| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-I₹48.6 LAccepted-AOC 281 DAKPATHAR ROAD VIKASNAGAR DEHRADUN UTTARAKHAND | VIKASNAGAR | DEHRADUN | UTTARAKHAND | 248125 | L-I | Accepted-AOC Lowest Qualified Bidder L-I | |
| 2 | L-II₹51.2 LRejected-AOC BHAJAN GARH KAILASH GATE MUNI KI RETI DISTT TEHRI GARHWAL | L-II | Rejected-AOC Rejected L-II | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Finance LODHA MANDI JWALAPUR HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | - | Not Admitted-Finance Not qualified for AOC | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹49.7 L
Closing Date
3 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER CIVIL
Executive Engineer (Civil) Pashulok Barrage, Rishikesh
Construction of Cut off wall near Bin Super Passage at Chainage 5.61 Km.
2021_UJVN_40509_1
23/2021-22/EE(C)/ Pashulok Barrage
Open Tender
Civil Works
Item Rate
120 days
Rishikesh
As per condition of the tender mentioned in tender document
2 documents required · 2 mandatory
₹2,360
DGM(CM-GV) Mayapur-Haridwar
Exempted
18 Aug 2023
20 Dec 2021
4 Jan 2022
20 Dec 2021
3 Jan 2022
27 Dec 2021
20 Dec 2021 - 27 Dec 2021
120 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge including supply of all material, labour, T&P etc. required for proper completion of the work.
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials All kinds of soil including supply of all material, labour, T&P etc. required for proper completion of the work.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand Zone III : 4 graded stone aggregate 20 mm nominal size including supply of all material, labour, T&P etc. required for proper completion of the work.
Providing and laying in position specified grade of Reinforced Cement Concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20 mm nominal size including supply of all material, labour, T&P etc. required for proper completion of the work.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars. required for proper completion of the work including supply of all material, labour, T&P etc. required for proper completion of the work.
Centering and shuttering including strutting, propping etc. and emoval of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including supply of all material, labour, T&P etc. required for proper completion of the work.
Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 8 gauge BWG including supply of all material labour T&P etc. required for proper complition of the work.
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared including supply of all materials, labour and T&P etc. required for proper completion of the work
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared including supply of all material, labour, T&P etc. required for proper completion of the work.
Engaging & operation of one no. wheel type excavator cum loader machine (preferably JCB/L&T/BEML etc) having capacity 75 BHP with one operator and one helper or skid steer loader Bob cat (height not more than 2.0 m) having capacity 75 BHP with one operator and one helper including cost of fuel lubricants and repair maintenance etc. for removal of slip / landslide/ excavation in dry and wet condition, complete in all respect as per direction of I/C. Payment for engaging excavator cum loader shall be made only for actual working hours at site, no idle charges shall be paid. If machine is trapped in slip / earth, contractor shall make its own arrangement to haul the machine, for which no extra payment shall be made to contractor, and also machine shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor.
Engaging & operation of one tractor along with one driver and one helper & trolley having hydraulic jack arrangement. Including cost of fuel lubricants and repair maintenance etc. for removal of slip / landslide/ excavation in dry and wet condition, complete in all respect as per direction of I/C. Capacity of tractor must be not less than 45 BHP, and loading capacity of trolley must not be less than 2.25 cum. Payment for engaging Tractor with trolley shall be made only for actual working hours at site, no idle charges shall be paid. If tractor is trapped in slip / earth, contractor shall make its own arrangement to haul it, for which no extra payment shall be made to contractor, and also tractor shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor. Cost includes the average running of 20 Km per day.
Supply unskilled labour for full day as per requirement for attending miscellaneous works as per direction of the Engineer in Charge for for proper completion of the work.
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. Serrated with central bulb (225 mm wide, 8-11 mm thick) including supply of all materials, labour and T&P etc. required for proper completion of the work
SANGAM CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .