Construction of Community Hall at Mallipalli Village of Kalyandurgam Mandal
987271
Nit No.2/ MPLADS / 2026-27, Dt.27.08.2026 of EE PRI ATP 1st Call
OPEN - NCB
Buildings
ANANTHAPUR
7 documents required · 7 mandatory
₹439
₹12,374
11 Sept 2026
11 Sept 2026
11 Sept 2026
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges complete for Foundation of Building.(APSS No. 308) for compound wall
Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials etc., complete for finished item of work for Foundations (APSS No. 402)
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings Pedestals
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings Plinth beams
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings upto plinth level
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings upto Roof level
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings Lintel beams
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings Sun Shades
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings MBG+13 Roof beams
Vibrated Reinforced Cement Concrete M 20 Nominal mix using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403) : Columns Footings Roof Slab 125 mm thick
Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry including Cost and Conveyance of all materials like Granite stones, cement, sand, water, etc., to site including all operational, incidental,
Brick masonry using Fly ash cement bricks of size 290x225x140 mm in 4 CM(1:8) mix including cost and conveyance of all materials and labour charges etc..complete per 1 cum
Supply and fixing of MS Iron Doors, widows & Ventilators including cost and conveyance of all materials and labour charges
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including Cost and Conveyance of all materials complete for finished item of work (APSS No. 901 & 903).(CSSR)
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. ornamental ceilings
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901 & 904) External walls
Flooring with Double Charged stain free porcelain Vitrified tiles of size 600 X 600 mm and thickness between 8-10 mm Ist quality confirming to IS:13711, IS:13712, IS:13630 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
Providing skirting to internal walls to 15 cm height/risers of steps with Double Charged stain free porcelain Vitrified tiles of size 600 X 600 mm and thickness between 8-10 mm length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
White Washing two coats with Whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of 23 loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
Painting to new walls with synthetic polymer Luxury plastic emulsion paint having VOC ( Volatile organic paint content less than 50gms/lt of approved brand and shade over a base coat of appropriate primer of approved brand , making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials , including cost and conveyance of all materials to work site and all operational , incidental , labour charges etc excluding seignorage charges for f9inished item of work INTERNAL WALLS .
Painting to new walls with synthetic polymer Luxury plastic emulsion paint having VOC ( Volatile organic paint content less than 50gms/lt of approved brand and shade over a base coat of appropriate primer of approved brand , making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials , including cost and conveyance of all materials to work site and all operational , incidental , labour charges etc excluding seignorage charges for f9inished item of work EXTERNAL WALLS .
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.
Supply and Fixing of 25mm dia 1.80 mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with hot dip galvanised metal box including all labour charges etc., complete
Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 8 modular cover frame covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings using Modular Switches
Supply and fixing of 6A 3 pin wall plug Modular socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete using Modular Switches and Sockets
Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 7W LED bulb (for new installation)
Supply,Transportation and fixing of 20W, 2000 lumens, 1200 mm length LED batten light, input voltage AC 220-260 Volts with PF>0.9, surge protection : 2KV,THD<15%, with inbuilt driver and and frosted cover CCT:3000K-5700K, minimum CRI>70, etc., complete including cost and conveyance of all materials including frame and tube etc., complete
Fixing of tube light luminaire on wall with all accessories including giving connections and all labour charges etc., complete
Supply and errecting Modular type Electronic stepped type regulators for Ceiling fans complete errected on existing board
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FR P.V.C. insulated flexible copper cable(ISI Mark) in existing pipe for mains including all labour charges etc., complete
Supply and fixing 8 Way DP SPN Distribution board with IP-43 protection suitable for single phase DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete with 63A DP Isolator - 1 No for incomer, 20A SP MCBs - 1Nos, 16A SP MCBs - 3 Nos & 10A SP MCBs - 1 No for outgoing including cost and conveyance of all materials and labour charges etc., complete
Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2 Mallipalli Tender Document.doc
TENDER_DOCUMENT • 0.52 MB
2 Mallipalli BOQ1.xlsx
TENDER_DOCUMENT • 0.34 MB
2 Mallipalli Schedule 15.00Lakhs.xlsx
TENDER_DOCUMENT • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .