Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.1 LAccepted-AOC AT GUNDIADIHI P O DANDPANI PS KINJIRKELA DIST SUNDARGARH ODISHA PIN 770012 | KINJIRKELA | SUNDARGARH | ODISHA | 770012 | ₹47.1 L | L1 | Accepted-AOC Accepted |
| 2 | L1₹47.1 LRejected-AOC | ₹47.1 L | L1 | Rejected-AOC Rejected |
| 3 | L1₹47.1 LRejected-AOC AT BICHHUANBAHAL SARAPHGARH DIST SUNDARGARH PIN 770012 | SARAPHGARH | SUNDARGARH | ODISHA | 770012 | ₹47.1 L | L1 | Rejected-AOC Rejected |
| 4 | L1₹47.1 LRejected-AOC | ₹47.1 L | L1 | Rejected-AOC Rejected |
| 5 | L1₹47.1 LRejected-AOC | ₹47.1 L | L1 | Rejected-AOC Rejected |
Tender Value
₹47.2 L
EMD Value
₹47,169
Closing Date
20 Apr 2026, 5:30 pmClosed
S.E. M.I. Division, Sundargarh
O/o the Superintending Engineer, MI Division, Sundargarh, At/PO- Mahesdihi
Improvement to Kanakjore MIP (D/W) in Tangarpali Block of Sundargarh District under Improvement to Diversion Weir Scheme 2025-26.
2026_CEMIB_128013_1
SE MID SNG 01/2026-27
Open Tender
Civil Works - Others
120 days
Tangarpali Block
B class contractor
2 documents required · 2 mandatory
₹6,000
₹47,169
Yes
21 May 2026
10 Apr 2026
21 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
10 Apr 2026 - 20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement and depositing the debries crear from work site etc complete as per the direction of Engineer in charge. | - | Sqm | - | - | BI01010001010000000000000515BI0100001115 |
| 2 | Excavation, loading, unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC with all lead from the place of excavation etc complete as directed by the Engineer-in-charge. (Desilting) (Measurement will be taken on finished level section) | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC with all lead from the place of excavation etc complete as directed by the Engineer-in-charge. (Excavation of foundation) | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 4 | Filling in foundation and plinth with sand watering and ramming etc complete as directed by the Engineer-in-charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 5 | Cement concrete in M-15 grade using 20mm down graded size crusher broken granite metal of approved quality quarried and free from weathered skins and foreign materials including mixing the materials by use of concrete mixtures and laying concrete in layers not exeeding 0.15 m. in depth to required level require level, curing, vibrating with vibrators, finishing etc with all leads lifts and delifts complete in all respect to proper profile and leveling including dewatering if necessary and cost, conveyance and royality and other taxes etc of materials including hire and running charges of the machineries complete as directed by the Engineer-in-charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001119 |
| 6 | Reinforcement Cement concrete in M-20 grade using 20mm down graded size crusher broken granite metal of approved quality quarried and free from weathered skins and foreign materials including mixing the materials by use of concrete mixtures and laying concrete in layers not exeeding 0.15 m. in depth to required level, curing, vibrating with vibrators, finishing etc with all leads lifts and delifts complete in all respect to proper profile and leveling including dewatering if necessary and cost, conveyance and royality and other taxes etc of materials including hire and running charges of the machineries complete as directed by the Engineer-in-charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 7 | Straightening, cutting, bending, binding , fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost, conveyance & all taxes of reinforcement as directed by the Engineer-in-Charge. | - | Qntl | - | - | BI01010001010000000000000515BI0100001121 |
| 8 | Rigid smooth centering, shuttering for concrete works (with or without nominal renforcement) including false works and dismentling then after casting for reuse and making good to the damaged surface where necessary with cost conveyance of materials, taxes and labour T & P etc. complite in all respect as per the direction of the Engineer-in charge. | - | Sqm | - | - | BI01010001010000000000000515BI0100001122 |
| 9 | Filling foundation and plinth with excavated materials and watered and rammed etc complete as directed by the Engineer-in-Charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001123 |
| 10 | Excavation, loading, unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC with all lead from the place of excavation etc complete as directed by the Engineer-in-charge.(Royalty will be deducted) (Deduct 12.50% quantity for settlement) | - | Cum | - | - | BI01010001010000000000000515BI0100001124 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587586.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 7.33 MB
BOQ_587586.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid