| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-Finance | ₹3.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.2 Cr+₹99,516.51 (0.31%)Rejected-Finance 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | ₹3.2 Cr+₹99,516.51 (0.31%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.2 Cr+₹1.7 L (0.52%)Rejected-Finance | ₹3.2 Cr+₹1.7 L (0.52%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.3 Cr
EMD Value
₹7.8 L
Closing Date
25 May 2026, 5:00 pmClosed
GM-(CIVIL)
Main Administrative Building Sector-6 Noida
M/o Drain (Construction of RCC Drain and Covering with Precast Drain Cover on 30.00M Wide Road in between Sec-125 and 126) Noida
2026_NOIDA_1146774_1
08/GM(C)/SM-WC-09/ET/2026-27
Open Tender
Civil Works
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹7.8 L
16 Jul 2026
8 May 2026
26 May 2026
8 May 2026
25 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 2,772 | Cum | 136 | ₹3,76,992 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 20 mm nominal size) | 416 | cum | 5,746.88 | ₹23,90,702.08 |
| 3 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as perdirection of the Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix isyable/recoverable separately).All works upto plinth level All works upto plinth level | 1,135 | Cum | 7,912.3 | ₹89,80,460.5 |
| 4 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in shelves, including setting in cement mortar 1:3 (1cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but, excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 180 | Cum | 13,895.7 | ₹25,01,226 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically treated bars of Grade Fe-500D or More | 1,83,499 | Kg | 82.81 | ₹1,51,95,552.19 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 528 | Sqm | 181.64 | ₹95,905.92 |
| 7 | Centering and shuttering including strutting, propping etc. and removal
of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 6,336 | Sqm | 335.55 | ₹21,26,044.8 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 117 | Cum | 6,753.45 | ₹7,90,153.65 |
| 9 | Pumping out Water Caused by Springs , tidal or River Seepage , Briken water Mains or Drain and the Like. | 1,000 | K-Litre | 100.34 | ₹1,00,340 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,310 | Cum | 93 | ₹1,21,830 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
TD.pdf
Tender Documents • 5.11 MB
BOQ_2144683.xls
BOQ • 0.27 MB
Capability.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .