Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance | -28.00% | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.7 Cr+₹5,147.66 (0.01%)Admitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | -27.99% | ₹3.7 Cr+₹5,147.66 (0.01%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 Cr+₹4.6 L (1.25%)Admitted-Finance AT BELTIKIRI SADAR DHENKANAL | -27.10% | ₹3.8 Cr+₹4.6 L (1.25%) | L3 | Admitted-Finance |
| 4 | L4₹3.8 Cr+₹5.0 L (1.36%)Admitted-Finance | -27.02% | ₹3.8 Cr+₹5.0 L (1.36%) | L4 | Admitted-Finance |
| 5 | L5₹3.8 Cr+₹8.7 L (2.35%)Admitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | -26.31% | ₹3.8 Cr+₹8.7 L (2.35%) | L5 | Admitted-Finance |
Tender Value
₹5.1 Cr
EMD Value
₹5.1 L
Closing Date
20 Jun 2026, 5:00 pmClosed
Chief Construction Engineer,KIP,Basudevpur
O/o the CCE.KIP,Basudevpur
Construction of Left Side RCC Box and Open Catch Water Drain at Birikala R and R Colony for the DPs of village Birikala and Gobindapur of KIP.
2026_KPRIP_131305_1
CCE,KIP(KRC AND BD)-01/2026-27
National Competitive Bid
Civil Works - Canal
Percentage
270 days
SE Kanupur Reh. C and B Division Basudevpur
Please refer tender documents
3 documents required · 3 mandatory
₹10,000
₹5.1 L
Yes
29 Aug 2026
6 Jun 2026
22 Jun 2026
6 Jun 2026
20 Jun 2026
6 Jun 2026
6 Jun 2026 - 20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation, loading and carriage by mechanical means in D.I. rock, laterite and soft rock not requiring blasting interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete as per the direction of the Engineer-in-charge. | 1 | Cum | 103.8 | ₹103.7 |
| 2 | Filling foundation and plinth with excavated material with well compacted etc. complete as per the direction of the Engineer-in-charge. | 1 | Cum | 187.6 | ₹187.41 |
| 3 | Filling foundation & plinth with coarse sand watering ramming with cost,coveyance ,royalty and Labour charges etc complete and as per the Direction of the Engineer-in-charge. | - | Cum | 1,158.5 | - |
| 4 | C.C. work of M-15 grade with 40mm Size and down grade hard granite (crusher broken) stone chips for C.C works including hoisting and laying including cost of all materials labour charges as per the direction of the Engineer-In-Charge. | 1 | Cum | 5,811.3 | ₹5,805.49 |
| 5 | C.C. / R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying as per the direction of the Engineer-In-Charge. | - | Cum | 6,955.2 | - |
| 6 | Supplying, Cutting , straightening, coiled or bent up M.S Rod or Tor steel bending, binding welding and joinging if necessary and tying the grills and placing in position as required for RCC work and providing fan hooks hoisting lowering and including cost, conveyance of M.S rods or tor steel and binding wire of 18 to 20 gause required for the work for bending, binding and tying the grills (payment will be made on weight of M.S Rod or Tor steel only and no separate payment will be made towards the weight of binding wire) etc. complete as directed by the Engineer-in-charge . | 1 | Qntl | 9,246.6 | ₹9,237.35 |
| 7 | Providing weep hole on the back of abutment and wing wall with 90mm dia PVC pipe, extending throughthe full width of the structure with slope of IV:20H towards drawing foce. complete as per drawing and Technical including cost of centering,shuttering etc complete as per the direction of Engineer-in- charge. | 1 | Rm | 280.8 | ₹280.52 |
| 8 | Providing formwork for concrete with F1 finish for upstream faces of dam,spillway,glacis of barrage,unexposed surface of foundation,block joints etc with steel shutters ,rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour,materialss and T & P complete as directed by the Engineer-in-charge. | 1 | Sqm | 924.3 | ₹923.38 |
| 9 | Rigid and smooth centering and shuttering for C.C. / R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor as per the direction of Engineer-in-charge. | - | Sqm | 249.1 | - |
| 10 | Providing expansion with bitumen in cement concrete work with cost, conveyance and labour charges for providing expansion joint ete complete as per the direction of Engineer-in-charge. (12 mm) | - | Sqm | 747.4 | - |
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
BOQ_594911.xls
BOQ • 0.28 MB
TsRCCDrainmerged.pdf
Tender Documents • 6.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .