Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.6 L
EMD Value
₹27,282
Closing Date
28 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Div-II, AMC
O/O the Executive Engineer, Div-II, AMC
Construction of pucca drain starting from H.O Nayan Chakraborty to H.O Uttam Marak at Marak Para, under ward no.06, AMC
2026_SAMC_78412_1
41/Div-II/AMC/2026-27
Open Tender
Civil Works
Percentage
90 days
Ward No.06, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹27,282
Yes
17 Oct 2026
17 Oct 2026
28 Oct 2026
17 Oct 2026
28 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil | 186.4 | Cum | 231.6 | ₹43,170.24 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting
each layer by using plate compactor or by any suitable method complete | 23.3 | Cum | 1,177.3 | ₹27,431.09 |
| 3 | Providing and laying flat brick flooring in required pattern complete. | 233 | Sqm | 701.2 | ₹1,63,379.6 |
| 4 | Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | 23.3 | Cum | 9,938.6 | ₹2,31,569.38 |
| 5 | First class brick work in foundation and plinth
including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 79.9 | Cum | 9,845.2 | ₹7,86,589.15 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone
aggregate 20 mm nominal size) | 398.43 | Sqm | 281 | ₹1,11,958.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
DNIet41.pdf
Tender Documents • 2.86 MB
BOQ_79821.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .