| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.8 LAccepted-Finance | ₹42.8 L | L1 | Accepted-Finance Quoted L1 Rate |
| 2 | L2₹44.2 LRejected-Finance | ₹44.2 L | L2 | Rejected-Finance Quoted L2 Rate |
| Sl No | Description | Qty | Unit | VGM CONSTRUCTIONS L2 | PS ABDULJALIL CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road Vaiyapuripatti to Vellalapatti road km 0/0-1/060 in Vellalapatty Panchayat. R- 227(VPR).Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification | 1,272 | sqm | 7 ₹8,904 | 5.8 ₹7,377.60 |
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning | 1,325 | sqm | 25 ₹33,125 | 21.6 ₹28,620 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 715.5 | cum | 140 ₹1.0 L | 131.1 ₹93,802.05 |
| 4.00 | Providing and Laying Gravel tocompacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0 - 1/060 | 127.2 | cum | 355 ₹45,156 | 336 ₹42,739.20 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 1/060 | 496.88 | cum | 2,480 ₹12.3 L | 2,452 ₹12.2 L |
| 6.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0 1/060 | 3,975 | sqm | 95 ₹3.8 L | 83.4 ₹3.3 L |
| 7.00 | Applying TACK COAT over WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0 1/060 | 3,975 | sqm | 26 ₹1.0 L | 19.7 ₹78,307.50 |
| 8.00 | 8.BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 119.25 | cum | 12,000 ₹14.3 L | 11,926 ₹14.2 L |
| 9.00 | Provision for KM Stone | 1 | nos | 3,000 ₹3,000 | 2,700 ₹2,700 |
| 10.00 | Provision for HM Stone | 4 | nos | 1,000 ₹4,000 | 770 ₹3,080 |
Tender Value
₹45.9 L
EMD Value
₹46,000
Closing Date
2 Jul 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
strengtheningthe road Vaiyapuripatti to Vellalapatti Road,Vellalapatti Panchayat ,Vaiyampatti Block,Tiruchirappalli District under NABARD XXXI 2025-26,Pkg28
2025_RDTN_567880_28
DIPR/2866/Tender/2025 dt 06.06.2025
Open Tender
Civil Works - Roads
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹46,000
DRDA Tiruchirappalli
1 Apr 2026
14 Jun 2025
2 Jul 2025
14 Jun 2025
2 Jul 2025
14 Jun 2025
17 Jun 2025
Amount
Strengthening the road Vaiyapuripatti to Vellalapatti road km 0/0-1/060 in Vellalapatty Panchayat. R- 227(VPR).Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification
Picking 5 cm to 10 cm old metalled surface and sectioning
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and Laying Gravel tocompacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0 - 1/060
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 1/060
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0 1/060
Applying TACK COAT over WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0 1/060
8.BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for KM Stone
Provision for HM Stone
Provision for Cautionary Sign Board
60cm Equilateral Triangle Cautonary Sign Board
60 CM Circle Mandatory Sign
Cheveron Sign 90 CM Octogon (Curves)
Towards the charges for routline maintenance of the road work executed under NABARD XXXI including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
VGM CONSTRUCTIONS (BID ID -1377980)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.86 MB
TechBid28.pdf
Tender Documents • 0.77 MB
PriceBid28.pdf
Additional Documents • 0.29 MB
BOQ_679786.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid