| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹5.6 LAccepted-AOC | l1 | Accepted-AOC L1 | |
| 2 | l2₹6.3 L+₹59,844.98 (10.6%)Rejected-AOC | l2 | Rejected-AOC L2 |
Tender Value
₹5.3 L
EMD Value
₹13,373
Closing Date
16 Oct 2019, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER PWD BUILDINGS SUBDIVISION THRISSUR
SR works
2019_PWD_305666_1
25/2019-20/AEE/B/TSR
Open Tender
Civil Works - Buildings
Item Rate
90 days
Ayyanythole
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Yes
online
₹13,373
Yes
22 Jan 2020
3 Oct 2019
19 Oct 2019
3 Oct 2019
16 Oct 2019
3 Oct 2019
Amount
Septic tank cleaning
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
od39185/2018_2019 : Engaging Wood cutter
od32229/2018_2019 : Desludging the existing tank and depositing the sludge into the excavated pit and refill the pit including all labour and hire charges etc. complete.
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
od90265/2018_2019 : Supplying and fixing 100cm or nearest available size dia precast concrete perforated rings and holes on the ring wall in dispersion /leach pits pointed the joints by cement mortar 1:4 including trenching and refillings as per direction of engineer in charge
od32230/2018_2019 : Engaging scavengers
od32231/2018_2019 : Engaging coolie
15.31 : Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
15.14.1 : Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above
50.9.13.1 : Supplying and fixing Anjily wood wrought and put up for roof members including cost and conveyance of materials etc. complete .
50.9.13.2 : Supplying and fixing Pingoda wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
50.9.13.4 : Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
50.9.14.2 : Supplying and fixing Pingoda wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete.
50.9.14.4 : Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc . complete.
14.52.1 : Painting with oil type wood preservative of approved brand and manufacture:Old work ( one or more coats)
12.5.1 : Providing valleys of 90 cm wide overall in plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limper and bitumen washers complete:1.60 mm thick with zinc coating not less than 350 gm/ m2
od8654/2019_2020 : : Supplying and stacking MP Hip and Ridge Tiles including all cost and conveyance charges etc. complete
od8685/2019_2020 : Supplying and stacking MP Tiles including all cost and conveyance charges etc. complete.
od8680/2019_2020 : Setting dept. MP hip and ridge tiles in lime mortar 1:2 including finishing edges including all cost of materials, labour charges etc. complete
od8681/2019_2020 : : Roofing with deptl. MP tiles including labour charges etc. complete
K.P.AJAYAN
Bidder Name
Baiju v.p
K.P.AJAYAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_419128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .