Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Fee/PreQual/Technical/Finance | -18.00% | ₹13.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.5 L+₹47,666.44 (3.67%)Admitted-Fee/PreQual/Technical/Finance AT BRAHMANIGAON DIST KEONJHAR PIN 758001 | KEONJHAR | KEONJHAR | ODISHA | 758001 | -14.99% | ₹13.5 L+₹47,666.44 (3.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹13.5 L+₹47,666.44 (3.67%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹13.5 L+₹47,666.44 (3.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹14.9 L+₹1.9 L (14.6%)Admitted-Fee/PreQual/Technical/Finance | -6.00% | ₹14.9 L+₹1.9 L (14.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-DD has been submitted in place of EMD |
Tender Value
₹15.8 L
EMD Value
₹16,000
Closing Date
17 Jun 2026, 5:30 pmClosed
Executive Engineer (Agril.), Kandhamal
O/o Executive Engineer (Agril.), Kandhamal Division, Phulbani
FURNISHING AND MODERNIZATION OF SOIL TESTING LABORATORY, PHULBANI, KANDHAMAL
2026_AGRIL_131315_1
E.E(A) KANDHAMAL DIVISION-01/2026-27
Open Tender
Civil Works - Others
Percentage
Phulbani
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Executive Engineer (Agril.), Kandhamal
₹16,000
Yes
28 Jul 2026
8 Jun 2026
22 Jun 2026
8 Jun 2026
17 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and fixing of Wall paneling made of aluminum anodised section framing conforming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9mm thick with melamine polishing complete.BWR ply with 4mm thick veneer pasting finished | 0.2 | sqm | 2,628.33 | ₹525.67 |
| 2 | Providing fitting and fixing of false ceiling with Aluminum anodised T Section No. 3215 with 2'-0 center to center, L section NO. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and P.V.C plug and the Aluminium grid 2-0 x 2" - 0" with India Gypsum board of 125mm thick. etc. complete. | - | sqm | 999.85 | - |
| 3 | Finishing surface of wall with Acrylic wall puty ( water based) of approved make and finished smooth and even surfaces to receive painting including cost of scaffolding staging charges with cost of all materials, tax, labour T&P etc complete
Ground Floor | 1 | sqm | 120.67 | ₹120.55 |
| 4 | Earthwork in excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling | 1 | cum | 274.15 | ₹273.88 |
| 5 | Filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. | 1 | cum | 538.53 | ₹537.99 |
| 6 | C.C.(1:4:8) with 4 c.m. size h.g. metal in F&P. | 1 | cum | 5,939.31 | ₹5,933.37 |
| 7 | C.C.(1:2:4) with 12 m.m. size h.g. metal in F&P and above | - | cum | 7,962.85 | - |
| 8 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50 m lead | 0.4 | sqm | 57.13 | ₹22.85 |
| 9.01 | Primimg one coat with any approved primer over wall surface including cost of primer.
Ground Floor | 1 | sqm | 83.77 | ₹83.69 |
| 9.02 | First Floor | - | sqm | 85.76 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.40 MB
BOQ_594952.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .