| 1 | L1₹38.2 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder is Sri. Varghese Mathew Agreement executed on 25/09/2024.Agreement No. 06/EEI/KLM/2024-25 | |
| 2 | L2₹38.2 L+₹548.49 (0.01%)Rejected-Finance | L2 | Rejected-Finance Being L2 Bidder | |
| 3 | L3₹38.2 L+₹1,972.42 (0.05%)Rejected-Finance | L3 | Rejected-Finance Being L3 Bidder | |
| 4 | L4₹39.2 L+₹97,204.22 (2.54%)Rejected-Finance | L4 | Rejected-Finance Being L4 Bidder |
Tender Value
₹46.6 L
EMD Value
₹50,000
Closing Date
3 Sept 2024, 4:00 pmClosed
Executive Engineer
Executive Engineer, Irrigation Division Kollam
RESTORATION AND DEBRIS REMOVAL RANNI ANGADI
2024_Irrig_687989_1
IRR/IA/TR/1828/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Ranni
please refer tender documents
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
27 Sept 2024
27 Aug 2024
5 Sept 2024
27 Aug 2024
3 Sept 2024
27 Aug 2024
27 Aug 2024 - 3 Sept 2024
Amount
removal of silt and debris and restoration work
OD32163/2022-2023:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth to the specified location as directed by the department officers at site, disposed earth to be levelled and neatly dressed.All kinds of soil
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
ANIL V VARGHESE
P V SOMASEKHARAN NAIR
Mon Joseph
Bidder Name
Mon Joseph
VARGHESE MATHEW
ANIL V VARGHESE
P V SOMASEKHARAN NAIR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1070575.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .