Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 33 1239 MANIMALA ROAD EDAPPALLY ERNAKULAM KERALA 682024 | ERNAKULAM | KERALA | 682024 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance VII 331 TEMPLE ROAD THOTTAKKATTUKARA P O ALUVA ERNAKULAM KERALA ERNAKULAM KERALA 683108 | ERNAKULAM | KERALA | 683108 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
23 Mar 2026, 10:00 amClosed
NITHIN C S
SM (P and P)-CD
NDT Survey of Phosphoric acid and Sulphuric acid storage tanks at Cochin division and Willington Island Q10-Berth
2026_FACT_901604_1
4034/2025-2026/E32986
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
24 Mar 2026
7 Mar 2026
24 Mar 2026
7 Mar 2026
23 Mar 2026
7 Mar 2026
NDT Survey of Phosphoric acid and Sulphuric acid storage tanks at Cochin division and Willington Island Q10-Berth
Thickness measurement of 4 Nos P2O5 DAY storage tanks (Tank dia 10 mtr & Height 9.00 m) in NPK Plant: Work Involves:((a)Arranging necessary pipes, clamps wooden planks etc conforming to relevant IS standards/ providing Scaffolding/suitable ladder or other suitable amenities for measuring thickness. (b)Measuring, recording and submitting records of the thickness of shell and roof of the tank at approximately 360 points per tank. Dismantling of scaffolding/other amenities and clearing of the site after thickness Measurement.
Thickness measurement of 2 Nos P2O5 Terminal storage tanks (Tank dia 20 m (Appx) & Height 9.00 m) in NPK Plant: Work Involves: ((a)Arranging necessary pipes, clamps wooden planks etc conforming to relevant IS standards/ providing Scaffolding/suitable ladder or other suitable amenities for measuring thickness. (b)Measuring, recording and submitting records of the thickness of shell and roof of the tank at approximately 900 points per tank. Dismantling of scaffolding/other amenities and clearing of the site after thickness Measurement
Thickness measurement of 6 Nos P2O5 (3 Nos Strong & 3 Nos weak) storage tanks (Tank dia 11 mtr & Height 9.95 m) in PAP Plant: Work Involves:((a)Arranging necessary pipes, clamps wooden planks etc conforming to relevant IS standards/ providing Scaffolding/suitable ladder or other suitable amenities for measuring thickness. (b)Measuring, recording and submitting records of the thickness of shell and roof of the tank at approximately 450 points per tank. Dismantling of scaffolding/other amenities and clearing of the site after thickness Measurement
Thickness measurement of 4 Nos H2SO4 storage tanks (Tank dia 20 m & Height 9.60 m) in SAP Plant: Work Involves:((a)Arranging necessary pipes, clamps wooden planks etc conforming to relevant IS standards/ providing Scaffolding/suitable ladder or other suitable amenities for measuring thickness. (b)Measuring, recording and submitting records of the thickness of shell and roof of the tank at approximately 900 points per tank. Dismantling of scaffolding/other amenities and clearing of the site after thickness Measurement
Thickness measurement of 2 Nos H2SO4 storage tanks (Tank dia 22 m & Height 12.5 m) in WI at Q10-Berth: Work Involves:((a)Arranging necessary pipes, clamps wooden planks etc conforming to relevant IS standards/ providing Scaffolding/suitable ladder or other suitable amenities for measuring thickness. (b)Measuring, recording and submitting records of the thickness of shell and roof of the tank at approximately 1200 points per tank. Dismantling of scaffolding/other amenities and clearing of the site after thickness Measurement.
Thickness measurement of 3 Nos P2O5 storage tanks (Tank dia 24 mtr & Height 9.5 m) in WI at Q10-Berth: Work Involves:((a)Arranging necessary pipes, clamps wooden planks etc conforming to relevant IS standards/ providing Scaffolding/suitable ladder or other suitable amenities for measuring thickness. (b)Measuring, recording and submitting records of the thickness of shell and roof of the tank at approximately 1200 points per tank. Dismantling of scaffolding/other amenities and clearing of the site after thickness Measurement
Thickness measurement of 1 No H2SO4 storage tanks (Tank dia 11 m & Height 9.95 m) in PAP Plant: Work Involves:((a)Arranging necessary pipes, clamps wooden planks etc conforming to relevant IS standards/ providing Scaffolding/suitable ladder or other suitable amenities for measuring thickness. (b)Measuring, recording and submitting records of the thickness of shell and roof of the tank at approximately 450 points per tank. Dismantling of scaffolding/other amenities and clearing of the site after thickness Measurement.
stage.html
html • 0.02 MB
finance_947673.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocuments.pdf
Tender Documents • 1.34 MB
BOQ_947673.xls
BOQ • 0.24 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .