Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Qualified | Qualified Qualified |
| 2 | Qualified | Qualified Qualified |
| 3 | Qualified | Qualified Qualified |
| 4 | Qualified | Qualified Qualified |
Tender Value
Refer Docs
EMD Value
₹13.0 L
Closing Date
22 May 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
T SURYAPRAKASH
Power Grid Corporation of India Ltd. Southern Region - 1 Headquarters Kavadiguda Main Road Secunderabad Telangana
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
SR-I/CnM/WC-3128/2023/RFx-5002002706(SR1/NT/W-CIVIL/DOM/B00/23/01695
Open
Civil - All
Works
KURNOOL 3 POOLING STATION
Mentioned in Qualifying Requirements
₹25,000
₹13.0 L
22 May 2023
20 Apr 2023
22 May 2023
20 Apr 2023
22 May 2023
20 Apr 2023
5 May 2023
: Attachments : General guidelines for filling up the Attachments
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695)
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3, 4, 5, 6, 7, 8, 9, 11 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as per proforma provided in the Bidding Document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
8 Attachment 20: Unequivocal consent of the proposed Associate(s) for the purpose of executing the 'Second Contract' and /or 'Third Contract' as an independent Contractor (applicable to foreign bidder) : No specific format is provided by POWERGRID. Bidder may use their own format.
9 Attachment 21: Capacity, Capability and Experience of Proposed Associate(s) (applicable for foreign bidder) : No specific format is provided by POWERGRID. Bidder may use their own format.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) Sole Bidder
Enter the details of the bidder below:
Specify type of Bidder Sole Bidder 1
2 or more 2 or more
Name of the Bidder 1
Address of Registered Office 2 or more
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-3 (QR)
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(Qualifying Requirement Data)
Bidders Name & Address To
Name: 0 Sr.GM(C&M)
Address: 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
In support of the Qualification Requirements (QR) for bidders, stipulated in Section-III of the Bidding Documents, we furnish herewith our QR data/details/documents etc. along with other information, as follows (The QR stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in Section-III shall prevail).
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status; 1
b) The principal place of business; 2 or more
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
1.0 GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
S No. Particulars For Individual Firm
1 Name of the Firm
2 Head Office/ Registered Office Address
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of the Agency
[Necessary documents to eatablish legal status of the bidder should be uploaded with the bid]
2.0 TECHNICAL REQUIREMENTS {Reference Section-III}
2.1 Bidder who wish to participate in the tender should have executed and successfully completed similar nature of works for any State/Central Govt. departments/ undertakings/reputed private organizations during last Five years as on the originally scheduled date of bid opening (i) One similar work of value not less than Rs.519.27 Lakhs or (ii) Two similar works, each of value not less than Rs.324.55 Lakhs or (iii) Three similar works, each of value not less than Rs.259.64 Lakhs
2.2 Format for the Bidder for indicating its technical experience (in support of meeting the requirement of para 2.1 above is to be furnished, as applicable, using this format]
Name of the Bidder
1 Name of Contract:
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility by whom the Contract was awarded
4 Scope of work executed under the above contract
5 Date of Completion of works under the Contract
6 Total Value of work executed (Rs.)
7 Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
Name of the Bidder
1 Name of Contract:
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility by whom the Contract was awarded
4 Scope of work executed under the above contract
5 Date of Completion of works under the Contract
6 Total Value of work executed (Rs.)
7 Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
Name of the Bidder
1 Name of Contract:
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility by whom the Contract was awarded
4 Scope of work executed under the above contract
5 Date of Completion of works under the Contract
6 Total Value of work executed (Rs.)
7 Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
3.0 FINANCIAL REQUIREMENTS {Reference Section-III}
a) Net Worth for last 3 financial years should be positive.
b) The Minimum Annual Average Turnover*(MAAT) of the bidder for the best three (3) financial years out of the preceding five (5) financial years shall be Rs.809.08 Lakhs. * Note- “Annual gross revenue from operation/gross operating income as incorporated in the profit &loss account excluding other income”.
c) The Liquid Assets (LA) : Bidder shall have liquid assets (L.A.) or/and evidence of access to or availability of credit facilities of not less than Rs.135.16 Lakhs
However, in accordance with GoI guidelines, Micro & Small Enterprises (MSEs) and Start-ups will be considered qualified against Financial Position, if their MAAT for the best three (3) financial years out of the preceding five (5) financial years meets 80% of the criteria stipulated at 3(b) & (c).
3.2 Format for the Bidder for indicating its Financial Criteria (in support of meeting the requirement of para 3.1 above is to be furnished, as applicable, using this format]
Financial Year Turnover
Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
(Use separate sheet for each experience/ Contract)
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-4
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(Alternative, Deviations and Exceptions to the Provisions)
Bidders Name & Address To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Reason for change The change in Bid Prices if the deviation is withdrawn and the Bidder conforms to the Specifications
Any proposed deviation will be applicable only for the bidder whose bid is substantially responsive in accordance with Clause 22, Section ITB, Vol. I of the bidding documents. If a bid is not substantially responsive, it will be rejected and may not subsequently be made responsive by the bidder by correction of the non-conformity.
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-4
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-5
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(Work Completion Schedule)
Bidders Name & Address To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject package i.e., Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B. for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of Contract
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Note: Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-6
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidders Name & Address To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Note: The information in similar format should be furnished for each partner of joint venture in case of joint venture bid.
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-6
(Information regarding Ex-employees of POWERGRID in our Organisation)
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-6
(Information regarding Ex-employees of POWERGRID in our Organisation)
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-7
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(Declaration regarding Social Accountability)
Bidders Name & Address To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) Attachment-8
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise)
Bidder’s Name and Address (Bidder) : To:
Contract & Material
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Southern Region -I Headquarters
0 Kavadiguda Main Road
0 Secunderabad - 500080 (Telangana)
I. We have read the provision in the Bidding Documents regarding furnishing the option for advance payment.
Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents,
we hereby confirm to opt the following:
Interest Bearing Initial Advance: Supply Portion
(Select from drop down list)
We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made 0
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3. Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
4. Permanent Account (PAN) No.
5. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
6 Name of the States/UT GSTIN number
a Andhra Pradesh
9. PF Registration No. of the Company
10. PF Regional Office covered (with Address)
11. Name of Contact Person
12. Telephone No(s)
13. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account: Current Account Saving Account Current Account
14. 9 digit MICR code printed at bottom in middle, next to cheque no.
15. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-9
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(Additional Information)
Bidder’s Name and Address (Bidder) : To
Name : 0 Contract & Material
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region -I Headquarters
0 Kavadiguda Main Road
Secunderabad - 500080 (Telangana)
In support of the additional information required as per ITB Sub-Clause 9.3 (i) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
Certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder : 0 1
Name of the Banker by whom certificate issued 2 or more
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
1.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder may result in rejection of Bid.
1.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years. A consistent history of awards invlolving litigation against the Bidder may result in rejection of Bid.
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Description of the plant for carrying out the work
Bidders should provide information of the plant(s) for carrying out the work including the proposal of manufacturing methods in sufficient detail to demonstrate the adequacy of the bidder’s proposals to meet the technical specification.
3.0 OTHER INFORMATION
3.1 Current Contract Commitments of works in progress
Bidders should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
3.2 Financial Data:
Figures Rs in Million
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-10
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
Bidders Name & Address To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Integrity Pact - separately attached herewith in Volume-III.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Between #REF! #REF!
Power Grid Corporation of India Limited #REF! #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
0 1 having its Registered Office at ,
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B. Package and Specification Number SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) POWERGRID values full compliance with all relevant laws and regulations, and the principles of economical use of resources, and of fairness and transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
(2) If Chairman and Managing Director obtains information on the conduct of any employee of POWERGRID which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, he will inform its Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to POWERGRID, or to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor will not commit any criminal offence under the relevant Anti-corruption Laws of India; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by POWERGRID as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a serious transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a serious transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures also exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The exclusion will be imposed for a minimum of 12 months and maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the exclusion prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID may forfeit the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III, POWERGRID may forfeit the Contract Performance Guarantee of this contract besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall declare in his Bid that no previous transgressions occurred in the last 3 years with any other Public Sector Undertaking or Government Department that could justify his exclusion from the tender process.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India, out of which one of the IEMs has been indicated in the NIT/IFB.
(2) The IEM is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. He has right of access to all project documentation. The IEM may examine any complaint received by him and submit a report to Chairman-cum-Managing Director, POWERGRID, at the earliest. He may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act. However, for ensuring the desired transparency and objectivity in dealing with the complaints arising out of any tendering process, the matter shall be referred to the full panel of IEMs, who would examine the records, conduct the investigations and submit report to Chairman-cum-Managing Director, POWERGRID, giving joint findings.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEM information as sought by him which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(6) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) ATTACHMENT-11
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
Bidder’s Name and Address (Bidder) : To
Name : 0 Contract & Material
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region -I Headquarters
0 Kavadiguda Main Road
Further, we hereby confirm that except as mentioned in the Schedule – 4 (Alternative, Deviations and Exceptions to the Provisions) hereof and/or the Covering Letter, forming part of our First Envelope :
(i) there are no discrepancies/inconsistencies and deviations/omissions/ reservations to the Bidding Documents, in the Second Envelope bid;
We also confirm that in case any discrepancies/ inconsistencies and deviations/ omissions/ reservations, as referred to in para (i) and (ii) above, is observed in the Second Envelope, the same shall be deemed as withdrawn/rectified without any financial implication, whatsoever to POWERGRID. However, in case of any arithmetical errors, the same shall be governed as per the provision of ITB Sub-Clause 27.2 read in conjunction with BDS
Date 0-Jan-1900 Printed Name 0
Place 0 Designation 0
SPEC. NO.: SR-I/C&M/WC-3128/2023/ RFx:5002002706 (SR1/NT/W-CIVIL/DOM/B00/23/01695) Bid Form-1st Envelope 2 nd 2 February
BID FORM 4 th 4 April
Bid Proposal Ref. No. 8 th #REF! 8 August
Date : 3 9 th #REF! 9 September
10 th 10 October
To: 11 th 11 November
12 th 12 December
Power Grid Corporation of India Ltd., 13 th
Southern Region -I Headquarters 14 th
Kavadiguda Main Road 15 th
Secunderabad - 500080 (Telangana) 16 th
In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. Plus applicable Octroi, Entry Tax, Other Taxes & Duties or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. 17 th
Name of Contract : Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B. or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. 18 th
Dear Ladies and/or Gentlemen, 19 th
1.0 Having examined the Bidding Documents, including Amendments the receipt of which is hereby acknowledged, we the undersigned, offer to execute the work under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 3.2 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid consisting of Techno – Commercial Part & Price Parts. 20 th
2.0 Attachments to the Bid Form
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments:
(a) Attachment 1 Bid Security, in a separate envelope, for a sum of Rs.12,98,000 (Rs. Twelve Lakh Ninety Eight Thousand only) initially valid for a period of Seven (7) months from the date set for opening of bids.
(b) Attachment 2 A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 6.
(c) Attachment 3 Bidder’s Eligibility and Qualifications
(d) Attachment 4 The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein 30 th
(e) Attachment 5 Work Completion Schedule. 31 st
(f) Attachment 6 Information regarding ex-employees of Employer in Bidder’s firm.
(g) Attachment 7 Declaration regarding Social Accountability
(h) Attachment 8 Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(i) Attachment 9 Additional Information
(j) Attachment 10 Integrity Pact
(k) Attachment 11 Declaration
3.0 We are aware that our bid is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in the bid documents
3.2 We declare that as specified in Bidding Documents, the RATES of all the Goods to be supplied under this contract shall remain FIRM during the currency of the contract and no price adjustment shall be applicable..
4.0 We confirm that except as otherwise specifically provided our Bid Prices include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
5.0 Construction of the Contract
5.1 We declare that we have studied the mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us Single Contract covering all goods and related services.
6.0 We have read the various clauses and provisions in bid documents and confirm that all the specified stipulations are acceptable to us.
Further we understand that deviation taken in any of the above clauses by us shall make our bid non-responsive as per provision of bidding documents and rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification/Letter of Award to us, and to achieve the completion of works and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of Six (06) months from the date initially stipulated for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
(a) Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
13.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
15 Further, we hereby confirm that except as mentioned in the Attachment -4 (Deviations) hereof:
(i) there are no discrepencies/inconsistencies and deviations/omissions/reservations to the Bidding Documents,;
16 We also confirm that in case any discrepencies/inconsitencies and deviations/omissions/reservations, as referred to in para (i) and (ii) above, is observed, the same shall be deemed as withdrawn/rectified without any finacial implication, whatsoever to POWERGRID. However, in case of any artithmetical errors, the same shall be governed as per the provisions of ITB
We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
85 Eighty Five 60 Sixty 52 Fifty Two 47 Forty Seven
8 Eight Hundred 9 Nine Hundred 3 Three Hundred 6 Six Hundred
55 Fifty Five Thousand 4 Four Thousand 10 Ten Thousand 91 Ninety One Thousand 0 0 0 0 0 plus
1 One Lac 0 0 6 Six Lac 0 0 0 0 1
1 One 1 One 1 One 1 One 0 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 0 1 1 1
4 Four 4 Four 4 Four 4 Four 0 1 0 0 0
5 Five 5 Five 5 Five 5 Five 0 1 0 0 1
6 Six 6 Six 6 Six 6 Six 0 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 0 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 0 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 0 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 0 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 0 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 0 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 0 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 0 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 0 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 0 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 0 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
Specification No: Ref: SR-I/C&M/WC-3128/2023/ 5002002706/ (SR1/NT/W-CIVIL/DOM/B00/23/01695)
Enter the details of the bidder below:
Specify type of Bidder Sole Bidder
Name of the Bidder TRUE
Address of Registered Office TRUE
Mobile no. +91 TRUE
Printed Name TRUE
Designation TRUE
Place TRUE False
#REF! ATTACHMENT-10
Name : #REF! #REF!
Address : #REF! #REF!
Integrity Pact is annexed herewith this Volume.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Between 0 #REF!
Power Grid Corporation of India Limited 0 #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
0 #REF! having its Registered Office at ,
hereinafter referred to as
"The Bidder/Contractor"
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
(2) If Chairman and Managing Director obtains information on the conduct of any employee of POWERGRID which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, he will inform its Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to POWERGRID, or to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor will not commit any criminal offence under the relevant Anti-corruption Laws of India; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by POWERGRID as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a serious transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a serious transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures also exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The exclusion will be imposed for a minimum of 12 months and maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the exclusion prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID may forfeit the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III, POWERGRID may forfeit the Contract Performance Guarantee of this contract besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall declare in his Bid that no previous transgressions occurred in the last 3 years with any other Public Sector Undertaking or Government Department that could justify his exclusion from the tender process.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India, out of which one of the IEMs has been indicated in the NIT/IFB.
(2) The IEM is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. He has right of access to all project documentation. The IEM may examine any complaint received by him and submit a report to Chairman-cum-Managing Director, POWERGRID, at the earliest. He may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act. However, for ensuring the desired transparency and objectivity in dealing with the complaints arising out of any tendering process, the matter shall be referred to the full panel of IEMs, who would examine the records, conduct the investigations and submit report to Chairman-cum-Managing Director, POWERGRID, giving joint findings.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEM information as sought by him which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(6) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
85 Eighty Five 60 Sixty 52 Fifty Two 47 Forty Seven
8 Eight Hundred 9 Nine Hundred 3 Three Hundred 6 Six Hundred
55 Fifty Five Thousand 4 Four Thousand 10 Ten Thousand 91 Ninety One Thousand 0 0 0 0 0 plus
1 One Lac 0 0 6 Six Lac 0 0 0 0 1
1 One 1 One 1 One 1 One 0 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 0 1 1 1
4 Four 4 Four 4 Four 4 Four 0 1 0 0 0
5 Five 5 Five 5 Five 5 Five 0 1 0 0 1
6 Six 6 Six 6 Six 6 Six 0 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 0 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 0 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 0 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 0 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 0 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 0 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 0 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 0 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 0 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 0 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 0 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
Schedule-I : DSR Scheduled Items
Bidder’s Name and Address (Sole Bidder) : 0 Contract Services
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
0 Kavadiguda Main Raod, Secunderabad - 500080
All prices are in INR
Sl. No. DSR 2021 Ref No: Service Number SAC (Service Accounting Codes) Whether SAC in column ‘4’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘6’ is confirmed. If not indicate applicable rate of GST # Description (DSR'21 Items- Civil Works) Unit Quantity Unit Erection Charges including GST as per DSR 2021 GST % included in DSR 2021 Unit Erection Charges excluding GST Amount excluding GST GST
SCHEDULE ITEMS - CIVIL (Boundary Wall)
1 2.9.1 18% Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock. Cum 2035 523.50 0.1200 467.41 951,179.35 171,212.28
2 2.9.2 18% Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m: Hard rock (requiring blasting) Cum 1357 846.25 0.1200 755.58 1,025,322.06 184,557.97
3 2.25(a) 18% Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete Cum 1388 368.65 0.1200 329.15 456,860.20 82,234.84
4 4.1.8 18% Providing & laying in position cement concrete of 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20mm nominal size) excluding the cost of centering, shuttering - All works up to plinth level Cum 258 6326.05 0.1200 5,648.26 1,457,251.08 262,305.19
5 4.2.3 18% Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) Cum 198 9375.20 0.1200 8,370.71 1,657,400.58 298,332.10
6 5.2.2 18% Reinforced cement concrete work in walls, (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five levels excluding the cost of centring, shuttering, finishing and reinforcement. (a) 1:1.5:3 (1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size) Cum 18 10185.05 0.1200 9,093.79 163,688.22 29,463.88
7 5.9.5 18% Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers Sqm 172 608.35 0.1200 543.17 93,425.24 16,816.54
8 #REF! 18% Centering and shuttering including strutting, propping etc. and removal of form for Cornices and mouldings Sqm 926 307.95 0.1200 274.96 254,612.96 45,830.33
9 5.22.6 18% Steel reinforcement for R.C.C. Work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically treated bars Kg 4411 89.65 0.1200 80.04 353,056.44 63,550.16
10 7.1.1 18% Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 5098 6653.45 0.1200 5,940.58 30,285,076.84 5,451,313.83
11 7.2.1 18% Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. - Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 1905 8275.70 0.1200 7,389.02 14,076,083.10 2,533,694.96
12 7.4.1 18% Extra for random rubble masonry with hard stone in : Square or rectangular pillars Cum 878 787.05 0.1200 702.72 616,988.16 111,057.87
13 7.7.1 18% Coursed rubble masonry (second sort) with hard stone in foundation & plinth with: Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 32 7380.35 0.1200 6,589.60 210,867.20 37,956.10
14 7.8.2 18% Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level. Masonry work (second sort), in cement mortar 1:6 (1 cement: 6 coarse sand) Cum 14 8974.50 0.1200 8,012.95 112,181.30 20,192.63
15 7.10.1 18% Extra for coursed rubble masonry with hard stone (first or second sort) in: Square or rectangular pillars Cum 811 873.05 0.1200 779.51 632,182.61 113,792.87
16 10.25.2 18% Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Kg 2256 142.30 0.1200 127.05 286,624.80 51,592.46
17 10.16.1 18% Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes Kg 998 154.90 0.1200 138.30 138,023.40 24,844.21
18 13.33.2 18% Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Raised and cut pointing Sqm 119 580.25 0.1200 518.08 61,651.52 11,097.27
19 13.35.1 18% Pointing on stone slab ceiling with cement mortar 1:2 (1 cement : 2 fine sand): Flush/ Ruled pointing Sqm 18216 177.85 0.1200 158.79 2,892,518.64 520,653.36
20 13.61.1 18% Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work Sqm 142 131.45 0.1200 117.37 16,666.54 2,999.98
11 16.53 18% Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) Rmt 4630 303.65 0.1200 271.12 1,255,285.60 225,951.41
TOTAL FOR SCHEDULE ITEMS - CIVIL(Boundary Wall) 56,996,945.84 10,259,450.24
SCHEDULE ITEMS - SECURITY POST
22 1.1.4 18% Carriage of excavated rock upto 1.00 KM by mechanical transport including loading, unloading and leveling up the disposed Excavated rock Cum 14 288.63 0.1200 257.71 3,607.94 649.43
23 2.7.1 18% Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. Ordinary rock Cum 50 412.95 0.1200 368.71 18,435.50 3,318.39
24 2.7.2 18% Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. Hard rock (requiring blasting) Cum 33 711.35 0.1200 635.13 20,959.29 3,772.67
25 2.25 18% Filling available excavated earth (excluding rock), moorum, red bajri, etc., in trenches, plinth, sides of foundation etc., in layers not exceeding 20cm in depth consolidating each deposited layer by ramming, watering, lead upto 50m and lift upto 1.5m. (Supply of moorum, red bajri etc., shall be paid separately). Cum 69 253.95 0.1200 226.74 15,645.06 2,816.11
26 2.26.1 18% Extra for every additional lift of 1.5m or part thereof for excavation: All kinds of soil. Cum 29 104.50 0.1200 93.30 2,705.70 487.03
27 4.1.3 18% Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). Cum 12 7365.15 0.1200 6,576.03 78,912.36 14,204.22
28 4.1.8 18% Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). Cum 9 6326.05 0.1200 5,648.26 50,834.34 9,150.18
29 4.17 18% Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 approved graded hard stone aggregate 20mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed, consolidated and grouted with fine sand including finishing the top smooth. sqm 19 681.65 0.1200 608.62 11,563.78 2,081.48
30 5.1.2 18% Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement: All work upto plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). Cum 7 8364.20 0.1200 7,468.04 52,276.28 9,409.73
31 5.2.2 18% Providing and laying in position reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, piers, abutments, posts and struts etc., upto floor five level excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). Note: Beams, suspended floors, roofs having slopes up to 150 will also be measured under this item. Cum 8 10185.05 0.1200 9,093.79 72,750.32 13,095.06
32 5.9 18% Centring and shuttering including strutting, propping etc., and removal of form for:
a 5.9.1 18% Foundations, footings, bases of columns etc., for mass concrete. sqm 16 307.95 0.1200 274.96 4,399.36 791.88
b 5.9.3 18% Suspended floors, roofs, landing, balconies and access platform. sqm 30 766.55 0.1200 684.42 20,532.60 3,695.87
c 5.9.5 18% Lintels, beams, plinth beams, girders, bressumers and cantilevers. sqm 61 608.35 0.1200 543.17 33,133.37 5,964.01
d 5.9.6 18% Columns, pillars, piers, abutments, posts and struts. sqm 47 804.25 0.1200 718.08 33,749.76 6,074.96
33 5.22.6 18% Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete: TMT bars. Kg. 1194 89.65 0.1200 80.04 95,567.76 17,202.20
34 5.12 18% Providing, hoisting and fixing upto floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like including the cost of required centring, shuttering, finishing smooth with 6mm thick cement plaster 1:3 (1 cement :3 fine sand) on exposed surfaces complete but excluding cost of reinforcement with 1:2:4(1cement :2coarse sand :4graded stone aggregate 20mm nominal size). Cum 1 9673.50 0.1200 8,637.05 8,637.05 1,554.67
35 6.1.2 18% Brick work with F.P.S bricks of class designation 75 in foundation and plinth level in cement mortar 1:6 (1 cement : 6 coarse sand). Cum 8 6658.25 0.1200 5,944.87 47,558.96 8,560.61
36 6.4.2 18% Brick work with bricks of class designation 75 in superstructure above plinth level upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand). Cum 14 8288.35 0.1200 7,400.31 103,604.34 18,648.78
37 8.31 18% Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approvedmake, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. sqm 10 1063.45 0.1200 949.51 9,495.10 1,709.12
38 8.32 Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. (c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items. The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places. Sqm 100 4474.20 0.1200 3,994.82 399,482.00 71,906.76
39 9.7.7.2 Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick : float glass panes, 5 mm thick glass pane (weight not less than 12.5 kg per sqm) sqm 9 2231.20 0.1200 1,992.14 17,929.26 3,227.27
40 9.12 Extra for providing frosted glass panes 4 mm thick instead of ordinary float glass panes 4 mm thick in doors, windows and clerestory window shutters. (Area of opening for glass panes excluding portion inside rebate shall be measured). sqm 1 148.50 0.1200 132.59 132.59 23.87
41 9.74.2 Providing and fixing CP brass tower bolts (barrel type) with necessary screws etc, complete: 200x10mm Each 4 300.55 0.1200 268.35 1,073.40 193.21
42 9.82 Providing and fixing CP brass hanging type floor door stopper with necessary screws etc., complete. Each 2 109.60 0.1200 97.86 195.72 35.23
43 9.88 Providing and fixing chrome plated brass 100mm mortice latch and lock with 6 levers and a pair of lever handles with necessary screws etc., complete (best make of approved quality) Each 2 817.50 0.1200 729.91 1,459.82 262.77
44 9.92.1 Providing and fixing chrome plated brass handles with necessary screws etc. Complete: 125 mm. Each 4 226.50 0.1200 202.23 808.92 145.61
48 9.147B.1 Providing and fixing factory made uPVC white colour fixed glazed windows/ventilators comprising of uPVC multi-chambered frame and mullion (wherever required) extruded profiles duly reinforced with 1.60 + 0.2mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, G.I fasteners 100 x 8mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately). NOTE : For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. Fixed window / ventilator made of (small series) frame 47 x 50 mm & mullion 47 x 68 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area up to 0.75 sqm.) sqm 1 7249.10 0.1200 6,472.41 6,472.41 1,165.03
46 9.147D.2 Providing and fixing factory made uPVC white colour sliding glazed window up to 1.50m in height dimension comprising of uPVC multi-chambered frame within-built roller track and sash extruded profiles duly reinforced with 1.60 + 0.2mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes, wire mesh and silicon sealent shall be paid separately). Note: For uPVC frame and sash extruded profiles minus 5% toelerance in dimension i.e. in depth & width of profile shall be acceptable. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of (small series) frame 92 x 44mm & sash 32 x 60mm both having wall thickness of 1.9 + 0.2mm and single glazing bead of appropriate dimension (Area of window upto 1.75sqm). sqm 8 10030.30 0.1200 8,955.63 71,645.04 12,896.11
47 10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Kg 1466 111.95 0.1200 99.96 146,541.36 26,377.44
48 10.16.1 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. Kg 788 154.90 0.1200 138.30 108,980.40 19,616.47
49 10.17 Providing and fixing MS fan clamp type I of 16mm dia MS bar bent to shape with hooked ends in RCC slabs during laying including painting the exposed portion of loop all as per standard design complete. Each 3 185.95 0.1200 166.03 498.09 89.66
50 11.39 Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement: 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. sqm 2 1142.80 0.1200 1,020.36 2,040.72 367.33
51 11.41.2 Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm sqm 8 1416.65 0.1200 1,264.87 10,118.96 1,821.41
52 11.46.2 Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm sqm 2 1466.50 0.1200 1,309.38 2,618.76 471.38
53 12.21.1 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : In 75x75 mm deep chase. Metre 11 260.20 0.1200 232.32 2,555.52 459.99
54 12.41.2 Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.(i)Single socketed pipes. : 110 mm diameter Metre 6 319.75 0.1200 285.49 1,712.94 308.33
55 12.42 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS :5382 leaving 10 mm gap for thermal expansion.
56 12.43.2 Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hardwood plugs, screwed with M.S. screws of required length including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete. : 110 mm Each 6 309.50 0.1200 276.34 1,658.04 298.45
57 13.1.2 12mm cement plaster of mix 1:6 (1 cement : 6 fine sand) sqm 51 282.00 0.1200 251.79 12,841.29 2,311.43
58 13.11 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement : 6 fine sand). sqm sqm 231 442.75 0.1200 395.31 91,316.61 16,436.99
59 13.16.1 6mm cement plaster to ceiling of mix 1:3 (1 cement : 3 fine sand). sqm 30 253.05 0.1200 225.94 6,778.20 1,220.08
60 13.42.1 Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification. Two or more coats on new work sqm 92.75 sqm 81 92.75 0.1200 82.81 6,707.61 1,207.37
61 13.43.1 Applying one coat of cement primer of approved brand and manufacture on wall surface sqm 81 64.45 0.1200 57.54 4,660.74 838.93
62 13.45.1 Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm sqm 231 245.00 0.1200 218.75 50,531.25 9,095.63
63 13.76 Forming groove of uniform size from 12x12mm and upto 25x15mm in plastered surface as per approved pattern using wooden battens,nailed to the under layer including removal of wooden battens, repairs to the edges of plaster panel and finishing the groove complete as per specifications and direction of the Engineer-in-Charge. Metre 100 88.70 0.1200 79.20 7,920.00 1,425.60
64 17.2.1 17.2 Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid each 5540.55 Each 1 5540.55 0.1200 4,946.92 4,946.92 890.45
65 17.7.4 Providing and fixing white vitreous china flat back wash basin size 550x400mm with CI brackets,with a single15mm CP brass pillar tap, 32mm dia CP brass waste of standard pattern, including apinting of fitting and brackets, cutting and making good the walls wherever required. Each 1 1679.60 0.1200 1,499.64 1,499.64 269.94
66 17.32.2 Providing and fixing mirror of superior glass (of approved quality) of rectangular shape 453x357mm with plastic moulded frame of approved make and shade with 6mm thick hard board backing. Each 1 1158.95 0.1200 1,034.78 1,034.78 186.26
67 17.28.2.1 Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.Flexible pipe:32 MM DIA. Each 1 104.35 0.1200 93.17 93.17 16.77
68 17.33 Providing and fixing 600x120x5 mm glass shelf with edges round off, supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc., complete. Each 1 942.15 0.1200 841.21 841.21 151.42
69 18.7 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall
a 18.7.3 25 mm nominal outer dia Pipes. Metre 12 408.55 0.1200 364.78 4,377.36 787.92
b 18.7.4 32 mm nominal outer dia Pipes Metre 24 500.95 0.1200 447.28 10,734.72 1,932.25
70 18.8 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.
a 18.8.2 20 mm nominal outer dia Pipes Metre 12 513.75 0.1200 458.71 5,504.52 990.81
b 18.8.3 25 mm nominal outer dia Pipes Metre 12 626.05 0.1200 558.97 6,707.64 1,207.38
71 18.17 Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end)
72 18.18.3 Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25 mm nominal bore Each 1 399.15 0.1200 356.38 356.38 64.15
73 18.21.2.1 Providing and fixing uplasticised PVC connection pipe with brass unions :15 mm nominal bore with 45 cm length. Each 1 85.20 0.1200 76.07 76.07 13.69
74 18.48 Providing and placing on terrace (at all floor levels) polyethylene water storage tank, ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. Litre 500 9.70 0.1200 8.66 4,330.00 779.40
75 18.49.1 Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931 : 15mm nominal bore Each 2 434.20 0.1200 387.68 775.36 139.56
76 18.53.1 Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931, 15 mm nominal bore Each 2 500.35 0.1200 446.74 893.48 160.83
77 19.4.1.1 Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design, 100x100 mm size P type : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 1 2453.55 0.1200 2,190.67 2,190.67 394.32
78 19.32.1 Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 1 28029.15 0.1200 25,026.03 25,026.03 4,504.69
79 22.14.1 Grading roof for water proofing treatment with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominla size) including mixing of water proofing compound in concrete @ 1 kg per 50kg of cement/ as per the manufacturer's direction. Cum 2 7510.75 0.1200 6,706.03 13,412.06 2,414.17
80 25.1' Providing and supplying aluminium extruded tubular and other aluminium sections as per the architectural drawings and approved shop drawings , the aluminium quality as per grade 6063 T5 or T6 as per BS 1474,including super durable powder coating of 60-80 microns conforming to AAMA 2604 of required colour and shade as approved by the Engineer-in-Charge. ( The item includes cost of material such as cleats, sleeves, screws etc. necessary for fabrication of extruded aluminium frame work. Nothing extra shall be paid on this account). The weight of aluminium extruded section shall be taken for purpose of payment. kg 200 370.45 0.1200 330.76 66,152.00 11,907.36
TOTAL FOR SCHEDULE ITEMS - SECURITY POST 1,802,467.43 324,444.16
SCHEDULE ITEMS - SECURITY POST (ELECTRICAL)
81 5.6, DSR 2022 Earthing with copper earth plate 600mm X 600mmX 3mm thick including accessories and providing masonary enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/coke and salt as required Set 1 13838.00 0.1200 12,355.36 12,355.36 2,223.96
TOTAL FOR SCHEDULE ITEMS - SECURITY POST (ELECTRICAL) 12,355.36 2,223.96
Total of Schedule (CIVIL and E& M) Items as per DSR 2021 excluding Rebate 58,811,768.63 10,586,118.36
Percentage (%) above/below +/- on DSR 2021 Rates excluding GST mentioned above (to be quoted by Bidder) 0.00%
Add Amount above/below +/- on the amount for DSR Items as per quoted percentage
Total of Schedule I excluding GST considering offered % Rebate
As the %variation w.r.t total DSR Amount cell left Blank the bid is considered as Non-responsive
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
Schedule-II : Non-Scheduled Items
Bidder’s Name 0 To:
Address : 0 Contract Services
0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
Kavadiguda Main Raod, Secunderabad - 500080
Sl. No. Service Number SAC Code Whether SAC in column ‘2’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘6’ is confirmed. If not indicate applicable rate of GST # Description (Non Schedule Items) Unit Quantity Unit Rate without GST Total Amount GST Remarks #REF!
