Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
21 Jul 2026, 3:30 pm
Electrical OHE Portion of work for (1)Creation/Augmentation/Upgradation of Electric Loco shed/Bilaspur Phase B. (2) Creation/Augmentation/Upgradation of Facilities for maintenance of Electric Loco at ELS/BSP-Phase-C.
22-CEE-C-SECR-2026
22-CEE-C-SECR-2026
Open
11 Months
Bilaspur, Chhattisgarh
₹0
₹3.0 L
29 Jun 2026
29 Jun 2026
7 Jul 2026
Concerete for foundation & Pinth In Hard Soil .
Concerete for foundation & Pinth In Rocky soil
Concerete for foundation & Pinth In other than Hard & Rocky soil. Above/
Galvanised Traction Mast Supply (Rolled)
Galvanised Traction Mast Supply (Fabricated)
Erection of Galvanised Traction Mast (Rollled /Fabricated) under Non PB
Erection of Galvanised Traction Mast (Rollled /Fabricated) under PB
Supply of Fabricated Small Parts of Steel including DA
Erection of Fabricated Small Parts of Steel including DA under NPB
Erection of Fabricated Small Parts of Steel including DA under PB
Supply of Fasteners
Supply of Single bracket assembly for conventional OHE ( Without Insulator)
Fabrication & Erection Single bracket assembly for conventional OHE ( Without Insulator) NPB
Fabrication & Erection Single bracket assembly for conventional OHE ( Without Insulator) under PB
Supply of Overhead Equipment- Supply of assorted component for conventional OHE.
Erection of over head equipment (Conventional) under NPB
Erection of over head equipment (Conventional) under PB
Supply of Guy Rod assy. Including Mast Anchor/Guy Rod fittings.
Erection of Guy Rod assy. Including Mast Anchor/Guy Rod fittings NPB
Erection of Guy Rod assy. Including Mast Anchor/Guy Rod fittings. under PB
Supply of BC anchor Loop
Supply of Regulating Equipment 3 pulley type with Counter Weight assy. Guide tube for conventional type OHE.
Erection of Regulating Equipment 3 pulley type with Counter Weight assy. Guide tube for conventional type OHE NPB
Erection of Regulating Equipment 3 pulley type with Counter Weight assy. Guide tube for conventional type OHE under PB
Supply (S/I assembly) Section Insulator assy. (for conventional OHE) W/O core insulator
Erection of section insulator assy under NPB
Erection of section insulator assy. under PB
Supply of Termination of Double conductor of OHE (Component)
Erection of Termination of Double conductor of OHE (Component)
Erection of Termination of Double conductor of OHE (Component) under PB
supply of (Components) of Termination of 25 KV Alu. Feeder
Erection of Termination of 25 KV Alu. Feeder NPB
Erection of Termination of 25 KV Alu. Feeder under PB
Supply of Component of Solid core cut-in insulator.
Erection of Component of Solid core cut-in insulator in NPB
Erection of Component of Solid core cut-in insulator. under PB
Supply & erection of Structure Bond.
Supply & Erection of Longitudinal Bond.
Supply and Erection of Transverse/Special Bond.
Supply of Number Plate Retro -Reflective type (Mast/Structure)
Erection of Number Plate Retro -Reflective type (Mast/Structure) Above/
Supply of stay arm porcelain (Normal Zone)
Supply of bracket porcelain (Normal Zone)
Supply of 9-Ton porcelain Insulator
Supply of 25 Kv Post
Supply of Core insulator for Section insulator Above/
Supply of Large Span wire (130sqmm)
Erection of Large Span wire (130sqmm) NPB
Erection of Large Span wire (130sqmm) under PB
Supply of over head equipment.- Dropper wire (5mm)
Supply of over head equipment-annealed copper Large jumper wire 160 sqmm
Supply of over head equipment-Annealed copper Small jumper wire (50 sqmm 19/1.8 mm)
Supply of Components of Copper jumper (C Jumper & Anti Theft)
Erection of Components of Copper jumper (C Jumper & Anti Theft)
Erection of Components of Copper jumper (C Jumper & Anti Theft) under PB
Supply of Componant of 160 sq mm large jumper wire (Cu)
Erection of Componant of 160 sq mm large jumper wire (Cu)
Erection of Large copper jumper wire 160 sqmm between cross feeder OHE under PB
Single Pole isolator with Earth contact assembly 1600 Amps- SP Isolator assembly. (supply)
Single Pole isolator with Earth contact assembly 1600 Amps -Earth contact assembly (Supply)
Erection of Single Pole isolator with Earth contact assembly 1600 Amps
Erection of Single Pole isolator with Earth contact assembly 1600 Amps under PB
DP isolator assembly (supply)
Earth contact assembly (Supply)
Erection of Double Pole isolator with Earth contact assembly 1600 Amps
Erection of Double Pole isolator with Earth contact assembly 1600 Amps under PB
Modification of Erected Equipments.- Transfer of Equipment from one Mast/Support to another NPB
Modification of Erected Equipments.- Transfer of Equipment from one Mast/Support to another. under PB
Supply of Splicing & Extension of OHE including PVC sleeves under ROB.
Erection of Splicing & Extension of OHE including PVC sleeves under ROB. under PB
Dismantling of:- OHE
Dismantling of:- OHE under PB
Dismantling of:- Mast/Structure upright NPB
Dismantling of:- Mast/Structure upright under PB
Dismantling of:- cantilever NPB
Dismantling of:- cantilever under PB
Dismantling of:- Section insulator NPB
Dismantling of:- Section insulator under PB
Dismantling of:- SP/DP isolator under PB
Dismantling of:- Guy rod NPB
Dismantling of:- Guy rod under PB
Dismantling of:- Anticreep
Dismantling of:- Anticreep under PB
Dismantling of Regulating Equipment with counter weight assy
Dismantling of Regulating Equipment with counter weight assy under PB
Dismantling of 25 Kv Post insulator
Dismantling of 25 Kv Post insulator under PB
Dismantling of small steel parts. NPB
Adjustment of existing OHE & Tower wagon checking under NPB
Adjustment of existing OHE & Tower wagon checking. under PB
Dismantling of foundation etc.
Supply of Single Earth Electrode
Erection of Single Earth Electrode. Above/
Preparation and supply of Design & Drawing for OHE.-Preparation of LOP & CSD Per Track
Preparation and supply of Design & Drawing for OHE.-Preparation of SED & As erected Drawing
Danger Plate in level crossing gate to electrified section for WB drg. No. ETI/C/0069, specification no. ETI/OHE/33(2/73)
Shock Treatment chart (Laminated)
Supply & Erection of Section Diagram Board
Modification to Section Diagram board at Stations and TPC Above/
Transportations of major Railway supply Materials from Railway stores to work site 101 /Released OHE mast/Portals/ttc etc of different Length by accumulating from different Location of working site and unload to GSD Raipur. Unit in MT may be treated as per MT/KM , Qnty 40000 comes from 50 MT x 50 Km i.e 2500 )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocument22.2026Signed_1.pdf Tender Document
ATTACHMENT
TenderDocument22.2026Signed_1.pdf
ATTACHMENT
Download all tender documents and submit your bid