Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,595.85Accepted-AOC | ₹96,595.85 Quoted ₹96,596 | L1 | Accepted-AOC agreement exicuted on 13-03-2026 |
| Sl No | Description | Qty | Unit | SIBI JOSEPH L1 |
|---|---|---|---|---|
| 1.00RETAINING WALL | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 15.95 | cum | 204.39 ₹3,260.02 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 2.17 | cum | 6,507.77 ₹14,154.4 Lowest |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 10.15 | cum | 6,886.24 ₹69,895.34 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 29 | sqm | 320.21 ₹9,286.09 Lowest |
Tender Value
₹1.0 L
EMD Value
₹2,545
Closing Date
15 Sept 2025, 2:00 pmClosed
Assistant Engineer
LID EW Thodupuzha Municipality
CONSTRUCTION OF R E T A I N I N G W A L L I N KORUMALAKKUNU WARD
2023_LSGD_568902_23
12/22-23/AEE/LSGD/TDPZ/PRICE3 E- TENDER
Open Tender
Civil Works - Roads
Item Rate
180 days
Thodupuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,545
Yes
7 Jul 2026
8 Sept 2025
16 Sept 2025
8 Sept 2025
15 Sept 2025
8 Sept 2025
8 Sept 2025 - 15 Sept 2025
Amount
RETAINING WALL
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Bidder Name
SIBI JOSEPH
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .