| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance Quoted L1 Rate |
| 2 | L2₹1.2 Cr+₹49,920.99 (0.41%)Rejected-Finance | ₹1.2 Cr+₹49,920.99 (0.41%) | L2 | Rejected-Finance Quoted L2 Rate |
| 3 | L3₹1.3 Cr+₹7.1 L (5.91%)Rejected-Finance | ₹1.3 Cr+₹7.1 L (5.91%) | L3 | Rejected-Finance Quoted L3 Rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not Qualified |
| Sl No | Description | Qty | Unit | PANDIYAN K L3 | N PERUMAL L1 | THILLAI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Strengthening The Road From Uaniyur Road To Thirunadu Road KM 0/0-2/500 (R - 1428) VPR. Clearing the light jungle including al labour charges for cutting, burring, buried etc. complete. | 3,000 | Sqm | 6 ₹18,000 | 5.9 ₹17,700 Lowest | 5.93 ₹17,790 |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 2,696.87 | Cum | 136 ₹3,66,774.32 | 131.2 ₹3,53,829.34 | 131.15 ₹3,53,694.5 Lowest |
| 3.00 | Picking 5 cm to 10 cm old Metalled surface and Sectioning 1 Sq.m | 3,125 | Sqm | 25 ₹78,125 | 21.8 ₹68,125 Lowest | 21.81 ₹68,156.25 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 150 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 1,404.62 | Cum | 2,600 ₹36,52,012 | 2,564.3 ₹36,01,867.07 | 2,561.77 ₹35,98,313.38 Lowest |
| 5.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it. | 9,364.12 | Cum | 95 ₹8,89,591.4 | 83.4 ₹7,80,967.61 | 83.37 ₹7,80,686.68 Lowest |
| 6.00 | Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 9,375 | Cum | 25 ₹2,34,375 | 19.7 ₹1,84,687.5 Lowest | 25 ₹2,34,375 |
| 7.00 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 281.25 | Cum | 13,000 ₹36,56,250 | 12,045.1 ₹33,87,684.38 | 12,033.12 ₹33,84,315 Lowest |
| 8.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction km 0/0-1/0 | 337.5 | Cum | 400 ₹1,35,000 | 349.7 ₹1,18,023.75 | 349.39 ₹1,17,919.13 Lowest |
| 9.00 | KM 1/00-2/00 | 337.5 | Cum | 400 ₹1,35,000 | 349.74 ₹1,18,037.25 | 349.39 ₹1,17,919.13 Lowest |
| 10.00 | KM 2/000-2/500 | 167.77 | Cum | 400 ₹67,108 | 349.74 ₹58,675.88 | 349.39 ₹58,617.16 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
8 Jul 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
strengthening the road from Unaiyur Road to Thirunadu Road,Marungapuri Block,Tiruchirappalli District under NABARD XXXI 2025-26,Pkg31
2025_RDTN_567880_31
DIPR/2866/Tender/2025 dt 06.06.2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.3 L
DRDA Tiruchirappalli
1 Sept 2025
16 Jun 2025
8 Jul 2025
16 Jun 2025
8 Jul 2025
16 Jun 2025
17 Jun 2025
Amount
Strengthening The Road From Uaniyur Road To Thirunadu Road KM 0/0-2/500 (R - 1428) VPR. Clearing the light jungle including al labour charges for cutting, burring, buried etc. complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking 5 cm to 10 cm old Metalled surface and Sectioning 1 Sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 150 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction km 0/0-1/0
1.50 m span RCC Slab Culvert at ch 2050 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Provision For Tar paper
Provision For Weep Holes
Cautionary Sign Board
60 Cm Equilateral Triangle Cautionary SignBoard
Reflector (Near Culvert & Trees) - Star Sign Sticker
HM Stone
KM Stone
Road Marker/ Road Stud With Lens Reflector
Towards the charges for routline maintenance of the road work executed under NABARD XXXI including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
THILLAI CONSTRUCTION (BID ID -1387696)
PANDIYAN K (BID ID -1378365)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .