Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.3 Cr
Closing Date
18 Aug 2026, 5:00 pm
CCE ABP, SALAPADA
CCE ABP, SALAPADA
CONSTRUCTION OF DISTRIBUTION SYSTEM FOR 5177.98 HA. OF CCA INCLUDING COMMAND AREA DEVELOPMENT(CAD) OF SALANDI LEFT MAIN CANAL FROM RD 59.970 KM TO 60.304 KM THROUGH UNDER GROUND PIPE LINE IRRIGATION SYSTEM (GRAVITY FLOW) OF ABP
2026_CCEAB_135127_1
CCEABP-05 of 2026-27
National Competitive Bid
Miscellaneous Works
Turn-key
720 days
CCE ABP, SALAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.3 Cr
Yes
CCE ABP, SALAPADA
18 Aug 2026
10 Jul 2026
19 Aug 2026
10 Jul 2026
18 Aug 2026
10 Jul 2026
10 Jul 2026 - 19 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Execution of canal distribution network including Command Area Development (CAD) works up to 1 hectare chak for Salandi Left Main Canal from RD 59.970 km to 60.304 km of Anandapur Barrage Project through Under Ground Pipe Line System (Gravity Flow) for CCA of 5177.98 Ha. on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical Bid Document, guidelines of CWC, Govt. of India and IS standards. | - | Nos | 1 | - |
| 2 | Execution of Micro Irrigation System for 518.00 Ha beyond the CCA of 5177.98 Ha. of Salandi Left Main Canal from RD 59.970 km to 60.304 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt. of Indiaand IS standards. | - | Nos | 1 | - |
| 3 | Operation & Maintenance for Distribution Network including CAD works for 5177.98 Ha. CCA of Salandi Left Main Canal from RD 59.970 km to 60.304 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide successful irrigation for five years or five Khariff / five Rabi crop season whichever is later after commissioning of UGPL irrigation system as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt.of India. | - | Nos | 1 | - |
| 4 | Operation & Maintenance for micro irrigation system network for 518.00 Ha beyond the CCA of 5177.98 Ha. of Salandi Left Main Canal from RD 59.970 km to 60.304 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide successful irrigation for five years or five Khariff / five Rabi crop season whichever is later after commissioning of UGPL irrigation system as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt. of India. | - | Nos | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_600688.xls
BOQ • 0.36 MB
INDEX.pdf
Additional Documents • 3.22 MB
BID.pdf
Tender Documents • 6.92 MB
dtcor.pdf
PDF • 0.10 MB
cor1.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].