Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹3.0 L
EMD Value
₹5,900
Closing Date
11 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of Drain from H/o Gh nabi mir and akbar mir upto transformer at Gutiyar under ADF (PRI) for year 2026--27 ,P/H Gutiyar , Block Baramulla)
2026_RDPR_319571_12
184/Xen/Rew/Bla/2026-27 Dated 05/08/2026
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,900
27 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soils | 28.94 | cum | - | - |
| 2 | Supplying and laying of stone soling hand packed tightly incl ramming watering and filling of interstices and inl carraige of material | 15.37 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 7.33 | cum | 1 | ₹7.32 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 | 22.9 | cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for foundation | 127 | sqm | 1 | ₹126.87 |
| 6 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 174.9 | sqm | 1 | ₹174.73 |
| 7 | Add for carraige of materials for sand and bajri for 25 km lead | 43.2 | cum | - | - |
| 8 | P/F of information sign board and site photographs. | - | Job | - | - |
stage.html
html • 0.02 MB
finance_1059070.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1059070.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].