A NON-SCHEDULE ITEMS: CIVIL
1 18% Structural steel work welded in built up sections and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. ISA 50X50X6mm size for Support concertinacoil fencing over boundary wall including cutting, welding, making holes/groves of size 10-20mm and splitting at bottom edge as per approved drawing and as per direction of Engineer in charge. Kg 13604.00 118.00 1,605,272 288948.96 #REF! FALSE FALSE
2 18% Providing and fixing of Thermocol sheet of 20mm thickness in expansion joint of RR masonry wall including transportation,cutting, fixing as directed by Engineer-In-Charge Sqm 507.00 60.00 30,420 5475.60
TOTAL FOR NON-SCHEDULE ITEMS: CIVIL 1,635,692 294,425
B NON-SCHEDULE ITEMS: SECURITY POST
1 NS MR 18% Providing and fixing reputed make WPC solid Door Frames sections of minimum size 100x62mm with one side rebate suitable for fixing Single shutters 28--35mm thick of WPC/Flush or wooden panelled. All complete as directed by the engineer Metre 10 914.86 9,148.60 1646.75
2 NS MR 18% Providing and fixing Minimum 28mm thick WPC shutters of approved brand and design/ pattern with min 3 Nos of 100x58x1.9mm stainless steel hinges. All complete as directed by the Engineer-in-charge. Note: Rates quoted by the agency sqm 4 3950.70 15,802.80 2844.50
3 Providing and fixing uPVC soil waste and vent pipess of reputed make like Sipreme or other equivalent approved brands for toilets including specials such as plain/access bend of any degree, 3way/4 way junctions of any degree, Couplers, vent cowl including suitable rubber kits and chemical solution/adhessives as per recommendations of manufacturers
NS MR 18% Providing and fixing uPVC soil trap of self cleaning type 110mm inlet and 75mm outlet of reputed brand like Sipreme or other equavalent approved brands for toilets including suitable rubber gas kits and chemical solution as per recommendations of manufacturres Each 2 250.00 500.00 90.00
NS MR 18% Providing and fixing Stainless Steel (SS) floor trap with jalli of self cleaning type Viking model No. 48501 or equivalent of approved brands including required screws, rawl plugs etc. complete. Each 2 379.21 758.42 136.52
NS MR 18% Providing and fixing CP Brass 2 in one taps for WC with health faucet, flexible hose pipe complete. Jaguar 5041 for tap & 563 for health facet or equivalent model of approved brands. Each 1 3483.04 3,483.04 626.95
NS MR 18% Providing and fixing circular/ Hexagonal cast iron or M.S. sheet box for ceiling fan clamp, M.S. sheet with its top surface hacked for proper bonding, top lid shall be screwed into the cast iron/ M.S. sheet box by means of round headed screws, one lock at the corners. Clamp shall be made of M.S. bar bent to shape as per standard drawing Each 1 203.72 203.72 36.67
NS MR 18% Supply and Installation of SS 304 grade "POWERGRID" पावरग्रिड with Logo of Size 5.905'x1.882' (as per POWERGRID LOGO Standards) and Embose of the letter shall be 40 mm as shown in drawing at Out side Entrance wall. Enamel Colouring as per the drawing shall be included and all complete as per the direction of Engineer In charge Each 2 24000.00 48,000.00 8640.00
NS MR Supply and Installation of SS 304 grade Alphabets, Numbers & Symbols or Substation Name as shown in drawing at Out side Entrance wall of Size 1feet and depth of the letter shall be 40 mm. Enamel Colouring as per the drawing shall be included and all complete as per the direction of Engineer In charge
a 18% English Alphabets Each 34 550.00 18,700.00 3366.00
b 18% Hindi Letters Each 20 550.00 11,000.00 1980.00
c 18% Telugu Letters Each 20 550.00 11,000.00 1980.00
NS MR 18% Supply and Installation of SS 304 grade Alphabets, Numbers & Symbols or Substation Name as shown in drawing at Out side Entrance wall of Size 6inch and depth of the letter shall be 40 mm. Enamel Colouring as per the drawing shall be included and all complete as per the direction of Engineer In charge
a 18% English Alphabets Each 34 330.00 11,220.00 2019.60
b 18% Hindi Letters Each 25 330.00 8,250.00 1485.00
c 18% Telugu Letters Each 23 330.00 7,590.00 1366.20
TOTAL FOR NON-SCHEDULE ITEMS: SECURITY POST 149,856.58 26,974
B NON-SCHEDULE ITEMS: SECURITY POST (ELECTRICAL)
18% Distribution Board: Supply, Installation and commissioning pre-wired, factory fabricated, distribution board of steel sheet for 415v AC system, with double door arrangement, IP-52 protected duly poweder coated paint, with thinned copper bus bars of suitable size,RCCB/MCBs of Type-C,10kA short circuit rating, with following configuration(concealed type) 1. 63A four pole( 3phase and neutral) RCCB, 30mA-1No 2. Bus Bars for 3-phases, Neutral and Earthing. 3. 32A-SPMCBs- 3 4. 16A, SPMCBs-10 5. 6A, SPMCBs - 5 6. Red Yellow Blue indicating lamps for each phase (connected at the output of RCCB) Set 1 25000.00 25,000.00 4500.00
18% Supply & installation of Copper wire (10SWG) for earthing Kgs 5 1008.00 5,040.00 907.20
Supply and fixing of following size GI metal box ( concealed) along with modular base, cover plates suitable for modular switches of follwing sizes
18% Supply and fixing of modular Blanking plate on exisiting modular plates Nos 10 360.00 3,600.00 648.00
18% Supply & Laying of PVC conduit in RCC slab/ Brick works ( rigid Medium guage)- 32mm including all accessories required for successful erection like L-bends, T-joints, Junction Boxes, Screws etc. Metre 50 171.00 8,550.00 1539.00
Supply and drawing and termination at both ends of PVC Insulated FRLS multi strand copper wire, in concealed conduit
18% Supply and installation of 18w, LED light fitting wall mounted ( with T5 tube) cool white colour light Nos 5 1206.00 6,030.00 1085.40
18% Supply and installation of 5w, LED light fitting cool white colour light Nos 2 144.72 289.45 52.10
18% Supply and installation of 150w, LED Flood light luminaire fitting with flexible conduit at truss cool white colour light Nos 6 18000.00 108,000.00 19440.00
Supply, Fixing and termination of Modular type switches and accessories on the exisiting modular plate
18% Modular switch 5A Nos 20 81.00 1,620.00 291.60
18% Modular Switch 15A Nos 2 360.00 720.00 129.60
18% Power sockets- 5A, 5pin ( Universal type-provision for insertion of both round and flat pins tops) Nos 4 153.00 612.00 110.16
18% Power sockets- 15A, 5pin Nos 2 450.00 900.00 162.00
18% 5 stepped Electronic fan regulator - Modular type ( 2module) Nos 1 450.00 450.00 81.00
18% Supply and laying of 3.5C x 35 Sq.mm, Aluminium condutor, XLPE, wire armoured cabledirect in ground as per IS1255 including excavation, sand cushioning, Bricks, protective covering, backfilling cable mettalic route markers at every 50m length and at every turning, at every road crossing and termination at both ends including all accessories like glands, lugs etc. Metre 60 360.00 21,600.00 3888.00
18% Supply and installation of 1200 mm sweep Ceiling Fans of Crompton, Havells, Atomberg or equivalent brands Nos 1 2883.77 2,883.77 519.08
18% Supply and installation of 250mm 1250 Rpm exhaust Fan (Complete Accessories) of approved make- Crompton Grieves/Bajaj/Heavels or equivalent. Nos. 1 2197.67 2,197.67 395.58
TOTAL FOR NON-SCHEDULE ITEMS: SECURITY POST (Electrical) 195,151.89 35,127.34
Total of Non-Schedule Items- Civil and E&M (Schedule - II) 1,980,700.47 356,526.09 Sheet OK
Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Name : 0 Contract Services
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
0 Kavadiguda Main Raod,
Secunderabad - 500080
Sl. No. Description Total Price (INR)
1.1 TOTAL SCHEDULE NO. I
Supply & Installation Charges- Schedule Civil Items for Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
1.2 TOTAL SCHEDULE NO. II
Supply & Installation Charges- Non-Schedule Civil Items for Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B. 1,980,700.47
I Total of Service/Installation Charge (ITEMS TAB: Item 01 INSTALLATION FOR DCB (INR) : SRM ATB for BID PRICE SUMMARY Statement ) Non-responsive Bid
GST on Schedule-I
GST on Schedule-II 356,526.09
Total GST for BID PRICE SUMMARY Statement ) Non-responsive Bid
III GRAND TOTAL Non-responsive Bid
Date : 0 Printed Name : 0.00
Place : 0 Designation : 0.00
Specification No: Ref: SR-I/C&M/WC-3128/2023/ 5002002706/ (SR1/NT/W-CIVIL/DOM/B00/23/01695) Bid Form 2nd Envelope
BID FORM (Second Envelope)
Bid Proposal Ref. No.
Contract Services
Power Grid Corporation of India Ltd.,
Southern Region Transmission System-I
Name of Contract : Construction of Boundary Wall and Security Post for Kurnool-III Pooling Station at Nandipadu Village, Nandyal Dt under Transmission System for evacuation of power from RE sources in Kurnool Wind Energy Zone (3000MW)/ Solar Energy Zone (1500MW) Part-A and Part-B.
Dear Ladies and/or Gentlemen,
1.0 In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to undertake the above-named package in full conformity with the said Bidding Documents for the sum of Rs. Non-responsive Bid /- only or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to undertake the above-named package in full conformity with the said Bidding Documents for the sum of Rs. /- only or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. Non-responsive Bid
Sch-1 Schedules Items as per DSR 2021 excluding GST
Sch-2 Non-Scheduled Items
Sch-3 Grand Summary
2.3 We declare that as specified in Clause 4.6, ITB, Vol.-IA of the Bidding Documents, the prices of all the Services to be supplied under this contract shall be FIRM and doesnot subject to any price adjustment as per relevant clauses in bidding document.
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST , which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
1-1_Section-I_IFB.docx
docx • 0.12 MB
1-2_Section-II-E-RA Guidelines.docx
docx • 0.11 MB
1-2_Section-II-ITB.doc
doc • 0.64 MB
1-3_Section-III-QR.doc
doc • 0.50 MB
1-4 A-Model Rules & Safety Code.doc
doc • 0.07 MB
1-4 B-Registers.pdf
pdf • 0.12 MB
1-4_Section-IV GCC.doc
doc • 0.70 MB
1-5_Section-V-SCC-1.doc
doc • 0.58 MB
1-6_Section-VI-Forms and Procedures.doc
doc • 0.09 MB
Drawing.pdf
pdf • 2.33 MB
SFQP for Civil Works for Site Packages - Revision 04.pdf
pdf • 2.22 MB
Technical Specification.pdf
pdf • 5.54 MB
Attachment 10- Integrity Pact.pdf
pdf • 0.20 MB
Volume-3 Bid Form n Atts..xlsx
xlsx • 0.57 MB
Price_Schedule.xlsx
xlsx • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .