar (1:4). (a) In foundation and plinth | 42 | Cum | 5,612.15 | ₹2,35,710.3 |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] ii) With 1:4 cement mortar (a) 20 mm thick plaster (external). | 196 | Sqm | 188.97 | ₹37,038.12 |
| 9 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 122.6 | Cum | 936.21 | ₹1,14,779.35 |
| 10 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation | 215 | Cum | 77.54 | ₹16,671.1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_2556853.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .