| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.3 LAccepted-AOC | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹65.9 L+₹3.5 L (5.66%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest | |
| 3 | L3₹66.4 L+₹4.1 L (6.50%)Rejected-AOC | L3 | Rejected-AOC 3rd lowest | |
| 4 | L4₹66.6 L+₹4.2 L (6.77%)Rejected-AOC CHIRA GHORAWAL SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | L4 | Rejected-AOC 4th lowest | |
| 5 | L5₹68.2 L+₹5.8 L (9.34%)Rejected-AOC | L5 | Rejected-AOC 5th lowest |
Tender Value
₹75.8 Cr
Closing Date
18 Dec 2017, 9:00 amClosed
FLOOD WORKS CIRCLE BAREILLY
CANAL COLONY 117 CIVIL LINES BAREILLY.
Construction of Head Regulator Rasoolpur Dy.
2017_UPIDC_123366_1
03/SE/FWCB/2917-18
Open Tender
Civil Works
Item Rate
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
E E BIPCD BAREILLY
12 Mar 2021
12 Dec 2017
18 Dec 2017
12 Dec 2017
18 Dec 2017
12 Dec 2017
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead, back filling, watering and ramming of excavated earth into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth from the foundation trenches including cost of labour, all T & P, leads and lift etc. for proper completion of work as per direction of engineer in charge.
Providing and Laying cement concrete M-15 (1:2:4) using 4 to 20 mm. crushed stone aggreagate including cost of all materials, labour,T & P, all lifts and leads including Mechanical mixing & vibration for proper completion of work as per direction of engineer in charge.
Providing and Laying Cement Concrete M-20 (1:1.5:3) using 4 to 20 mm. Crushed aggreagate including cost of all materials, labour , T & P, all lifts and leads including Mechanical mixing & vibration for proper completion of work as per direction of engineer in charge.
Providing and Laying R.C.C. M-25 (1:1:2) using 4 to 20 mm. Crushed aggreagate including cost of all materials, labour , T & P, all lifts and leads including Mechanical mixing & vibration for proper completion of work as per direction of as per direction of engineer in charge.
Providing and Laying Cement Concrete M-25 (1:1:2) using 4 to 12 mm. Crushed aggreagate including cost of all materials, labour , T & P, all lifts and leads including Mechanical mixing & vibration for proper completion of work as per direction of engineer in charge.
Centering & Shuttering including rent of shuttering material, labour, T&P, all lifts and leads, etc. for proper completion of work but excluding cost of material as per direction of engineer in charge.
For C.C. Works
For R.C.C. Works
Cutting, bending, binding and placing of steel reinforcement including cost of steel, binding wire etc. for proper compection of work as per direction of engineer in charge.
Providing and laying of tar felt including cost of all materials, labour T&P for proper completion of workas per direction of engineer in charge.
Providing and Laying back filling with graded filter behind abutment, wing wall etc. including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work as per direction of engineer in charge.
Pea Gravel (5 to 25 mm.)
Coarse Sand
Pea Gravel (25 to 100 mm)
Brick on edge soling with Straight overburnt bricks laid dry filling joints with fine sand including preparation of sub grade to the prescribed camber and slope including cost of all material, labour T&P etc. required for proper completion of the work as per direction of engineer in charge.
Providing and Laying factory made 80 mm. thick interlocking cement concrete tiles (30 mpa) including 25 mm. thick compacted bed of fine sand compacting and proper embedding/laying of interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T & P etc. required for proper completion of work as directed by Engineer - in- Charge.
Providing and Laying of Porous concrete including cost of all materials, labour,tools & plant, all leads & lifts etc.complete as per direction of as per direction of engineer in charge.
Providing and laying stone boulders pitching in launching apron including cost of all material, labour, T&P, all lifts and leads etc. for proper comletion of work as per direction of engineer in charge.
Providing and Fixing C.C. Blocks size 900x900x450 mm. in M-15 (1:2:4) grade using 4 to 20 mm. Crushed aggreagate gaps filled with pebbles including cost of all materials, labour , T & P, all lifts and leads etc. for proper completion of work as per direction of engineer in charge.
Providing and Fixing C.C. Blocks size 600x600x300 mm. in M-15 (1:2:4) grade using 4 to 20 mm. Crushed aggreagate gaps filled with pebbles including cost of all materials, labour , T & P, all lifts and leads etc. for proper completion of work as per direction of engineer in charge.
Providing Ist Class Brick on edge pitching in 1:4 cement sand mortar over 12 mm. Thick mortar bed over 100 mm. thick 4 to 20 mm. stone ballast including cost of all material, labour, T&P, all lifts and leads etc. for proper completion of work as per direction of engineer in charge.
Providing struck deep pointing in 1:2 cement sand mortar including cost of all material ,labour ,T&P ,all lifts and leads etc. for proper completion of work as per direction of engineer in charge.
Providing and fixing of 25 mm. thick expansion joint with angle iron size 50x50x6 mm properly fixed with flat 25x5 mm. including cost of all material, labour T&P all lifts and leads etc. for proper completion of work.
Providing and fixing of 25 mm. thick Premould Joint Filler board (shalitex board) in expansion joint including cost of all material, labour T&P all lifts and leads etc. for proper completion of work
Providing & Fixing of 230 mm. Wide water stop Rubber seal for Construction Joint including cost of all material, labour, T&P ,all leads & lifts etc. for proper completion of work
Providing & Fixing 100 mm dia P.V.C. Pipe pressure 6 kg.cm2 for drainage spout & weep holes:
Providing and Installation of Hand Pump at site including cost of all materials, labour, T & P required for proper completion of work.
Earth work in filling in ordinary soil in 20 cm layers including excavation, loading, unloading, royalty, manual compaction , dressing the surface to the required levels and slopes , all lift and lead upto 1 km. distance, cost of earth, labour, all T & P required for proper completion of work as per direction of engineer in charge.
Meghendra pal singh contractor
M/S MI CANSTROCTION COMPANY
ASHOK KUMAR
SATYA SAI BUILDERS AND CONTRACTORS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .