Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
20 Apr 2026, 6:00 pmClosed
CHIEF ENGINEER (G)
Providing and applying liquid rubber waterproofing on RCC Roof slab in auxiliary buildings at GTPS
288197
EW-269
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹2,950
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹1.5 L
30 Mar 2026
30 Mar 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
1. SECTION-A:
ACKNOWLEDGEMENT OF TENDER FEE /EMD.
TENDER NOTICE.
2. SECTION-B:
DECLARATION FORM CUM UNDER TAKING TO
BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE TENDERER
3. SECTION-C:
GENERAL CONDITIONS OF CONTRACT
4. SECTION-D:
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES & LIST OF SAFETY
5. SECTION-E :
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
ANNEXURE – I (DETAILS OF BANK FOR
SOLVEANCY & BG)
6. SECTION-F:
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
STEEL / CEMENT
GENERAL GUIDELINES RELEVANT TO I.S.
7. SECTION-G:
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
DETAIL SPECIFICATION
8. SECTION-H:
SCHEDULE-B
Safe Maintenance Procedure
EW- 269 PUR-F-006 RFQ-75871
ACKNOWLEDGEMENT OF TENDER FEE
TENDER NOTICE
EW- 269 PUR-F-006 RFQ-75871
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663 Fax: 91-79-23217673,
e-mail: [email protected] ; Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
ACKNOWLEDGMENT
e- Tender for the
“Providing and applying liquid rubber waterproofing on RCC Roof slab in
auxiliary buildings at GTPS.”
TENDER FEE PAID VIDE DEMAND DRAFT NO. _________________________________
DATED___________________________ RS. __________________________________
EARNEST MONEY DEPOSIT PAID VIDE D.D. NO. _______________________________
DATED ____________________ RS. _____________________
1. The undersigned reserves the right to reject any or all tenders
without assigning any reasons thereof.
2. The Tender fee will be accepted in form of Demand Draft and Earnest Money
Deposit will be accepted in form of Demand Draft or Bank Guarantee of any
bank as prescribe in ANNEXURE- I drawn in favour of “GUJARAT STATE
ELECTRICITY CORPORATION LTD.” payable at Gandhinagar TPS
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 269 PUR-F-006 RFQ-75871
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663 Fax: 91-79-23217673,
e-mail: [email protected] ; Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Tender Notice No: GSECL/___/ __/ For Civil works
CE [Generation], Gandhinagar, TPS invites “On-line Tenders” (e-tendering) for the work of
“Providing and applying liquid rubber waterproofing on RCC Roof slab in
auxiliary buildings at GTPS.”Tender Papers & Specifications may be down loaded from
Web site https://gsecl.nprocure.com(For view, down load and on line submission) and
GUVNL / GSECL web sites www.gsecl.in (For view only).All tender documents are to be
upload (Notarized / self-attested copies of original – as specified in tender document) through
online only (mandatory) on (n) procure portal excluding Tender fee and EMD Tender fee and
EMD are to be submitted physically by Registered Post A.D. or Speed Post addressed to:
CHIEF ENGINEER (GENERATION), GUJARAT STATE ELECTRICITY CORPORATION LTD,
THERMAL POWER STATION, GANDHINAGAR-382041, GUJARAT. “NO COURIER SERVICE
OR HAND DELIVERY” will be accepted.
Tender Estimated E.M.D.
No. Cost Rs. Rs
“Providing 11 (Eleven) Rs. 2500+ Rs.
EW- and applying Months from 450 = Rs. 1,48,590 =00)
269 liquid rubber the date of 2950.00/- (One Lakh
waterproofing Rs. written (Two Forty Eight
Thousand Thousand
on RCC Roof ………………… order to
Nine Five Hundred
slab in /- commence hundred Ninety)
auxiliary the work. Fifty (Non
buildings at Refundable)
180 Days [From the opening
1 Validity of Tender
of Technical Bid].
Last Date for Online tender / offer submission through
2 As per Tender Notice
(n)Procure only up to 18:00 Hrs(This is Mandatory)
Last Date for physical receipt of cover for DD / Bank
Guarantee / Online payment reference for Tender Fee
3 As per Tender Notice
and EMD only up to 15:00 Hrs Through RPAD or
Speed Post Only
Date of opening of online Technical Bid, all relevant
documents submitted through online process, Cover
4 for Tender fee and EMD at 15:30 Hrs (Online technical As per Tender Notice
bid will be opened for Bidders who have submitted
Cover for Tender Fee and EMD)
Tentative date of on-line opening of price bid (if Party has to be in touch with
possible) at 15.30 hrs. website www.nprocure.com
and also with e-mail sent by
above website
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 269 PUR-F-006 RFQ-75871
1) Only following listed documents must be upload in n-process online only. No
physical documents are to be submitted except tender fee and EMD cover. Price
Bid shall not be submitted in Hard copy.
1. Demand Draft for Tender Fee and EMD (Original) cover only to submit through
RPAD/Speed post only.
2. The bidder shall have a separate Provident Fund Code of RPFC in the name of
company. The bidder, who does not possess such separate P.F. code, shall not be
considered for acceptance of tender. The contractor has to submit attested copy of
such certificate showing P.F. code along with the tender.
3. Attested copy of PAN No.
4. Attested copy of work experience certificate for the similar works executed.
5. List of work in progress.
6. Attested copy of firm registration [Applicable only to the firms registered under
Company Law]
7. Attested copy of partnership deed. [Applicable only to the partnership firms.]
8. Attested copy of power of attorney, if any, for signing the bid document.
9. Attested copy of balance sheet of profit & Loss account duly audited by Chartered
Accountant of at least 3 financial years, if work estimate is more than Rs.
10. Details of equipment, tools and plants immediately available with the tenderer for
use of this work.
11. Details of technical personnel.
12. Undertaking duly Notarized as per attached Declaration Form
13. Any other documents required to verify technical, financial capability of the
bidders & other Credentials
15. Attached The Copy Of GST Registration.
All such documents should be strictly uploaded in N-procure only expect Tender
Fee and EMD details cover. Otherwise the offer will not be considered and no any
further communication in the matter will be entertained.
2) In case any deviation is found in Data / Details / Documents uploaded on N-
procure online offer (e-tendering) documents then such tender will not be
considered and no any further communication in the matter will be entertained.
Tenders must be un-conditional. Conditional Tenders will be rejected.
3) Further bidders are requested to submit Technical Bid documents and price – bid
i.e. Schedule-B on line only and not to submit the Technical bid and price bid in
physical form expect Tender Fee and EMD details cover. This is mandatory. If
Technical bid document and price bid is submitted in physical form expect Tender
Fee and EMD details cover, same will not be opened and only on-line
Uploaded/submitted Technical bid document and price will be considered for
evaluation. The bidder is requested not to upload/submit the by online
(n)procure while bid submission on in (n)procure tender document, condition
of the contract, specification & other relevant documents, except documents
as stated here above. Instead of the same, the bidder shall upload on (n) procure
scan copy of the duly Notarized Undertaking as stated below declaration form on
the stamp paper of Rs. 300/-. However, bidder may download tender document
& preserve with them in Hard Copy for their future reference. Later on, L1
bidder shall be asked to collect the tender documents from the tender
inviting authorities for the purpose of contract agreement execution and
place their signature with seal of the company.
4) It is mandatory for all the bidders to submit their tender documents viz. on-line (e-
tendering) and uploading on (n) procure in scheduled time. Tender documents
submitted in physical form will not be accepted and considered expect Tender Fee
and EMD details cover. Also, all bidders shall submit required Physical documents
as stated in Tender Notice
5) GSECL reserves the rights to reject any OR all tenders without assigning any
reasons thereof.
6) Tender Notice Number & name of the work shall be clearly written on the covers of
containing the Tender Fee and EMD.
EW- 269 PUR-F-006 RFQ-75871
7) Technical / Price Bids will be opened on the day and time indicated in the tender
notice by an Officer nominated by the Purchaser in the presence of such of the
bidders who wish to be present. Any technical questions, information and
clarifications that may be required pertaining to this tender should be referred to
the CHIEF ENGINEER (GEN.) Gandhinagar TPS. Also during pre-bid meeting (if
arranged) the same may please be discussed
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering
process for the product which they are manufacturing / service which they
are providing and have Udyam registration for items / service under
procurement.
2. Start-ups which participate directly in tendering process for the product
which they are manufacturing/service which they are providing and re-
cognized by DPIIT under the Start-up India Program and has obtained
Udyam registration.
3. Organization which has registration certificate for the manufacturing
product of the tender, from Gujarat Khadi Gramodyog Board or Khadi and
Village Industries Commission(K.V.I.C)or Commissioner of Cottage
Industries.
4. Board/Corporations/PSUs of the Central/State Government for their
own manufactured items.
5. State Government recognized organizations like(i) organizations for blinds,
dumb and deaf, disabled, mentally disabled persons;(ii)women's self-help
group recognized by Gujarat Livelihood Promotion Company; which
participate directly in tendering process for the product which they are
manufacturing / service which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering
process as Manufacturers or Service Providers, and holds a valid Udyam
Registration, are eligible for exemption from payment of Earnest Money
Deposit (EMD).
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or
similar categories (i.e. other than Manufacturers/Service Providers) are not
eligible for EMD exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward
change in terms of investment in plant and machinery or equipment or
turnover or both, and consequent re-classification, an enterprise shall
continue to avail of all non-tax benefits of the category (micro or small or
medium) it was in before the re-classification, for a period of three years from
the date of such upward change.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 269 PUR-F-006 RFQ-75871
DECLARATION FORM CUM UNDER
TAKING TO BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE BIDDER
EW- 269 PUR-F-006 RFQ-75871
(To be uploaded on (n) procure online process duly notarized on Rs. 300/-
Non – Judicial Stamp Paper)
DECLARATION FORM
slab in auxiliary buildings at GTPS.”
Tender No/ RFQ No:
1. I/We hereby declare that I/We have carefully studied the entire tender placed
on the WEB site and conditions of contract, specifications and other
documents of this work mentioned in the tender and abide by the same.
Also, I/We hereby agree to execute the same accordingly.
2. I/We hereby abide to execute the contract agreement by downloading the
copies of the conditions of contract, specifications and other documents of
this work of otherwise I/we will get copy of the same from the office of the
3. I/We hereby accept and confirm that any dispute on this regard shall not be
4. I/We hereby declare that I/We have visited the work site and fully
acquainted myself/ourselves with the local situations regarding materials,
labour and other factors pertaining to the work before submitting the tender.
5. I/We hereby confirm that our offer is Un-conditional and without any
technical & commercial deviations.
6. Should this tender be accepted, I /We hereby agree to abide by to fulfill all
the terms-conditions and provision of the Tender and Contract for Works as
applicable and default thereof, to forfeit and to pay to the Gujarat State
Electricity Corporation Limited the sums of money due.
7. The full value of the “Earnest Money Deposit” paid herewith should be
absolutely forfeited to the Corporation, should I/ we do not execute /
commence the work after issuance of date of commencement by GSECL.
8. If, I fail to submit all required documents with application or tender copy ( in
each tender ) then my tender will be cancelled, which is binding to me.
EW- 269 PUR-F-006 RFQ-75871
9. If, full or part work will be given to me, it will be accepted to me with same
terms, rate & conditions.
10. I, ______ proprietor / owner / partner / Authorized Agent of M/s. ______ do
hereby also declare and undertake as under:
a) That in capacity of independent contractor for M/s. ______ (Sub-
Contractor of M/s. ______ ) worked as contractor at GSECL,
___________Thermal Power Station for the nature of work of ______ against
work Order No. ______ Dt. ______., I have complied with the provisions of all
laws as applicable. I have paid the wages for the month/s of my contractual
period which is / are not less than the minimum rates as applicable, to all
my employee/s and no other dues are payable to my employee/s.
b) That I have covered all the eligible employee/s under the Employees’
Provident Funds and Miscellaneous Provisions Act, 1952 and deposited the
contributions under my PF Code No. ______, place: ______ for the month/s of
my contractual period and as such no amount towards contribution
whatever is payable.
c) I further declare and undertake that in case any liability pertaining to
any of my worker, labour, employee/s is/are to be discharged by the
principle employer i.e. Gujarat State Electricity corporation Limited,
___________Thermal Power Station due to my lapse, I undertake to reimburse
the same or the principle employer is authorized to deduct the same from
my dues as payable.
d) I further declare and undertake the legal consequences which may
arise in future under the said work order awarded, and I bond myself to
resolve the same at the risk and cost of M/s. ______.
authorized signatory of M/s ______________________________________________
here by certify that M/s _________________________________________________
and their proprietor / any partner / any directors of the firm is not stop deal
and / or banned for business dealing and / or black listed by GUVNL and /
or their any subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL /
UGVCL / PGVCL as well as Government and / or Semi Government
company / department.
Seal & Signature of the Bidder
Phone / Mobile/ Fax No. & Company’s Seal
EW- 269 PUR-F-006 RFQ-75871
e- Tender for the work of “Providing and applying liquid rubber waterproofing on
RCC Roof slab in auxiliary buildings at GTPS.”
RTGS DETAIL OF BIDDER
Following RTGS details shall be submitted by agency along with the tender for direct
deposit of payment to the beneficiary account. Bidder has to submit the details as under:
1 Name of Bidder :-
2 Address for correspondence :-
3 E-Mail ID :-
4 Phone / Mobile No. :-
5 Name of Beneficiary :-
6 Bank Account Number of :-
beneficiary
7 Name of Bank of beneficiary :-
8 Name of Bank, branch & :-
9 Type of account :-
10 Bank Code :-
11 RTGS Code :-
12 IFSC Code :-
EW- 269 PUR-F-006 RFQ-75871
Project Synopsis and Data
1) Location :- Gandhinagar Thermal power station
2) Purchaser :- GUJARAT STATE ELECTRICITY
CORPORATION LTD
3) Engineer :- Chief Engineer(Gen)
4) Site of Project :- Gandhinagar,Gujarat State
5) Nearest town :- Gandhinagar
6) Nearest Railway Station :- Gandhinagar Capital(Ahmedabad is situated
at a distance of about 30.00Km)
7) Nearest Port :-
8) Nearest Air Port :- Ahmedabad-20Km(Approx)
9) Access Road :-
10) Site Elevation from MSL :- RL 81.5 M(floor level)
11) Meteorological Data
Ambient Air temperature
1] Highest monthly mean of :- 350 C
daily Max. Temperature
2] Maximum dry bulb :- 450 C
Temperature ( In 0C)
3] Minimum dry bulb :- 8.60 C
Temperature ( In 0C)
Rainfall
1] Average annual rainfall :- 1000 to 1200mm
2] For 01 hour ( In mm) :- 75 to 100mm
3] For 24 hour ( In mm) :- 250mm
Wind velocity
1] Maximum wind velocity :-
(In m/sec)
2] Wind direction – N,NE & SW :-
3] For 24 hour ( In mm) :-
Relative Humidity
1] Annual mean humidity ( In :- 50 to 60%
2] Maximum humidity (In %) :- 98%
3] Minimum humidity (In %) :- 2%
4] Type of Atmosphere :- Dry
12) DESIGN DATA
Seismic Data :-
Zone :- Zone-III as per IS 1893-1975
Intensity :-
Ambient temperature :-
Other Data :-
EW- 269 PUR-F-006 RFQ-75871
SCOPE OF WORK AND SITE CONDITIONS
A. CIVIL PORTION
The main scope of the work is “Providing and applying liquid rubber waterproofing
on RCC Roof slab in auxiliary buildings at GTPS.” Under the scope of this tender
the agency has to carry out the subject work as per all items of Schedule B and as
per detail technical specifications items. The quantities taken under individual
items are very tentative. However, the agency has to carry out the works as per the
Company’s requirements.
The agency has to carry out the works as per item & specifications of the tender by
providing all materials of best quality and of standard manufactures as the
samples approved by EIC and providing best workmanship through expert
The agency has to carry out the works as per the priority & schedule given by EIC
time to time even in on or off working hours of the office. The agency will take
complete care and will not damage any other structure in premises of company.
The agency has to carry out all the works by taking all due cares of safety, security
norms, with all risks including scaffolding, strutting, shoring, etc up to any height
irrespective of quantum of the work.
Contractor has to make arrangement for workable site condition with the
co operation of departments of company and agencies, all necessary
arrangement to get work permit is to be made by contractor. Day to day
cleaning is required after completion of job. The removed materials and
any other unwanted materials are to be transported and taken away as
instructed by E.I.C.
All safety measures shall be taken by the contractor with his own cost.
The scope of work to be carried out by the Contractor shall also include Clearance
of the site, Disposal of debris, excavated material etc,
The major works involvement generally mentioned as here under---
Removing of existing Bitumen waterproofing membrane including stacking
of serviceable materials and disposal of unserviceable materials with all lead and
lift per requirement and including tools & Tackles.
Prepare the surface thoroughly by cleaning, washing and removing dust,
dirt, oil, grease and loose particles apply grinding on surface and open all crack
and joint should be filed with using Non shrink grout Dr Fixit pidigrout 10M.
Damaged or hollow portions, sharp edges, etc. must be cut and repaired if
Providing and applying Dr Fixit roof seal ultra waterproofing on roof slab
and different junctions at roof slab. (a) Apply first coat of Dr Fixit prim seal on
surface with dilution of 1:0.5 with water by brush or roller (c) After apply first coat
apply second coat of Dr Fixit roof seal ultra UV stable membrane white coating on
roof slab with interval of 12 hour on entire surface properly by brush or roller (d)
Surface should be touch dry within 2 hour.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 269 PUR-F-006 RFQ-75871
Registration in VMS System
Additional Note: Vendor gets to register in VMS System through vms.guvnl.com.
For registration following documents are required and mail to
[email protected] and [email protected]. After registration vendor have
to upload the invoice in the VMS system for smooth functioning of payment.
Documents required for Registration:
(1) PAN Copy
(2) GST Certificate Copy
(3) Email ID
(4) Full Name of Vendor
EW- 269 PUR-F-006 RFQ-75871
SPECIAL NOTE FOR PRE-QUALIFICATION
slab in auxiliary buildings at GTPS.”
The tender documents are of two separate bids i.e. technical and price bids.
Bidder is requested to submit the technical bid with the following credentials
for post-qualification.
1. Bidder should produce evidence of having experience of successfully
completed works having satisfactory progress of similar works as defined
hereunder, carried out in Central & State Government / Semi-Government /
GSECL / GETCO / DGVCL / MGVCL / UGVCL/PGVCL during the last seven
years ending last day of the month previous to the one in which tender is
invited. Bidder should submit self-attested copies of documentary evidence,
preferably photo copies of work completion certificate, certificate regarding
works on hand progressing satisfactorily along with certificate of amount of
work done, work order with Schedule-B, etc. from the respective department.
The amount of work completed works should be either of the following:-
a. Three similar completed works each costing not less than the amount
equal to Rs. 19,81,200.00/-
b. Two similar completed works each costing not less than the amount equal
c. One similar completed works each costing not less than the amount equal
2. Similar work means Work of Civil construction with water proofing / Civil
maintenance works with water proofing / Roof treatment work /
waterproofing work for building or Structure / Industrial area water
proofing work.”.
3. Experience certificate of work executed with private firm shall not be
accepted. Experience as a joint venture or sub-contractor is not allowed and
price bid of such bidders will be rejected.
4. EMD: To pay EMD in form of DD OR in form of B.G. given by bank as
described in the Annexure – I.
5. Tender Fee: The tender fee shall be accompanied in the form of DD.
6. Separate employee’s Provident Fund code number towards
registration of firm with Regional P.F. Commissioner.
7. Last three year Audited annual accounts, Positive net worth
certificate, and average annual turnover certificate certified by
chartered accountants as per qualification requirement
Financial qualification criteria:
1. The Average Annual Turnover of the bidder shall not be less than
Rs. Rs. 14.85 Lakh during the preceding three (3) financial years as
one date of Techno-Commercial bid opening.
EW- 269 PUR-F-006 RFQ-75871
2. Net worth of bidder shall not be less than 100% of the bidder’s paid up
share capital as on the last day of the preceding financial year. In case
the Bidder meets the requirement of Net worth based on the strength of
its Subsidiary (ies) and/or Holding company and/or Subsidiaries of its
Holding Companies wherever applicable, the Net worth of the Bidder and
its Subsidiary (ies) and/or Holding company and/or Subsidiary (ies) of
the Holding Company, in combined manner should not be less than
100% of their total paid up share capital. However individually, their Net
worth should not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3
are individual net worth which shall not be less than 75 % of the
respective paid up share capitals and y1, y2, y3 are individual paid up
share capitals.
3. In case the bidder is not able to furnish its audited financial
statements on stand-alone entity basis, the unaudited unconsolidated
financial statements of the bidder can be considered acceptable provided
the bidder further furnishes the following documents for substantiation
of its qualification.
Copies of the unaudited unconsolidated financial statements of the
bidder along with copies of the Audited consolidated financial
statements of its Holding Company.
A Certificate from the CEO/CFO of the Holding Company, stating that
the unaudited unconsolidated financial statements form part of the
Consolidated Annual Report of the company.
4. In cases where audited results for the last preceding financial year as
on the date of techno-commercial bid opening are not available, the
financial results certified by a practicing Chartered Accountant shall be
considered acceptable. In case, Bidder is not able to submit the
Certificate from practicing Chartered Accountant certifying its financial
parameters, the audited results of three consecutive financial years
proceeding the last financial year shall be considered for evaluating the
financial parameters. Further, a Certificate would be required from the
CEO/CFO, stating that the financial results of the Company are under
audit as on the date of Techno-commercial bid opening and the
Certificate from the practicing Chartered Accountant certifying the
financial parameters is not available.
5. The bidder must submit Average Annual Turnover and Net worth
Certificate in support of Financial QR, duly certified and verified for
authenticity from Independent Statutory Auditor of their company /
Practicing Charted Accountant/ C.A. Firms / TPIA (Third-Party Inspection
Agency ) empanelled / approved by GSECL along with copy of Annual
Audited Accounts of last three years.
8. Attested copy of relevant document duly signed and sealed on each and every
page shall be submitted.
EW- 269 PUR-F-006 RFQ-75871
9. Attach copy of GST Registration.
10. Details of orders for similar nature/jobs carried out along with documentary
Evidence, Performance Certificate and their organization set up for such work
executed in past there of indicating the Names of the organizations, order no and
11. Bidder shall have to submit the PAN card No for Income Tax with documentary
12. Details of the partnership deed.
13. Details of Tools, tackles, equipments and personals available with firm relevant to
the job/subject matter.
14 Copy of the updated valid labor contract license from the appropriate authorities
and updated workman group insurance policy covering labor engaged.
15. The tenderer shall have to produce the document of last three years annual
account, i.e. profit & loss account and balance sheet, if the estimated cost of tender is
more than 50 lakhs along with technical bid.
16. Details of skilled/semi-skilled persons presently employed by the contractor
having sufficient knowledge of similar jobs.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
GENERAL INSTRUCTIONS TO THE BIDDERS
1. SUBMISSIOIN OF TENDER
The tender should be uploaded/ submitted online on n-procure process.
Technical bid cover:- This cover shall contain all relevant attested qualifying documents
as prescribed in tender notice along with tender fee & EMD. Bidder shall have submit
Tender Fee and EMD cover only, All other require document to be upload on online
(n)procure process only
Note: - If attested copies of qualifying documents stated as prescribed in tender
notice are not found in on-line Technical bid, but same should be submitted by mail
during scrutiny will be treated as final to consider the bid for pre-qualification. Any
missing documents, if required will be asked from the bidder as mentioned in this
tender elsewhere. If party has not submitted tender in online is liable to be ignored.
Technical Bid
“Please note that the Notarized / self-attested copies of original required
documents should be invariably uploaded in n-procure portal before due date and
time in pdf form (Scanned copy). This is mandatory. No physical documents are
required to be submitted except tender fee and EMD.
Price bid:-
The price bid shall have to be submitted online only. The percentage rates and price shall
be written both in words, and figures and the units in words. In case of any ambiguity or
mistakes, the unit rates and prices written in words shall be considered as final.
Offered rate shall include cost of all Materials, wastage of material , Labours for all leads
and lifts, Supervision, setting out works, Machinery and equipment with its mobilization /
demobilization, transportation charges, Clearing of the site both prior to commencement
and after completion of work. Consumables such as, but not limited to petrol, oil, diesel,
lubricants, drill bits, pipes, ropes etc. Construction facilities such as scaffolding,
tarpaulins, wind break, etc., Overheads / profits of Contractor for due performance of the
work under this contract.
Applicability of goods and service tax:-
1) The tenders shall be evaluated on firm price and cost with GST and cess as applicable
unless otherwise mentioned in the tender documents.
2) IF the supplier/contractor have opted for the composition scheme of GST, the same must
be clearly specified with valid declaration and certificate from department. In the event of
withdrawal/ cessation of the supplier from composition scheme during the tenure of the
contract, the rate(i. e. price) mentioned in the price bid shall be final and any additional
GST will have to be borne by the tenderer himself, In no case additional amount towards
GST or otherwise will be paid/reimbursed to supplier/contractor.
3) The bidder shall have to inform their GST no. of the registered place(s) where from the
bidder intends to supply the goods/services, meaning there by the bidder has to supply
the goods/services from the relevant declared/ registered place(s) of supply only.
4) The bidder shall not include GST in their quoted rates; but the bidder has to separately
indicate the GST rate, amount in the price bid schedule.
5) In-case Govt notification comes for change in GST , the same will be applicable.
6) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO.
(copy of PAN to be enclosed) Tenders submitted without GSTIN No by the firms, the offer
will be rejected without entering into further correspondence.
Further information required, if any, can be had from the office of the Chief Engineer,
GSECL, GTPS. But it must be clearly noted that the tenders must be received complete
in every respect by the due date and time.
i. The bidder must clearly quote rates in figure as well as in words. In case of any
discrepancy, whatever written in words shall prevail.
ii. No deviation in terms & conditions, Schedule-B and technical specifications will be
entertained. Any ignorance for this shall not relieve the contractor from his contractual
EW- 269 PUR-F-006 RFQ-75871
liability arising as per tender documents and conditions contained in it.
iii. The bidders are required to quote only firm prices. No variation will be accepted on
price/ raw materials/ finished products or on any other cause.
iv. The bidders should note that the completion of above mentioned works in all respect in
accordance with the time limit given is very important and should be strictly adhered to.
The work is to be completed in time limit from the date of issue of written order to
commence the work by the Chief Engineer (Gen.), GSECL, Gandhinagar TPS.
v. The bids should be valid for a minimum period of 180 Days from the date of opening of
technical bid. During this period tenderer shall not be allowed to withdraw their tender
and if withdrawn, the Earnest Money Deposit submitted with the tender will be forfeited.
vi. The works covered under these specification shall be carried-out and governed by
“Tender and contract for Works” booklet appended herewith except where conditions
specified in this specifications.
vii. The successful bidder shall have to enter in to an agreement for contract as per
G.S.E.C.L rules on a stamp paper of Rs.300/- and necessary stamp duty charge shall be
borne by the contractor/consultant.
viii. The complete specification comprises of the following.
Bill of Quantities (Schedule-B), instructions to the bidders, Tender specifications and
scope of work, Tender and contract for Works booklet, General Conditions, Instructions
to bidder & Technical specifications. All these sections are complimentary to each
other. The particulars and requirements contained herein shall cover the execution of
the works covered under these specifications.
ix. The tenderer must visit the site of works and see for him self the site conditions
regarding availability of approach road during all seasons and other matters affecting the
above works before submitting the tender.
x. The submission of tender by a contractor implies that he has read these instructions the
conditions of contract etc. and has himself aware of the scope and specifications of the
work to be done and of conditions and local conditions and other factors bearings on the
execution of the works. GSECL will not therefore after acceptance of contractor's rate
pay any extra charge for any other reason; in case the contractor is found later on to
have misjudged the site condition.
xi. GSECL’s authorized officers who accepts tender, shall have the right of rejecting all or
any of the tenders and will not be bound to accept the lowest offer nor to assign any
reason whatsoever for the rejection of any tender or all tenders.
xii. Bidders shall provide evidence of their continued eligibility to the satisfaction of the
xiii. Bidders shall not be listed under a declaration of ineligibility for corrupt or fraudulent
Practices issued by the Govt., the list of black listed Contractors announced by GSECL
(erstwhile GEB) Govt. of Gujarat or its Public Sector undertakings or the contractors who
are under stop dealing in GUVNL and /or their any subsidiary company viz.
GETCO/MGVCL/UGVCL/PGVCL/DGVCL.
xiv.The bid, and in case of a successful bid, the Form of Contract Agreement, shall be
signed with the name of Firm / company which will be legally binding on all partners
/ parties.
xv.If the application is made by an individual, it shall be signed by the individual above
his full typed written name and current address.
xvi.If the application is made by a proprietary firm. It shall be signed by the proprietor
above his full typed written name and the full name of his firm with its current
xvii.If the application is made by a partnership firm, it shall be signed by all the partners
of the firm above their full type written names and current addresses or alternatively
by partner holding power of attorney for the firm in which case a certified copy of the
power of attorney shall accompany the application. A certified copy of the partnership
deed, full names and current addresses of all the partners of the firm shall also
accompany the application.
xviii. If the application is made by a limited company or a Corporation, it shall be signed
by the authorized person holding power of attorney for signing application in which case
a certified copy of the power of attorney shall accompany the application. Such
Limited company or Corporation may be required to furnish satisfactory evidence of its
existence before the pre-qualification evaluation. They should also furnish Articles of
Memorandum of Association. If the application is made by group of companies, it shall
EW- 269 PUR-F-006 RFQ-75871
be signed by the authorized person. The authority letter shall be accompanied with the
application.
2. SECURITY DEPOSIT
It should be mandatory to submit security deposit as per cl no.7 of Section C (i.e.
General condition of contract).
3. MAINTENANCE:
i] The contractor shall be responsible to make good and remedy at his own expense any
defect which may develop or may be noticed before the period mentioned hereunder from
the certified date of completion. The same shall be attended within 15 days of receipt of
the notice. In the case of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the contractor. The Engineer-
in-charge shall be entitled to appropriate the whole or any part of the amount of security
deposit towards the expenses, if any, incurred by him in rectification, removal or re-
execution. The defects liability period shall be as under,
a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall
be 03 months from the certified date of completion.
b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put to
tender), the period shall be 06 months from the certified date of completion OR one
monsoon, whichever is later.
c) For major projects costing more than Rs. 01 crore, the period shall be 12 months
from the certified date of completion which should include one monsoon.
d) For building works, the period specified in (a), (b) shall be same except that time
period shall be 12 months instead of 06 months OR (c) shall be same as above except that
time period shall be 03 years OR elapse of 3 monsoon periods from certified date of
completion whichever is later.
e) For original building works the defect liability period will be 03 years OR elapse of
03 monsoon periods following date of possession of building taken over by user agency
OR 04 years or elapse of 04 monsoon period following the certified date of completion
whichever is later.
For the purpose of deciding monsoon period, the 30th September may be treated as the
last date.
f) For painting work (irrespective of amount put to tender): 1 year.
ii] For Water Proofing works guarantee period shall be kept as 5 (five) years from
actual date of completion. Besides above 5 years Performance bank Guarantee (PBG)
equivalent to 10% amount of estimate cost OR Work Order cost whichever is more
shall be submitted by the contractor prior to release of final bill payment.
Subsequently, if during the year (from date of completion of the work) no leakage is
observed in treated area, out of above 10% PBG, 2% amount shall be released each year
to the contractor on his written request.
In case of any leakages during the year is observed contractor must attend the
same during dry atmosphere but not later than 6 Months from date of intimation &
subsequently 2% PBG can be released.
If contractor fails to attend the complaint, 2% PBG of respective year shall liable to
forfeit with written intimation to the contractor.
iii] Over and above 10% PBG, there shall be provision of 5% S.D. which shall be released
after 6 months from actual date of completion of work.
iv] For anti-termite treatment guarantee period shall be kept as 3 years, with PBG & shall
be released on completion of Guarantee period.
4. TIME LIMIT FOR WORK:
EW- 269 PUR-F-006 RFQ-75871
The scheduled time limit for the completion of work shall be 11 (Eleven) Months
calendar months from the date of issue of letter to commence the work. However
extension in time limit will be granted by GSECL for the genuine reasons only as
per terms of the contracts.
5. TERMS OF PAYMENTS:
Contractor shall be paid RA bill after observing GSECL’s general procedure and
submission of bill by the agency. Also, 75% payment shall be made immediately
within a week period on receipt of recorded bill by Account Section without
checking of detail bill and compliance of queries & statutory requirement.
However, remaining balance 25% amount shall be released only after through
checking of detail bill and compliance of various quarries, statutory compliance
etc. The above payment term is applicable to all the bills of general civil works &
ARC/BRC works, provided the bills are recorded regularly and submitted to
Account Section within Ninety [90] days. If the contractor fails to submit the bills
regularly in such a way so that the same cannot be recorded and submitted to
account section within Sixty [60] days, ad-hoc payment as stated above, may not
be released and payment will be released as per GSECL’s general procedure. The
period of Sixty [60] days shall be considered from the date of receipt of last R.A.
Bill by Account Section.
6. METHOD OF PAYMENT:
a. The payment for the work done will be made by running bills every month
after taking joint measurement within 30 days.
b. Final bill will be paid within reasonable time after settlement of material
account by you and after recording of joint measurement.
7. All bidders shall submit the details/documents in support of Technical
Qualification Requirements duly certified and verified for authenticity from
Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of their
Company or Practicing CA/CA Firm along with a certificate regarding
verification of authenticity of documents as per the format placed at Appendix
1. All the documents submitted by the bidder in support of meeting Technical
QR only shall be digitally signed by the Specified Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA
Firm. In case documents are certified & verified for authenticity through TPIA,
the verification and certification of authenticity of documents is acceptable
from any of the following TPIAs:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt Ltd.
9. M/s Bureau Veritas (india) Pvt. Ltd.
10. Hertz Inspection & services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
Verification for authenticity shall not be applicable in following cases.
1. Bidders having proven track record or regular suppliers/contractors (i.e.
OEM/OES/PSUS)
2. Past order copies of GSECL as these documents can be verified internally.
The Bidder shall be responsible to get their documents/ credentials verified &
certified by the Specified Third- Party Inspection Agency (TPIA) or Statutory
EW- 269 PUR-F-006 RFQ-75871
Auditor of their Company or Practicing CA/CA Firm in support of Technical QR.
All the costs pertaining to third party verification and certification (including
those by statutory auditors) shall be borne by the Bidder. GSECL shall have no
liability (financial or otherwise) towards the same and shall not be liable for any
claim/ dispute between the bidder and the Specified Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm.”
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in//accreditation/reg_bod_inspection_bodies.php.
Annexure-1
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing
CA/CA Firm
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Ref: Date:
Power Station ……………….
Subject: Authentication of veracity of documents submitted by M/s …… in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ……………… (here in after called Bidder) having Registered office at ……………………
intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm as per the
list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents,
which are also attached with this letter. The same has been verified from the Original
Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
1. Doc ref. no. ……….. Dated …….. (Name of Documents)
2. Doc ref. no. ……….. Dated …….. (Name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of
authenticity.
We further confirm that we neither have any vested interest in aforesaid tender nor have
any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s
Thanking you,
EW- 269 PUR-F-006 RFQ-75871
8. ASSIGNMENT:
The rights and liabilities of the contractor shall not be assigned or transferred by them
without the consent in writing of the GSECL to any other person, firm or
organization.
9. The successful Bidder, on receipt of letter of intent will submit within a week's time
his planning / programme of works, for scrutiny of the GSECL in a Bar Chart format,
clearly indicating GSECL's inputs also. Contractor will plan his works such that
simultaneous work should progress in such a way that entire job is completed in
scheduled time limit on all the fronts released by GSECL.
10. The successful bidder will have to depute his authorized representative to attend
progress review meetings to be held at GSECL, Gandhinagar TPS without any extra cost.
11. The Contractor will be responsible for complying with all rules and regulations and
labour laws applicable to him and the GSECL will not be responsible for any lapses
committed by them. If there is any claim from any Government authority pertaining to
the contract, the same amount will be deducted from the Contractor's bill.
12. The time limit for completion of work is stipulated as in the tender will be adhered
13. The Contractor's rates should be firm and no variation clause is to be quoted by the
Contractor and GSECL will not accept the same, during contractual period including
extended time limit if any.
14. BIDDER TO STUDY, ANALYSE & CONSIDER:
a) The information given in this specification is in good faith and meant to serve
as a guide to the Bidder. It is, therefore, imperative that Bidder shall obtain and examine
for himself all the data, information and particulars required for the satisfactory
execution of the work under this tender. The submission of a bid by Bidder implies that
he has fully read the specifications, bid drawings, instruction to the bidder along with
Contract Document and Conditions of Contract, applicable labour laws, safety norms
etc., and has made himself aware of the scope and the specifications for the work to be
performed and local conditions and other features which have a bearing on the cost and
execution of the work. This specification is intended as a general description of quality
envisaged for materials and workmanship and of the finished work. It is not intended to
cover minute details. The work shall be executed in accordance with the best modern
practice and to the complete satisfaction of the Purchaser. Special techniques approved
by the Purchaser shall be used if and where found necessary. This specification shall
have precedence if anything contrary to this is stated elsewhere in the contract
documents. The Purchaser’s decision shall be final and binding on the contractor on any
issue arising out of such discrepancies.
b) Inspection of site by bidder:
Before submission of his bid, Bidder shall inspect the site, examine and obtain all
information required and satisfy himself regarding matters such as:
weather characteristics,
Location of site and access, right of way, means of communication & mode of
Transport to site,
The type and number of equipment and facilities required
The quantity of various items of the work.
The availability and rates of material.
Labours condition.
Local working conditions, obstructions and hindrances that may arise etc.
Power house, which is under running conditions.
Required GSECL’s security checks.
All materials brought to site only after making entries in security register at Control
c) These factors are likely to affect the satisfactory completion of work and or cost
thereof. The submission of a bid by the Bidder will be construed as evidence that
such an examination was made and any later claims/ disputes in regard to rates
quoted shall not be entertained or considered by the GSECL.
d) The site visit shall be done by the bidder on his own responsibility and all liabilities
including cash, arising out of the site visit shall be at the bidder’s account.
e) Contractor’s scope of work shall also include making all necessary arrangements
for access to work sites, stores and site offices etc. from the nearest approach road
EW- 269 PUR-F-006 RFQ-75871
to facilitate transportation of man power, machinery and equipment duly
considering the existing site conditions. No extra claims / costs will be entertained
f) The bidder shall carefully study the work to be carried out & consider all the
factors & shall take into account &consider all the factors such as lead, lift haulage
of materials, sequence of construction, etc. & shall allow for all such information /
data in the rates quoted.
g) The GSECL will not pay any extra charges or rate for any reason in case the
contractor claims, after acceptance of contract to have misjudged the site condition.
Ignorance of the intents and contents of the specification document and site
conditions shall not be accepted by the Owner as basis for any claims for
compensation.
h) BIDDER shall inspect the site, examine and obtain all information required and
satisfy himself regarding matters such as sub-surface conditions, water records,
access to site, communication, transport, right of way, the type and number of
equipment and facilities required for the satisfactory completion of work, the
quantity of various items of the work, the availability and rates of material, local
working conditions, uncertainties of weather, obstructions and hindrances that
may arise etc. which may affect the work or cost thereof, before submission of his
bid. Ignorance of site conditions shall not be accepted by the ENGINEER IN
CHARGE as basis for any claim for compensation.
i) The rates quoted by BIDDER shall be based on his own knowledge and judgment of
the conditions and hazards involved and shall not be based on any representations
of the Engineer in Charge. No claim on this account shall be admitted by the
j) The bidders shall submit on online in n-procure with their offer without any
deviations in general terms and conditions of the contract or in technical
specifications.
k) Tenders received after the time and date specified in the tender notice will not be
accepted. Once the offer is submitted by bidder before due date of submission, the
bidder shall not be allowed to submit revised/ additional/ modified offer even
before due date and time of submission of tender. However, if the date of issue
and/or submission of tender are extended by the Corporation due to any reason,
the bidder may submit if their wishes the revised/additional/modified offer before
extended due date and time of submission.
l) The Corporation reserves the right to accept any tender irrespective of whether it is
lowest or not or to reject all the tenders without assigning any reasons thereof.
Tenders deferring from the technical specifications or the method of bidding in a
radical manner may also be rejected.
m) The bidder shall be presumed to have carefully examined the drawings, conditions
& specifications of work & to have fully acquainted themselves with all details of
the site conditions, locations, materials, geological & weather characteristics,
labour conditions & in general all the necessary information and data etc.
pertaining to and need for the work.
n) This specification is intended as a general description of quality envisaged for
materials and workmanship and of the finished work. It is not intended to cover
minute details. The work shall be executed in accordance with the best modern
practice and to the complete satisfaction of the Purchaser. Special techniques
approved by the Purchaser shall be used if and where found necessary. This
specification shall have precedence if anything contrary to this is stated elsewhere
in the contract documents. The Purchaser’s decision shall be final and binding on
the contractor on any issue arising out of such discrepancies.
o) Each bidder shall also submit a 'Declaration' to the effect that the tenderer is an
engineering construction firm or an association of firm or firm which has
successfully carried out large works of this nature and has adequate organization
and experienced personnel to handle this type and magnitude of work. Information
should also be given regarding the constitution of the firm; it’s authorized,
subscribed & paid up capital, the date & place of registration, the place of
business, the names of the directors and other relevant information.
EW- 269 PUR-F-006 RFQ-75871
p) It is the intent of the ENGINEER IN CHARGE to incorporate these specification
documents in the final ‘Contract’. BIDDERS are required to review these documents
and clearly state in their proposals their acceptance of the same.
q) Each page of the bid document including the bid drawings shall be signed, stamped
and dated in ink by the BIDDER as a token of having examined the same. Any
correction in price and the rates entered in the Schedule of Price shall also be
signed and dated by the BIDDER in ink, before submitting the bid. Non-
compliance with this condition will make the bid liable for rejection.
r) All safety measures as required to be adopted as per the Statutory Regulations and
the Safety Rules of the Plant shall be strictly followed by the Contractor during the
execution of the Contract. The Contractor shall set up a suitable safety
organization of his own in this regard.
s) In connection with the execution of the Contract, the Contractor shall comply with
all applicable statutory Rules & Regulations including employment of labours at
t) The Contractor shall carry out any and all such works, as may be required, for civil
work to be completed in all respect as per the Contract Specification.
u) If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site,
he shall direct the Contractor to depute more numbers of supervisory
personnel/workers to meet the completion schedules as per the Contract. Upon
receiving such direction, Contractor shall deploy additional personnel within 7 days
without any extra cost.
v) The GSECL may during the progress of work, order the removal of part or whole of
the work executed, found not in accordance with the specifications/ instructions.
No extra claims shall be entertained for re-executing or altering of such work.
15. SAFETY MEASURES:
The contractor shall ensure the safety of workers, material and structure including
existing structures during execution of the contract. Safety measures shall be
followed during operations of equipments/machinery being used. No separate
payment shall be made for the safety measures and the quoted rates shall include
the cost for all safety measures.
16. COMPLETENESS:
Any technical services as set forth here in above and which might not have been
specifically mentioned in this Contract relating to the work or in the specifications
and which are not expressly excluded therefore but which are necessary for the
performance in accordance with the specifications as an integral part of the
painting and misc. Civil works shall be rendered by the Contractor without any
extra cost.
17. TOTAL RESPONSIBILITY
The Contractor shall be solely responsible for the entire technical works / services
irrespective of works / services have been made /rendered by him.
18. PAYMENT TO THE LABOURES:
(a) Contractor has to pay the CPF as well as salary to his skilled/unskilled
manpower by cheque A/c payee only, as per minimum wages & prevailing
applicable rules on or before 7th day of next month.
(b) Contractor has to produce challan of PF with list of employees.
(c) Contractor shall have to make payment to his labours in presence of Personal
Officer (Estt.) GSECL, Gandhinagar TPS.
19. CONTRACT AGGREMENT ON ACCEPTANCE:
The successful contractor will have to sign an agreement as per the Gujarat State
Electricity Corporation Ltd.'s rules on stamped paper and the necessary stamp
duty charges shall be borne by the contractor.
On acceptance of the tender the name (s) of the accredited representative (s) of the
tenderer who would be responsible for taking instructions from the Engineers of
the GSECL shall be communicated to Chief Engineer (Gen.) Gandhinagar Power
Station, Gujarat State Electricity Corporation Limited.
20. Unsatisfactory progress of the work:
If the work is found not progressing as per the requirement or found not
satisfactory then GSECL will take such action to get the work done through the
EW- 269 PUR-F-006 RFQ-75871
other agency at agency’s risk and cost with 15% supervision charges and same
will be recovered from agency.
21. The EMD will be returned promptly to the unsuccessful bidder except that of L1, L2
& L3 till the successful contractor pays the Security Deposit as mentioned in
tender document or after the expiry of the validity of the offer, whichever is earlier.
The EMD will be returned to the successful tenderer after he furnishes the
Security Deposit for the tender work. If he fails to furnish the SD, his EMD shall
be forfeited and the tenderer will not be allowed to participate in the tenders
invited by this office for a period of ONE Year in respective Power Station.
The EMD in form of Bank Guarantee shall be valid for Ten Months from the
date of submission of the tender.
22. Effect and validity of Bid: The submission of bid with these documents and
specification shall constitute an agreement that bidder shall have no cause of
action or claim against the GSECL for rejection of his bid. The GSECL shall always
be at liberty to reject or accept, split any bid or bids at its sole discretion and any
action will not be called into question and the bidder shall have no claim in that
regards against the GSECL.
23. Stop Deal / Banned for business dealing / Blacklisting :-
Has submitted fake, false or forged documents/certificates
Has revised/ withdrawn price bid after opening of Techno-commercial bid, until
and unless it is sought for,
Has tempered with the stipulated tendering procedure.
Has refused to accept Letter of Acceptance / Purchase order / Work Order after
the same is issued by the company within the validity period and as per agreed
terms and conditions,
Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
Has failed to provide suitable expertise for the work as per pre-scheduled
Has failed to submit all the necessary tests reports / documents within time
scheduled / as per company’s time limit, as mentioned in the LOA, if the Letter of
Acceptance (LOA) is placed subject to submission of type reports / documents to
Has indulged in construction and erection of defective works.
Has supplied inferior quality / defective materials and refused to replace with
stipulated time frame, as specified by the company,
Has substituted materials in lieu of materials supplied by the company or has not
returned or has short returned or has unauthorisely disposed of materials /
documents / drawings / tools or plants or equipment supplied by the Company,
Has involved in malpractices such as bribery, corruption, fraud, canvassing and
pilferage,
Has unauthorisely obtained official company information or copies of documents,
in relation to the Tender / Contract.
Has failed to follow the stipulated mode of communication, if specified by the
tendering authority / Purchaser.
Has parted with, leaked or provided confidential / proprietary information of the
company given to the firm only for its use (in discharge of its obligations against
an order) to any third party without prior consent of the Company,
Any other ground for which in the opinion of the Company makes it undesirable
to deal with the Firm
In case the state Government directs the Company to place a firm in stop dealing
/ banned for business dealing / blacklisting.
24. Conflict of Interest among Bidders / Agents
A bidder shall not have conflict of interest with other bidders for particular
quoted item. Such conflict of interest can lead to anti-competitive practices to
the detriment of Procuring Entity's interests. The bidder found to have a conflict
EW- 269 PUR-F-006 RFQ-75871
of interest shall be disqualified. A bidder may be considered to have a conflict of
interest with one or more parties in this bidding process for particular quoted
a) They have proprietor/partner(s)/Director(s)in common; or
b) They receive or have received any direct or indirect
subsidy/financial stake from any of them; or
c) They have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third
parties, that puts them in a position to have access to information about
or influence on the bid of another bidder, or
e) bidder participates in more than one bid in this bidding process.
Participation by a bidder in more than one Bid will result in the
disqualification of all bids in which the parties are involved. However,
this does not limit the inclusion of the components/ sub-assembly/
assemblies from one bidding manufacturer in more than one bid.
f) In cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two manufacturers
or quote on their behalf in a particular tender enquiry. One
manufacturer can also authorise only one agent/ dealer. There can be
only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on
his behalf; and
2. Indian/foreign agent on behalf of onIy one principal.
g) A Bidder or any of its affiliates participated as a consultant in the
preparation of the design or technical specifications of the contract that
is the subject of the Bid;
h) in case of a holding company having more than one independently
manufacturing units, or more than one unit having common business
ownership/ management, only one unit should quote. Similar
restrictions would apply to closely related sister companies. Bidders
must proactively declare such sister/common business/ management
units in same/ similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of
competition act, as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration,
that bidder shall not have conflict of interest with other bidders for
particular quoted item, as above.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
SECTION-C:
GENERAL CONDITIONS OF CONTRACT
EW- 269 PUR-F-006 RFQ-75871
GENERAL CONDITIONS OF CONTRACT
1. DEFINITIONS :
(a) The Contract means the documents forming the tender and acceptance thereof,
together with the documents referred to therein or individual work order in the
case of term contract, including these conditions, schedules and/or additional
conditions attached to the form of tender or individual works, order, rate
schedule, the specifications and the drawings and all these documents, as
applicable, taken together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender, the applicable schedules
and/or additional conditions and the specifications and/or drawing as issued to
the contractors for the purpose of preparing tender.
(c) The expression “Works” or “Work” when used in the condition of contract shall,
unless there be something in the subject or context repugnant to such
construction means, the works or the work contracted to be executed under or in
virtue of the contract whether original or altered.
(d) The “Contractor” means the individual or firm or Corporation, whether
incorporated or not, undertaking the words and shall include his or its legal
personal representatives, successors and permitted assignees.
(e) “Corporation” means The Gujarat State Electricity Corporation Ltd. and the
“Accepting Officer” means the Officer who is authorized to sign and signs the
contract on behalf of the “Corporation”.
(f) The letter “EE” means Executive Engineer who in the case of measurement and
lump sum contract, direct the contract and the letters “SE” means
Superintending Engineer and “GM” means General Manager who administers
and in the case of the term contracts, directs the contract.
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the
General Manager to supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer
(Gen), Gandhinagar TPS to Superintending Engineer or the person deputed by
him for the particular purpose.
(i) “BS.” means “British Standards” as issued by the British Standards Institution.
“A.S.” means the “American Standards” as issued by the American Standards
Institution, and “I.S.” means the “Indian Standards” as issued by the Indian
Standards Institution. Wherever the above-mentioned abbreviations are referred
to, in the specifications and/or work orders, they mean the addition with all
amendments current at the date of issue of tender document of work orders.
(j) In the case of measurement and terms of contract “Specifications” mean those
contained in Gujarat State Electricity Corporation Ltd. scheduled together with
any amendments etc. embodied in the tender documents. “Drawing” refers to
those incorporating the tender documents and/or any work orders referred
(k) The “Contract Sum” means the sum accepted or the sum calculated in
accordance with the prices accepted in the tender and/or the contract rate as
payable to the contractor for the full and entire executing and completion of
(l) “The date for completion” is the date or dates of completion of the work or any
part of the works set out or ascertained in accordance with the individual work
orders and the tender documents or any subsequent agreed amendments
2. CONTRACTOR TO INFORM HIMSELF FULLY:
A. Notwithstanding anything contained to the contrary in the specifications or
tenders in subsequent exchange of correspondence, the conditions of contract
shall be binding on the Contractor and any change or variation expressed or
implied, however made in the said conditions, shall not be valid or operative
unless expressly sanctioned by the Corporation. The Contractor shall be deemed
to have fully informed himself and to have special knowledge of the provisions of
the conditions of the Contract herein contained.
EW- 269 PUR-F-006 RFQ-75871
B. The contractor shall be deemed to have carefully examined the work and site
conditions, the general conditions, the special conditions, specifications,
schedules and drawing and shall be deemed to have visited the site of the
works and to have fully informed himself regarding the local conditions.
C. If there shall have any doubt as to the meaning of any portion of these general
conditions or special conditions of the scope of work of the specifications or any
other matter concerning the contract, he shall in good time before submitting
his tender, send for the particulars thereof and submit them to the Engineer-in-
charge in writing in order that such doubt may be removed.
3. CONTRACT DRAWING AND SPECIFICATIONS:
The contractor will be entitled to receive one set of agreement along with one
certified copy of accepted tender.
The drawings which form part of these specifications show the work to be done
in as much detail as is possible at the present stage. They will be supplemented
by such additional detailed drawings as may be necessary as the work
progresses. The contractor shall perform the work on these features and in
accordance with these additional or revised drawings as the case may be and at
the applicable rates as per the contract.
The contractor shall check all drawings carefully and shall bring to the notice to
the Engineer-in-charge immediately of any errors or omissions discovered. The
contractor shall not take advantages of errors or omissions of any kind in the
drawings supplied.
4. INPUTS BY GSECL:
The electric power supply and connection for construction / work purpose shall
be given at one mutually agreed point at work site free of cost by the GSECL.
Further extension for construction site as well as bore well site for using
construction water will have to be carried out by the contractor as per
requirement at their cost. The necessary electric charges will be paid by the
contractor as per rates prevailing from time to time in the respective DISCOM.
1. If there are any surplus quarters available after meeting the requirement of
GSECL's staff, then GSECL will consider allotment of quarters on rent as per
GSECL's rule.
2. The contractor will have to make their own arrangement of water for
construction work as well as for their labourers at his own cost. If possible,
water for construction purpose only at one point as decided by EIC and
recovery for water charges shall be affected at the 2 % of the item of which
water is used or by quantity measured by meter reading of water meter
installed by contractor, rate of water supply will be charged at prevailing
purchase rates of GSECL, for water supplied by GSECL is used as certified
by EIC. In case of agency is installing bore well and pumps at his cost, after
completion of work agency will hand over the bore well in good condition
with pumps to the GSECL.
5. DATA TO BE FURNISHED BY CONTRACTOR:
The contractor shall submit to the Executive Engineer for approval within one
week of the date of contract, a layout plan of construction plant and
equipment for the execution of work which the contractor proposes to
adopt at site.
Prior to commencement of work, the contractor shall submit to the Executive
Engineer for approval, plans in triplicate showing the location of Major plant
shop and storage buildings, storage yards, offices, contractor's power house
including its services and housing facilities which he proposes to put up at site
and also indicate the programme of the work.
The successful bidder on receipt of letter of intent will submit within a week's
time his planning/programme of works for scrutiny of GSECL in a PERT/Bar
chart format, clearly indicating GSECL inputs also.
Contractor will plan his works such that on all the fronts released by GSECL,
simultaneous work should progress in such a way that entire job is completed
in scheduled time limit.
EW- 269 PUR-F-006 RFQ-75871
No change in the approved layout shall be carried out without specific written
approval of the Executive Engineer.
6. ERRORS, OMISSIONS AND DISCREPANCIES:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or
discrepancies in the drawings and items of work in specification, reference shall
be made to the Executive Engineer whose elucidation and elaboration shall be
considered as authoritative. The contractor shall be held responsible for any
error that may occur in the work thorough lack of such reference and
precautions.
7. SECURITY DEPOSIT: In tender process for L1 bidder (lowest bidder)
security deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. Works More than
5 Lakh Rs. 5 Lakh
Enterprise or Exempted 3% of order value
Organization which are
exempted from paying
Tender Fee & EMD
For all other Enterprises 5% of order value 5% of order value
Note: Security Deposit will be collected from the successful tenderer at the rates
mentioned above. This may be recovered by deduction through running bills of
the contractors and / or by treating the Earnest Money Deposit (Bid Security)
paid at the time of submission of the tender.
After issue of Work order and Date of commencement, if successful bidder failed to start
the work then, RPAD notice will be issued to the successful bidder mentioning that on
failing to start the work within next 07 days from the date of issue of RPAD Notice the
EMD will be forfeited and he will not be allowed to participate in the tenders invited from
Gandhinagar TPS office for the period of One year.
The security deposit of the contract value shall be released on finalization of final bill /
successful completion of the work.
All damages, costs, charges, expenses and other sums which may be or may become due
or payable by the contractor to the Corporation under the terms of the contract, may be
deducted from the cash in the proceeds of sale of the securities/bank guarantee so
deposited (which the officer or person to whom the same may be endorsed as aforesaid is
hereby authorized to sell/to encase for that purpose) or from the interest of any such
securities or from any sums due or which may become due to the contractor by the
Corporation or from the whole or the balance unpaid as aforesaid of the encase securities
so deposited being repaid or transferred and returned as the case may be, to the
contractor on finalization of final bill OR after 06 (six) months of successful completion of
the work, whichever later OR on furnishing of the Performance Bond amounting to 5% of
contract value against the defect liability period as mentioned in this document elsewhere.
If entire security deposit is paid in approved form of Bank Guarantee should be remain
valid during the contractual period and such bank Guarantee should not be reduced on
the basis of the work actually done
8. USE OF LAND:
The land required for office, godowns and for labour camp if not available with GSECL,
then the contractor has to arrange the same at his cost. GSECL will give the land only if
the spare land is available with the following conditions.
The contractor shall be permitted to use for the bonafide purpose of execution of this
contract free of cost. The contractor shall be permitted to use for the bonafide purpose of
execution of this contract free of cost.
1. Site required for the construction of the work.
2. Required approach road. The contractor shall make their own arrangements for the
necessary approach, road, for transport of their materials and be responsible for the
EW- 269 PUR-F-006 RFQ-75871
compensation on account of damage to crop etc. and shall till completion of work.
3. He will be charged the rent at the annual rate of rupees one hundred per every
acre or part thereof, for the construction of temporary hutments and his store yard.
However area required for such purpose may be clearly indicated in this offer.
All areas of operation, including those for his staff and labour colonies handed
over to the contractor shall be cleared and handed over back in good condition to the
Engineer except areas under works as per this contract or those for which specific
approval has been obtained from the Engineer. The contractor shall make good to the
satisfaction of the Engineer any damage or alternation made to areas which he has to
hand over back or to other property land handed over to him for purpose of this work.
Temporary structures may be erected by the contractor for storage sheds,
offices, residence etc. for noncommercial use on the land, handed over to him at his own
expense and with the permission of the Engineer. These structures shall comply with the
regulation that may be in force and/or specified by the Engineer with regard, thereto. In
any circumstances for constructing temporary structures for contractor's use, GSECL's
free supply materials shall not be used. If it is found that GSECL's free supply materials
are used for other than approved project drawings work, same will be recovered at
Penalized rate.
The contractor shall preserve all existing vegetation such as trees on or adjacent to
the sites which do not interfere with the construction as determined by the Engineer.
The contractors shall take all possible precautions in felling trees authorized for
removal to avoid any unnecessary damage to vegetation and trees not to be felled and to
structures under construction, or to workmen, and shall be responsible for any damage if it
occurs in such operations
All produce from cutting of trees; grass etc. shall be the property of GSECL
and shall be stocked at the place specified by the Engineer. No claim shall be
made for such cutting and stacking of trees or grass etc. by the contractor
The contractors shall not unnecessarily or for use as fuel, cut any trees
brush wood, grass or other vegetation nor shall set fire there to without the
written permission of the Engineer. When such permission is given, the
contractor shall take necessary measures to prevent damage or to prevent fire
spreading to surrounding property, and shall be responsible for any such
damage, if cause.
The land shall as herein before mentioned be handed back to Engineer in
Charge immediately after the completion of the work under this contract.
Also no land shall be held by the contractor longer than the Engineer shall
deem necessary and the contractor shall, on due notice by the Engineer,
vacate and return the land which the Engineer may certify as no longer
required by the contractor for purpose of the work.
9. START OF WORK:
The contractor shall not enter upon or commence any portion of work except
with the written authority or instructions of the Executive Engineer or his
subordinate in charge of the work, failing such the contractor shall have no
claim to ask for measurement or payment for work and shall be responsible for
any claims or damages that may arise due to such unauthorized
commencement or entry.
10. COMPENSATION FOR THE DELAY:
The time allowed for carrying out the work as entered in the tender shall be
strictly observed by the contractor and shall be reckoned from the date on
which the order to commence work is given to the contractor. The work shall
throughout the stipulated period of contract be proceeded with all due diligence
(time being deemed to be the essence of contract) and for delay, the contractor
shall pay compensation, an amount equal to ½ (half) percent per one week for
the contract amount or part thereof, including taxes & duties ( i.e. End cost of
contract amount including taxes & duties) and maximum up to 10 % of the
order value, including taxes & duties ( i.e. End cost of contract amount
including taxes & duties) or such smaller amount as per the decision of the
Competent Authority of the GSECL The penalty will be invariably deducted
from the bills of the contractor and no refund will be given unless the
competent authority approves the reduction. The reasons for delay, attributable
EW- 269 PUR-F-006 RFQ-75871
to GSECL as well as to party will be brought out clearly while putting the
proposal for waiver/reduction in penalty.
11. ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which under any clause or clauses of this contract the contractor
shall have tendered himself to pay compensation amounting to the whole of his
security deposit (whether paid one sum) or in the case of abandonment for the
work owing to serious illness or death of the contractor or any other cause, the
Executive Engineer on behalf of the Corporation, shall have powers to adopt (a)
below and any of the following courses under (b) and (c) as he may deem best
suited to the interest of the Corporation.
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the
contractor under the hand of the Executive Engineer shall be conclusive
evidence and in that case the security deposit of the contractor shall stand
forfeited and absolutely at the disposal of the Corporation. To employ labour
paid by the Corporation, to supply materials, to carry out the works or any part
of the work debiting the contractor with the cost of the labour and the price of
the materials (as to the correctness of which cost and price, the certificate of the
Executive Engineer shall be final and conclusive against the contractor) and
crediting him with value of the work done in all respects in the same manner
and at the same rates as if it had been carried out by the Contractor under the
terms of this contract and in that case the certificate of the Executive Engineer
as to the value of the work shall be final and conclusive against the contractor.
(b) To order that the work of the contractor be measured up and to take such part
thereof, as shall be unexecuted, out of his hands and to give it to another
contractor to complete, in which case, any expenses, which may be incurred in
excess of the sum, which would have been paid to the original contractor, if the
whole work would have been executed by him (as to the amount of which excess
expenses, the certificate in writing of the Engineer-in-charge shall be final,
conclusive and shall be borne and shall be paid by the original contractors and
shall be deducted from any money due to him by the Corporation under the
contract or otherwise from his security deposit of his proceeds sale thereof or a
sufficient part thereof.
(c) In the event of the above courses being adopted by the Executive Engineer, the
contractor shall have no claim to compensation for any loss sustained by him
by reason of his having purchased or procured any materials or entered into
any engagements or made any advances on account of or with a view to the
execution of the work or the performance of the contract. And in case the
contract shall be rescinded under the provision aforesaid, the contractor shall
not be entitled to recovery or be paid any sum for any works thereof actually
performed by him under this contract unless and until the Executive Engineer
shall have certified in writing the performance of such work and the amount
payable to him in respect thereof and he only be entitled to be paid the amount
so certified.
12. NOTICE UNDER UNSATISFACTORY PROGRESS:
If the progress of a particular portion of the work is unsatisfactory, and also if
as per the opinion/observation of the Executive Engineer (whose decision shall
be final) in charge that the general progress of work is not satisfactory, then
Executive Engineer in charge shall be entitled to take action under clause 11 (c)
after giving the contractor ten days’ notice in writing and the contractor will
have no claim for compensation for any loss sustained by him owing to such
13. ACTION IN THE CASE OF DEFAULT BY THE CONTRACTOR :
In any case in which any of the powers conferred upon the Executive Engineer
by Clauses 11 and 12 hereof shall have exercisable and the same shall not have
been exercised, the non-exercised thereof shall not constitute a waiver of any of
the conditions hereof and such powers shall not withstanding be exercisable in
any further case of default by the contractor of which, by any clauses hereof, he
is declared liable to pay compensation amounting to the whole of his security
deposit and liability of the contractor for past and future compensation shall
remain unaffected in the event of the Executive Engineer taking action under
sub-clause (a) or (c) of Clause 11, he may if he so desires, take possession of all
EW- 269 PUR-F-006 RFQ-75871
or any tools, plants, materials, and stores in so upon the work or the site
thereof belonging to the contractor, or procured by him and intended to be used
for the execution of the work of any part thereof paying for allowing for the
same in account at the contract rates, or in the case of a contract rates not
being applicable of current market rates to be certified by the Executive
Engineer whose certificate thereof shall be final. In the alternative, the
Executive Engineer may by notice in writing to contractor or his clerk of works,
foreman or other authorized agent, require him to remove such tools, plant,
materials or stores from the premises within a time to be specified in such
requisition, the decision to the contractor failing to comply with any such
requisition, the decision of the Executive Engineer as to the expense of any
such removal and the amount of the proceed and expense of any such sale, be
final and conclusive against the contractor
14. EXTENSION OF TIME LIMIT
If the contractor shall desire an extension of the time limit for completion of the
work on the ground of his having been unavoidably hindered in its execution or
on any other ground, he shall apply in writing to the Executive Engineer and
the Executive Engineer may, if in his opinion there are reasonable grounds for
granting extension, recommend such extension as he may think necessary or
proper. The decision of the competent authority in this regard shall be final,
and binding to the contractor. Any delay attributed to Corporation, shall be
thus compensated only by way of extending the limit.
15. COMPLETION CERTIFICATE
On completion of the work, the Contractor shall be furnished with Completion
Certificate by the Executive Engineer. No such certificate shall be given nor
shall be the work considered to be completed until works are taken over and/or
duly tested and put to operation as the case may be, nor until the work shall
have been measured by the Engineer-in-Charge or where the measurement
have been taken by his subordinates until they have received the approval of
the Executive Engineer the said measurement being binding and conclusive
against the contractor.
16. EFFECT OF THE CERTIFICATE :
No payment shall be made for any work estimated to cost less than Rs.1,000 till
after the whole of said work shall have been completed and a certificate of
completion given. But in the case of works estimated to cost more than
Rs.1,000, contractor shall on submitting a monthly bill thereof, be entitled to
receive payments. Proportionate to the part of the work then approved and
passed by the Engineer-in-Charge, whose certificate of such approval and a
passing of the sum so payable shall be final and conclusive against the
contract. All such intermediate payment shall be regarded as payment by way
of advance against the final payment only and not as payments for work
actually done or completed and shall not preclude the Engineer-in-charge from
requiring bad, unsound, imperfect or unskillful work to be removed and taken
away and reconstructed or re-erected nor shall any such payment be
considered as admission of the due performance of the contract or any part
thereof in any respect of the occurring of the claim nor shall conclude,
determine or effect in any way the powers of the Engineer-in-Charge as to the
final settlement and adjustment of the accounts otherwise or in any other way,
vary or affect the contract. The final bill shall be submitted by the contractor
within one month of the date fixed for completion of work; otherwise the
certificate of the Engineer-in-charge of the measurement and of total amount
certificate of the Engineer-in-charge of the measurement and of total amount
payable for the work shall be final and binding on all parties.
17. PAYMENT TO CONTRACTORS :
The rates for several items of works estimated to cost more than Rs.1,
agreed to within shall be valid only when the item concerned is accepted,
having been completed full, in accordance with the sanctioned specification. In
case, where the items of the work, are not accepted, as so completed, the
Engineer-in-charge, may make payment on account of such items at such
reduced rates, as he may consider reasonable in the preparation of final or
running accounts bills and it will be binding to the contractor.
18. BILLS :
EW- 269 PUR-F-006 RFQ-75871
The Bill Shall be submitted by the contactor each month on or before the date
fixed by the Engineer-in-charge, for all works, executed in the previous month
and the Engineer-in-charge shall take or cause to be taken the requisite
measurement for the purpose or having the same verified and the claim so far
as it is admissible, shall be adjusted, if possible, within Fifteen days from the
presentation of the bills. If the contractor does not submit the bill, within the
time fixed, as aforesaid, the Engineer-in-charge may depute a subordinate to
measure up the said work in the presence of the contractor or his duly
authorized agent, whose counter signature in the measurement shall be
sufficient warrant and the Engineer-in-charge may prepare a bill from such list
which shall be binding on the contractor in all respects. In case if contractor/
representative does not remain present on specified date for taking
measurement than EIC may take the measurement one sided and the same
shall be binding to the contractor irrespective whether he has signed or not.
19. SUPPLY OF MATERIALS TO CONTRACTOR [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
SCHEDULE A ]
If the specification of the estimated work provides for use of any special
description of material to be supplied from the Corporation’s stores or if it is
required that the contractor shall use certain stores to be provided by the
Engineer-in-charge, (such material and stores and the prices to be charged
thereof as hereinafter mentioned being so far as practicable for the convenience
of contractor but not so as in any way to control, the meaning or effect of this
contract specified in the schedule or memorandum hereto annexed). The
contractors shall be supplied with such materials and stores as may be
required from time to time be used by him for the purpose of the contract only
and the value of the full quantity of materials and stores so supplied shall be
set off or deducted from any sum due or thereafter to become due to the
contractor, under the contract or otherwise or from the security deposit or the
proceeds of sale thereof if the deposit is held in government securities the same
or a sufficient portion thereof, shall be sold for the purpose. All materials
supplied to the contractor shall remain the absolute property of the
Corporation and shall on account be removed from the site of work and shall at
all times be open to inspection by the Engineer-in-charge. Any such materials
unused and in perfectly good condition at time of completion or determination
of the contract shall be returned to the Corporation’s store if the Engineer-in-
charge so requires by notice in writing given under his hand but the contractor
shall not be entitled to return any such materials except with such consent and
he shall have no claim for compensation on account of any such materials
supplied to him as aforesaid but remaining unused by him or for any wastage
in or damaged thereto. The contractor shall be responsible for the loss,
destruction or deterioration of the materials, stores or articles supplied to him
by the Corporation even if such loss, destruction or deterioration has occurred
under any circumstances whatsoever beyond his control as if the materials,
stores or articles so supplied were his property
20. WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,
DRAWING, ORDERS ETC.
The contractor shall execute the whole and every part of work in the most
substantial and workman like manner and both as regarding materials and in
every other respect in strict accordance with the specification. The contractor
shall also confirm exactly, fully and faithfully to the designs, drawings and
instructions in writing relating to the work signed by the Engineer-in-charge
and lodged in his office and to which the contractor shall be entitled to have
access for the purpose of inspection at such office, or on the site of the work
during office hours and the contractor shall, if he so requires, be entitled at his
own expense to make or cause to be made copies of the specification and of all
such designs, drawings and instructions as aforesaid.
21. ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE
The Executive Engineer shall have powers to make any alterations, or additions
to the original specification, designs and instructions that may appear to him to
EW- 269 PUR-F-006 RFQ-75871
be necessary or advisable during the progress of the work and the contractor
shall be bound to carry out the work in accordance with any instruction in this
connection which may be given to him in writing, signed by the Engineer-in-
charge and such alterations shall not invalidate the contract. Any additional
work which the contractor may be directed to do in the manner above specified
as part of the work shall be carried out by the contractor on same conditions in
all respect on which he agreed to do the main works and at the same rates as
are specified in the tender for the main work.
Where, however, the work is to be executed according to the designs, drawings
and the specifications recommended by the contractor and accepted by the
competent authority, the alteration above referred to shall be within the scope
of such designs, drawings and specifications appended to the tender.
22. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF
RATE OF THE CORPORATION
If the additional and altered work includes any class of work for which no rate
is specified in this contract, then such class of work shall be carried out at the
rates entered in the Schedule of Rates of the Corporation or at the rate
mutually agreed upon between the Executive Engineer and the Contractor,
whichever are lower. If the additional or altered work for which no rate is
entered in the Schedule of Rates of the Division is ordered to be carried out
before the rates agreed upon then the contractor within seven days of date of
receipt by him of the order to carry out the work should inform the Executive
Engineer for the rate which it is his intention to charge for such class of work
and if the Executive Engineer does not agree to this rate, he shall be noticed in
writing, be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider advisable provided
always that if the rates shall have been determined as lastly herein before
mentioned then in such case he shall only be entitled to be paid in respect of
the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Executive Engineer in the event of disputes, the decision of the
General Manager of the Corporation will be final.
23. EXTENSION OF TIME LIMIT IN CONSEQUENCE OF ADDITION OR
ALTERATION
The time limit for the work shall be extended in the proportion that the increase
in its cost occasioned by alterations or additions bears to the cost of the
original contract work and the certificate of the Engineer-in-charge as to such
proportions shall be conclusive.
24. NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK
TO BE CARRIED OUT
If at any time, after the execution of the contract documents, the Engineer-in-
charge shall, for any reason whatsoever, requires the whole or any part of the
work, as specified in the tender, to be stopped for any period or shall not
require the whole or part of the work to be carried out at all or to be carried out
by the contractor, he shall give notice in writing of the fact to the contractor
who shall thereupon suspend or stop the work totally or partially as the case
may be in any such case, except as provided here under. The contractor shall
have no claim to any payment or compensation whatsoever on account of any
loss in profit or advantage which he might have derived from the execution, of
the work in full but which he did not so derive in consequence of the full
amount of work not having been carried out or on account of any loss that he
may be put to on account of materials purchased or agree to be purchased or
for unemployment of labour recruited by him. He shall not also have any claim
for compensation by reason of any alterations having been made in the original
specification, drawings, designs and instructions which may involve any
curtailment of the work as originally contemplated. Where, however, materials
have already been purchased or agreed to be purchased by the contractor
before receipt by him of said notice, the Executive Engineer provided they are
not in excess or requirement and are of approved quality and/or shall be
compensated for the loss, if any, that he may put to in respect of materials
agreed to be purchased by him. The amount of such compensation to be
EW- 269 PUR-F-006 RFQ-75871
determined by the Executive Engineer, whose decision shall be final. If the
contractor suffers any loss on account of his having to pay, his labour charges
during the period, during which the stoppage of work has been ordered under
this clause the contractor shall on application be entitled to such compensation
on account of labour charges as the Executive Engineer whose decision shall be
final, may consider reasonable provided that the contractor shall not be entitled
to any compensation on account of labour charges if, in the opinion of the
Executive Engineer, the labour could have been employed by the contractor
elsewhere for the whole or part of the period during which the stoppage of the
work has been ordered as aforesaid.
25. NO CLAIM FOR COMPENSATION ON ACCOUNT OF LOSS DUE TO
DELAY IN SUPPLY OF MATERIALS BY CORPORATION
The contractor shall not be entitled to claim any compensation from
Corporation for the loss suffered by him on account of delay by Corporation in
the supply of materials entered in Schedule A where such delay is caused by:
Difficulties relating to supply of railway wagons.
Force Majeure
Act of God
Any other reasonable cause beyond the control of Corporation, including
shortage of materials to be supplied by the Corporation and difficulties in time
by reaching at the site of any materials equipment.
In the case of such delay in the supply of materials, Corporation shall grant
such extension of time for the completion of the works as shall appear to the
Executive Engineer to be reasonable in accordance with the circumstances of
the case. The decision of the Executive Engineer as to the extension of time
shall be accepted as final by the contractor.
26. TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any
compensation from Corporation on any account unless the contractor has
claimed in writing to the Executive Engineer within one month of the cause
27. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK
If at any time, before the security deposit is refunded to the contractor, it shall
appear to the Executive Engineer or his subordinate in charge of the work that
any work has been executed with unsound, imperfect or unskillful
workmanship or with materials of inferior quality or that any materials or
articles provided by him for the execution of the work are unsound or of
inferior quality to that contract for or are otherwise not in accordance with the
contract, it shall be lawful for Engineer-in-charge to intimate this fact in writing
to the contractor and then notwithstanding the fact that the work, materials, or
articles complained of, may have been inadvertently passed, certified and paid
for, the contractor shall be bound forthwith to rectify or remove and reconstruct
the work so specified in whole or any part, as the case may require or if so
required shall remove the materials or articles so specified and provided other
suitable materials or articles at his own charge and cost, and in the event of his
failing to do so within a period to be specified by the Engineer-in-charge in the
written intimation aforesaid the contractor shall be liable to pay compensation
at the rate of one percent on the amount of the estimate for every day not
exceeding ten days during which the failure so continues and in the event of
any such failure as aforesaid, the Engineer-in-charge may rectify or remove or
re-execute the work or remove and replace the materials or articles complained
of, as the case may be, at the risk and expense in all respects of contractor
should the Engineer-in-charge consider that any such inferior work or
materials as described above may be accepted, or made use of, it shall be
within his discretion to accept the same as such reduced rates as he may fix
Provided that in the case of any work of which visible check is not possible if
the Engineer-in-charge or his subordinate in charge of the work feels that such
work has been executed with unsound, imperfect or unskillful workmanship or
with materials of inferior quality, he shall take sample tests at random, cost of
which shall have to be borne by the contractor and if after taking such test part
EW- 269 PUR-F-006 RFQ-75871
of such work is found to be defective in any respect or to have been executed
with materials of inferior quality then the contractor shall pay for the whole
work such amount as may be fixed by the office of the Engineer-in-charge on
the basis of the lowest quality of work found by him in such sample tests.
28. WORK TO BE OPENED TO INSPECTION, CONTRACTOR OR
RESPONSIBLE AGENT TO BE PRESENT.
All works under execution or in pursuance of the contract shall at all times be
open to the inspection and supervision of the Executive Engineer and his
subordinate and contractor shall at all times, during the usual working hours
and at all other times at which reasonable notice of the intention of the
Executive Engineer or his subordinate to visit the works shall have been given
to the contractor, during which period either he should be present to receive
order and instruction, or have a responsible agent duly authorized agent shall
be considered to have the same force and effect as if they had been given to the
contractor himself.
29. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days’ notice in writing to the
Executive Engineer or his subordinate in charge of the work, before covering up
or otherwise placing beyond the reach of measurement of any work, in order
that the same may be measured and correct dimensions thereof, taken before
the same is so covered up or placed beyond the reach of measurement and
shall not be covered up or placed beyond the reach of measurement and work
without the consent in writing of Executive Engineer or his Subordinate in
charge of work. If any work shall be covered up or placed beyond the reach
without such notice having been given or consent obtained, the same shall be
uncovered at the contractor’s expense and in default thereof no payment or
allowance shall be made for such work or for the materials with which the same
was executed.
30. CONTRACTOR’S LIABILITIES
The contractor shall supply, at his own cost, all materials (except such special
materials, if any as may be supplied from the Corporation stored in accordance
with the contract). Plant, tools, appliances, implements, ladders, cordage,
tackle, scaffolding and any temporary works which may be required for the
proper execution of the work, in the original, altered or substituted form and
whether included in the specification and other document forming part of the
contract or referred to in these conditions or not and which may be necessary
for the purpose of satisfying and complying with the requirements of the
Engineer-in-charge as to any matter on which under these conditions, he is
entitled to be satisfied or which he is entitled to require together with carriage
thereof to and from the work. The contractor shall also supply without any
charge the requisite number of persons of setting out works and counting,
weighting and assisting in the measurement of examination at the time and
from time to time of the work or materials, failing this the same may be
provided by the Engineer-in-charge at the expenses of the contractor and the
expenses may be deducted from any money due to the contractor under the
contract or from his security deposit or the proceeds of sale thereof or of a
sufficient portion thereof, the contractor shall provide all necessary fencing and
light required to protect the public from accident and shall also be bound to
bear expenses of defense of every suit, action or other legal proceedings of law
that may be brought by any person for injury sustained. Owing to neglecting of
the above precautions and to pay any damage and cost which may be awarded
in such suit, action or proceedings to any such person or which may with the
consent of the contractor be paid in comprising any claim by any such person.
31. CONTRACTOR LIABLE FOR ALL DAMAGE
Compensation for all damage done intentionally or unintentionally by
contractor’s laborer, whether in or beyond the limit of Corporation’s property,
shall be estimated by the Executive Engineer or such other office as he may
appoint and the estimates of the Executive Engineer, subject to the decision of
the Superintending Engineer, on appeal, shall be final and the contractor shall
be bound to pay the amount of the assessed compensation demand, failing
which, the same will be recovered from the contractor as damages or deducted
EW- 269 PUR-F-006 RFQ-75871
by the Engineer-in-charge from any sums that may be due to or become due
from Corporation to the contractor under this contract or otherwise.
The contactor shall bear the expenses of defending any action or other legal
proceeding that may be brought by any person for injury sustained by him owing
to negligence of precautions for prevent the spread of fire and he shall also pay
any damage and cost that may be awarded by the court, if in consequence
32. RESCISSION OF CONTRACT AND FORFEITURE OF DEPOSIT
The contractor shall not assign or sublet, without the written approval of the
Engineer-in-charge and if the contractor assign, or sublet his contract, or
attempt to do so or become insolvent or commence any proceedings to be
adjudicated as insolvent or make any composition with creditors, attempt to do
so, the Engineer-in-charge may, by notice in writing rescind the contract. Also, if
any bribe, gratuity, gift, loan, perquisite, reward or advantage pecuniary or
otherwise shall either directly or indirectly be given, promised or offered by the
contractor or any of his servants, or agents, or any person to the employee of the
Corporation in any way relating to his office or indirectly interested in the
contract, the Executive Engineer may, by ten days’ notice in writing, rescind the
contract. In the event of a contract being rescinded the security deposit of the
contractor shall there upon stand forfeited and be absolutely at the disposal of
the Corporation and the same consequences shall ensure as if the contract has
been rescinded under Clause 11 thereof and in addition the contractor shall not
be entitled to recover or be paid for any work thereof actually performed under
the contract.
33. COMPENSATION
All sums payable by a contractor by way of compensation under any of these
conditions shall be considered as a reasonable compensation to be applied to the
use of Corporation without reference to the actual loss or damage sustained and
whether any damage has not been sustained.
34. CHANGE IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In case of tender by partners of a Firm, any change in constitution of firm shall
be forthwith notified by the contractor to the Executive Engineer for his
information.
35. WORKS UNDER DIRECTION OF SUPERINTENDING ENGINEER
All works to be executed under the contract shall be executed under the
direction and subject to the approval of Superintending Engineer /Engineer-in-
charge for the time being who shall be entitled to direct at what point or points
and in what manner they are to be commenced and from time to time to be
carried on.
36. DECISION OF SUPERINTENDING ENGINEER TO BE FINAL
Except where otherwise specified in contract and subject to the power delegated
to him by Corporation under the Corporation’s rules, then in force, the decision
of the Superintending Engineer/EIC for the time being shall be final, conclusive
and binding on all the specifications, designs, drawings and instructions herein
before mentioned and as to the quality of workmanship or material used on or as
to any other question, claim, right matter or thing whatsoever in any way arising
out of or relating to the contract, designs, drawings, specifications, estimates,
instructions, orders or these conditions or otherwise concerning, the works or
the execution or failure to execute the same, whether arising during the progress
of the work or after the completion or abandonment thereof.
37. Dispute Resolution Mechanism: For works contracts and composite
Contracts, the arbitration mechanism shall be governed by the Gujarat Public
Works Contracts Disputes Arbitration Tribunal Act, 1992 as per below details.
sub clause 37(1) Amicable Settlement : Any dispute, difference, controversy
or claim between the Parties arising out of or relating to this contract with
reference to the construction, interpretation, breach, termination or validity
thereof (hereinafter referred as "the Dispute") shall, upon the written request of
either Party be referred to the authorized representatives of the Disputing
Parties for resolution. The authorized representatives shall promptly meet and
attempt to negotiate in good faith a resolution of the Dispute within thirty days
of the service of the request.
sub clause 37(2) Arbitration : If the Parties fail to amicably resolve the
EW- 269 PUR-F-006 RFQ-75871
disputes or differences or contrary claims as indicated herewith in sub clause
(1) of Clause 37 arising under or in connection with the present works
contracts, whether pertaining to works contracts alone or works and
procurement both, the same shall be referred to arbitration under the Gujarat
Public Works Contracts Disputes Arbitration Tribunal Act, 1992."
38. STORES TO BE OBTAINED FROM CORPORATION [APPLICABLE ONLY
WHERE MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED
IN SCHEDULE A]
The contractor shall obtain from the Corporation stores, such articles as are
mentioned in schedule “A” which may be required for the work or any part of
the work or in making up any articles required therefore or in connection
therewith, unless he has obtained permission in writing from the Executive
Engineer or obtained such stores and articles from elsewhere. The value of
such stores and articles as may be supplied to the contractor by the Engineer-
in-charge will be debited to the contractor in his account at the rate shown in
the schedule “A” attached to the contract and if they are not entered in said
Schedule, they shall be debited to him at cost price which for the purpose of
this contract shall include cost of carriage and all other expenses whatsoever
which may have to be incurred in obtaining delivery of the same at the stores
aforesaid and further overhead charges 15%.
The Contractor shall be responsible for the loss, destruction or deterioration of
the materials, stores or articles supplied to him by the Corporation, even if
such loss, destruction or deterioration has occurred under any circumstances
whatsoever beyond his control as if the materials, stores or articles so supplied
were his property. The contractor shall be responsible for returning the residual
materials after completion of the contract and it fails to return, the balance
materials supplied to him by the Corporation, the cost of the residual materials
will be recovered from the contractor at the market rate or stock issue rate
whichever be higher at the time of materials account plus 15%.
39. LUMP SUMS IN ESTIMATE
When the estimate on which tender is made, includes lump sums in respect of
parts of the works the contractor shall be entitled to payment in respect of the
items of works involved or the part of the work in question at the same rates as
are payable under this contract or such items or if the part of work in question
is not in the opinion of the Engineer-in-charge capable of measurement the
Engineer-in-charge may at his discretion pay the lump sum amount entered in
the estimate and the certificate in writing of the Engineer shall be final and
conclusive against the contractor with regard to any sum or sums payable to
him under the provision of this clause.
40. LUMP SUM TENDERS
Whenever lump sum tenders have been invited for buildings or other structures
of the same type, design, the contractor shall submit his bill stated in Clause
No. 18 and the Engineer-in-charge not below the rank of work, Executive
Engineer shall certify by general measurement or by other method considered
suitable to him, the value of work done and the contractor shall be paid
monthly a sum equal to 90% of the total value the work so certified, since the
last payment, after deducting a part or whole of the secured advance if not
already paid for the materials utilized on the works. An additional secured
advance for any fresh materials utilized on the works. An additional secured
advance for any fresh materials brought on site will also be paid if certified by
the officer not below the rank of Executive Engineer. After the work is
completed final bill would be paid on the certification of officer not below the
rank of Executive Engineer, that the work, is done according to drawing and
specifications attached to the tender. If any additions and alterations have been
carried out, detailed measurement in respect thereof shall be recorded and
extra payment or deductions are regulated as per item rates quoted by the
contractor while submitting the tender and if there are any items in the
additions and alterations for which the contractor has not quoted a rate, the
payment shall be as per Clause 39 above
41. ACTION WHERE NO SPECIFICATION
EW- 269 PUR-F-006 RFQ-75871
In the case of any class of work for which there is no such specification as is
mentioned, such work shall be carried out in accordance with the PWD and in
the event of there being no PWD specification, the work shall be carried out in
all respects in accordance with the instructions and requirements of the
Engineer-in-charge of the Corporation etc.
42. NO CLAIM FOR VARIATION IN QUANTITIES OR WORK
Quantities shown in the tender are approximate and no claim shall be
entertained for quantities of work actually executed, being either more or less
up to any extent than those entered in the tender or less than those entered in
the tender or estimate.
43. NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING WORK
No compensation shall be allowed for any delay caused into starting of work on
account of acquisition of land and in the case of clearance for works or any
delay in according sanction to estimates.
44. NO CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delays in execution of the work on
account of water standing in borrow pits or compartment. The rates are
inclusive for hard or cracked soil, excavation in mud, sub-soil water or water
standing in borrow pits and no claim for any extra rate shall be entertained
unless otherwise expressly specified and mentioned in the tender.
45. EMPLOYMENT OF TECHNICAL PERSONS:
The contractor shall keep one full time qualified Civil Engineer at the site, who
shall be fully authorized to receive and comply with such instructions, as given
by the Executive Engineer. The contractor shall intimate the name of such
Engineer with his qualifications and experience. The Executive Engineer shall
have the right to demand the removal of any technical personnel, skilled or
unskilled workmen, who in his opinion are considered to cause bad
workmanship in the execution of works or to cause indiscipline.
46. INDUSTRIAL LABOUR LAWS
Terms and Conditions regarding Labour L a w s
During the entire period of the contract, the Contractor and his Sub-m Contractor shall
at all times comply with all applicable labour laws, rules, regulations, notifications, and
bye-laws issued by the Central Government, State Government, or Local Authorities.
This includes all existing laws as well as any amendments or new notifications that may
come into force during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the following Act /
statutes related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment &
Conditions of Service) Act, 1996;
5. ESI Act,
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Acq 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen's Compensation Act, 1923;
11. lD Act, 1947;
12. Maternity Benefit Act, 1961 ;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of Service)
14. The Building And Other Construction Workers' Welfare Cess Act,
17. The Carriage by Road Act,2007.
The above list is only indicative and not exhaustive. The Contractor shall remain fully
responsible for ensuring compliance with all other applicable labour and welfare
EW- 269 PUR-F-006 RFQ-75871
legislations, rules, and regulations in force during the contract.
The following are some of the major responsibilities of the contractor, in addition to
other obligations prescribed under various labour laws, rules, and regulations issued by
statutory authorities such as the State Government or Government of India from time
to time, which the contractor shall strictly comply with during the execution of the
1) The Factories Act,
The conhactor should not deploy worker below the age of 18 years and above 60 years
for the awarded work.
Earn Leave shall be paid to their bonafide contract workers as per the provisions of the
Factories Act,
Payment of Earned Leave should be made monthly together with wages for better
compliances of law. The contactor shall maintain Earn leave Register in Form No. 19 as
per the provisions of the said Act and submit the same on demand.
All the written registers, Performa etc. shall be maintained up to date and kept ready
for inspection at any time or submitted on-time to the concerned authorities as per
applicability of the Acts by contractor.
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under Contract Labour
(Regulation & Abolition) Act from the appropriate authorities before commencement of
work. The contract tor shall maintain a valid labour license under the Contract Labour
(Regulation and Abolition) Act for employing necessary man power to be required by
contractor.
The contractor should not be allowed to engage fifty (50) or more contract labourers
without initiating to obtain the labour license under the Contract Labour Act. (the said
number i.e., fifty (50) or more includes Supervisor and other staff).
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours engaged
by them, on or before 7th of every month through nearest Nationalized Bank
compulsory, preferably situated in the premises of TPS area in case of all works
contract. The Contractor shall supply copy of Bank Statement duly stamped by the
Concerned Bank as well as debited entry of amount displayed in the contractors' own
bank account as token of proof towards payment of Wages through CLIM/prevailing
system at relevant time.
Apart from Payment of wages through Bank, Contractors shall have to make all other
payments like Advances, Bonus, Leave Encashment etc. to their labours through bank
only and cash payment / entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and conditions of the
license. The contractor shall have to pay wages to workers as notified by the
Government of Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and deprived of their
right to minimum wages payment on or before 7th of each month shall be dealt as per
the provision of labour laws. Recurrence of the same may lead to cancellation of
awarded contract.
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm /Agency
/Company itself for the subject work.
It should be ensured that all the contract labours engaged by contractor are covered
under the provident fund scheme and employee's pension scheme and their
EW- 269 PUR-F-006 RFQ-75871
contribution must be remitted regularly to the concemed RPFC. The photocopies of
challan along with ECR in this regards should be submitted regularly to the User
Department to enable their onward billing clearance.
The contractor shall submit along with his bill (month wise) statement regarding
deductions against employees' provident fund and family pension scheme in respect of
each concerned employee' Provident fund and family pension scheme at the rate of
%o of wages (or at the rates made applicable by the Government time to time). The
contractor's contribution and his workers contribution towards provident fund and
family pension scheme shall deposited by the contractor with concerned PF Authorities.
5) Workmen's Compensation & Employer's Liability Insurance.
The contractors shall have to obtain Employee Compensation Policy under the
Employees Compensation A ct before starting the work. Employee Compensation
Insurance shall be obtained for all the workers engaged for the execution of awarded
contract. If any of the work is sub-letted the contractor shall ensure that the sub
contractor take and provide workmen's compensation and Employer's liability insurance
for the labours engaged. Contract tor is liable to pay compensation in case of accidental
injury arising or.t of and in the course of employment as per the said Act and shall bear
medical expenses due to on duty accident.
6) The Payment of Gratuity Act,
For better compliance, contractor shall pay amount of gratuity on a monthly basis along
with the payment of wages, calculated on a pro-rata basis per month, which is
equivalent to 15 days' wages for each completed year of service for every worker. (*
applicable to ARC / BRC works contract only).
7)The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contractor in an accounting year,
bonus, in accordance with the provisions of this Act, For better compliance, the
contractor should pay bonus amount on a monthly basis along with wages calculated on
a pro-rata basis per month. Contractor has to submit the paid bonus details of its
worker in Form No. C as per the provisions of the said Act as and when required by the
Govt. Authority as well as by GSECL.
8)The maternity Benefit Act,
Contractor shall ensure that entitled female worker should provide Maternity Leave and
other benefits as per the provision of the said Act.
9)The Building and other Construction Workers' Act,
For any construction work, fall under the definition of Section 2(1Xd), happening
outside / inside the Factory premises the said act will be applicable and the contractor
or its sub-contractor shall be liable to comply with the provisions framed there under.
10) The contractor shall give preference to existing or local contract workers for
engagement in the awarded contract and shall issue appointment orders to each and
every workers individually at the time of their engagement during the period of contract
and terminate the same at the end of the each contract.
Follow the mentioned procedure at each milestone for the execution of works contract.
11) On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour Welfare Officer /
Industrial Relations Officer for all formalities related to labour law compliance before
commencement of the contract and onward Labour Law compliance thereof, so that
later no dispute will arise in respect of compliance of labour laws.
2. It is the responsibility of the contractor to ensure that contractor's employees
maintain strict discipline as regards security, methods of safe working etc, and not to
cause any hindrance to smooth running of power station or in execution of duties by
EW- 269 PUR-F-006 RFQ-75871
GSECL staff Any lapse in this regard will be viewed seriously and if lapse found, contact
is liable to be terminated. If any of contractor's staff is found unsuitable or not behaving
properly, the contractor shall have to remove such worker from the work-site on
demand by EIC. To maintain harmonious industrial relations amongst contact labours is
solely the responsibility of contrac tor. Any breach of the same will be viewed seriously.
3. A digital system developed at the request of the agencies working at the premises of
GSECL, is to facilitate them for easy, efficient, effective management of data, gate
passes, attendances, medical records, Police Verification documents etc related to their
employees / workers deployed for various works and services against work order of
4. On receipt of LOA and before commencement of work, authorized representatives of
the agency shall login in the CLIMS online portal / prevailing system at relevant time
and apply for registration of their employees / workers uploading all information with
required documents in digital form. Upon completion of due verifications, clearance by
EIC and HR departments, contracting agency will obtain gate passes. GSECL will only
consider documents like wage sheet duly accepted and signed by individual workers, as
per the engagement/deployment duration/hours of individual worker duly certified by
the agency, being the employer, for the purpose of payment of bills and HR clearances.
Agency shall be solely responsible for maintaining accurate and upto- date data of their
workers in the portal/ prevailing system at relevant time. All statutory compliances
under prevailing laws shall remain the responsibility of the contracting agency. The
agency shall indemnit/ GSECL against any liabilities arising from noncompliance of legal
provisions or inaccuracies in the data maintained by them in the digital portal of
CllMS/prevailing system at relevant time.
5. The Contractor who intends to engage labours more than the specified limit under
law, then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 or Form
No. VI under the Interstate Migrant worker (employment regulation) Act 1979 as
applicable is to be obtained for the purpose of obtaining labour License from the
Licensing Authority.
6. It shall be the duty of the Contractor or his Supervisor to ensure Bio-Metric punching
and reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff at site for daily
supervision and for maintaining of various registers and records required under the
Labour laws and contracts. No payment for such supervision shall be admissible.
8. The gate passes obtained for any specific work order will be valid for that specific
work order only and contractor should not divert the man power for any other work
order. If any work or part thereof is desired/required to sublet, the contactor shall
obtain the necessary permission of EIC in black and white well in advance which is
mandatory for considering the statutory documents of agency other than the agency
who awarded work order.
12) During Contractual Work under the progress:
1. All C-ontrac tors shall have to make the payment of wages to the Contract Labours
engaged by them, on or before 7th of every month through Nearest Nationalized Bank
compulsory, preferably situated in the premises of power station area.
The Contractor shall supply copy of Bank Statement duly stamped by the Concerned
Bank as a token of proof towards payment of Wages through CLIMS i prevailing system
at relevant time.
2. All C-ontra c tors has to comply & maintain statutory documents /registers under the
provision of labour laws & EPF Act.
3. In case the contractor having more than one contract in the same TPS, the
contractor shall have to obtain work order wise separate Gate Passes and submit the
same with the documents of statutory compliance that too work order wise every
EW- 269 PUR-F-006 RFQ-75871
month to the User Department to enable their onward billing clearance.
(13) CONTRACTOR TO INDEMNIFY THE GSECL REGARDING LABOUR LAWS
The contractor shall indemnify and keep indemnified the GSECL, and every member,
officer and employees of the GSECL, also Engineer-in-charge and his staff against all
actions, proceedings, claims, demands, costs and expenses whatsoever arising out of or
in connection with the matter referred in above clauses and elsewhere and against all
actions, claims demands, cost and expenses which may be made against the GSECL by
any workman/ employees of contractor or any sub- contractor and or from any liability
any wise to any workman/employees of the contractor or sub-contractor under any
laws, rules or regulation having in force of law including but not limited to claims
against the owner under employee compensation Act, 1923. The Employee's Provident
Fund Act.l952, and/or the contract labour (Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any accident or
injury to any workmen or other person in the employment of the contractor or his sub-
contractor, and the contractor shall indemnify and keep indemnified the GSECL against
all such damage and compensation and against all claims, demands proceedings costs,
charges and expenses whatsoever in respect of or in relation thereto.
The contractor shall at his own expense / risk and cost to comply with all the labour
laws as above-mentioned and keep the G.S.E.C.L. indemnified in respect thereof.
GSECL : shall be entitled /empowered to deduct directly from the bills, the amount to
be paid to engaged bonafide contract workers or the contract workers engaged by Sub-
contractor any sum or sums payable by main contractor / sub-contractor and which
sum/sums the Corporation is required to pay in capacity of Principal Employer on
account of the default of contractor in respect of all liabilities incurred out of
noncompliance regarding any provisions of Labour Laws and same amount shall be
recovered from the pending dues of the contractor with 15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are in force at present
and that may be famed by the G S E C L from time to time in connection with contracts
will be binding and acceptable to contractor.
The above are some of the major liabilities of the contractor in addition to other
liabilities prescribed under the various labour laws in force from time to time from
Statutory Authorities like State Government / Government of India, which the
contractor shall have to comply with.
The contractor shall provide the name of authorized representative, as provided to
other statutory Government authorities and will be notified to Engineer In-Charge time
14) Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under Labour Laws
and EPF in CLIMS / prevailing system at relevant time.
Required documents shall be uploaded by the contractor in existing portal /prevailing
system at relevant time invariably each month to Engineer In-Charge for onward
process and smooth clearance by HR Department.
List of documents required for gatepasses of contract workers through clims
/ prevailing system
Sr No Description of documents attached
01 Copy of Work Order
02 Copy of P. F. Code No.
03 Insurance Policy as per subject of work order under the Workmen
Compensation Act,1923
EW- 269 PUR-F-006 RFQ-75871
04 Contract agreements/ subletting work contract documents with approval
05 Copy of Id proof of Aadhar card or Election voting card or driving license or
Passport only
06 Copy of Police Verification in respect of each contract workers
15. The contractor whose work order value is above Rs. 5 lacs shall have to submit
"Declaration cum Indemnity Bond" on Rs. 300/- Non-Judicial stamp paper in prescribed
Performa (Annexure- "B") with Agreement and Indemnity Bond before the
commencement of the contract.
Annexure- “B"
DECLARATION CUM INDEMNITY BOND
( On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at…………………….(mention location) by
M/S……………………………. having its Reg. Office at ……………………………………………………………………
(hereinafter referred to as "Contractor" which expression shall unless it be repugnant to the
context or meaning thereof, be deemed to mean and include their respective assigns, successors,
executors, subcontractors and / or administrators) of the ONE PART in favour of
M/S Gujarat State Electricity Corporation Limited having its power Station at
.......................Therma1 Power Station (hereinaffer referred to as the "Company" ), which
expression shall unless it be repugnant to the context or meaning thereof be deemed to mean and
include its assigns, successors) of the OTHER PART.
WHEREAS the COMPANY has entered into a contract with the Contractor for the work of
under order No: …………………………………..dated…………………….”hereinafter called the "Contract");
AND WHEREAS it is one of the essential conditions of the Contract that the Contractor shall
comply with all the provisions of the Labour & Industrial Laws, as may be applicable from time to
time for the discharge and completion of the works and completion of the Works and Services
covered under said Contract Labour (R & A) Act 1970, Child Labour (Prohibition and Regulation) Act
1986, The Employees Provident Funds & Miscellaneous Provisions Act,1952, Employees State
Insurance Act 1948, Minimum Wages Act,1948, Payment of Bonus Act,l965,Payment of Wages
Acl,1936, Employees Compensation Act.1923, Factories Act,1948 and other Labour Laws, Rules,
Notifications and Codes which are at present applicable to the contractor and which may be
applicable during the tenure of the contract (hereinater referred as the 'Laws').
AND WHEREAS the Contractor has agreed to execute this Declaration cum Indemnity Bond to this
effect and has agreed to indemnify and Company, it's D ire c tors, Officers and employees and
representatives indemnified and hold harmless against all third party claims, charges ,penalties,
fines, expenses ,losses, damages costs, suits or any other levy against the Company and/or the
management due to the failure of the Contractor to observe or follow all applicable laws.
NOWTHIS DEED WITNESSETH AS UNDER
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse, delays,
misdeeds, faults, breaches, inactions etc done by his assigns, successors, executors, subcontractor
and / or administrators shall be construed to be have been done by the contractor and he alone
shall be liable for such acts, inactions etc.
EW- 269 PUR-F-006 RFQ-75871
2. In consideration of the Company awarding the Contract to the Contractor subject to the condition
of execution of this Declaration cum Indemnity bon{ the Contractor declares and represents to the
Company that the Contractor has obtained all Statutory registrations, Certificates, licenses and
approvals required under the Laws enabling the Contra ctor to execute the Contract in a legal and
lawful manner.
3. That in the event of any liability arising out of non-compliance of any 'Laws' of the land by the
Contractor in connection with the Performance of the contract the Contractor shall bear all the
resultant liability (ies) whatsoever, if any and that the company , its Directors, Officers and
employees, representatives, shall not be liable for any such liability(ies). The Contactor undertakes
to indemnify and keep the Company and its Directors, Officers and employees, representatives
indemnifies, defend and hold harmless, against all losses, costs, damages, claims, penalties,
interest, expenses, demands, fines, legal liability, causes of action, injury to persons, suits etc.,
which may be suffered, incurred, undergone and / sustained by the Company including the Costs
and expenses that may be incurred in defending any such liability(ies) claim(S), Proceeding ( S) etc.
that maybe made or taken or taken or arise on the same by any Person, body, authority,
government, judicial / quasi - judicial authority due to the failure or non-compliance of any such
laws and rules there under (including any amendments in acts, laws, statutes & rules there under)
of whatsoever kind and nature arising out of or in any way connected with, whether or not such
acts or omissions are actual or alleged, active or passive with regard to the discharge of the said
4. The Contractor further declares that in case of any suit / claim/ right / damages / compensation /
fine / levy / charges / expenses / losses / penalties / costs raised by the third party, including
contract labours engaged by the contractor, he shall join such proceedings in such
Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss, damage, claims, suits,
demands, decrees, expenses that the Company may suffer to the fullest satisfaction of the
Company and if the Contractor fails to make good the same then the Company shall have the right
to recover the same from and or any other loss sustained, without any restriction or limitation,
together with any
other incidental expenses, costs, and all incidental logistic expenses etc that may be suffered by the
Company from the Contractor and the Contractor hereby further confirms and declares that this
Declaration cum Indemnity Bond is irrevocable and shall be final and binding on him, his heirs,
executors, administrators, legal representatives, successors, subcontractors and assigns, wherever
the context applies. any claims, demands, shall be adjusted against any amount due and payable to
the Contractor and the Company shall have the right to withhold any amounts due and payable to
Contractor, till the settlement of such claims, disputes to the Contractor towards discharge of such
claims, obligations etc.
This Declaration cum indemnity bond shall be in accordance with the laws of India and any dispute
between the parties with regard to this Declaration cum Indemnity Bond shall be resolved through
the dispute resolution process mentioned in the General Conditions of the Contract (GCC).
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and year first
hereinabove written.
SIGNED SEALED AND DELIVERED By the within named *CONTRACTOR"
(Authorised Signatory)
Rubber Stamp of Firm/Company
Full Name:
Designation:
EW- 269 PUR-F-006 RFQ-75871
In presence of Witness
Name & Address of Witness Signature
1. Full Name :
Residential Address:
Contact No. :
2. Full Name :
Residential Address:
Contact No. :
47.MATTERS RELATED TO EXECUTION OF WORK:
a) Work shall commence from the date given in letter to commence the work by
EIC at site. The Contractor shall make all necessary arrangements at site to
mobilize labour, operators, divers and materials and maintain necessary
number of machinery and equipment, barge, pontoons etc., to guarantee the
agreed rate of progress of work as per schedule.
b) A detailed work schedule showing how he proposes to carry out the work,
specifically mentioning time periods as well as date of commencement and
completion of each activity and such approved schedules must be strictly
adhered to by the CONTRACTOR. After the owner has agreed with the
schedule, the Contractor shall prepare detailed program of each work
front/activity breaking it down giving daily quantifiable/measure of progress.
The schedules are to be reviewed periodically with the OWNER / ENGINEER to
ensure that the completion date will be met or to institute corrective steps (at no
extra cost to the ENGINEER) to adhere to the completion dates. The OWNER
reserves the right to revise the schedule at his discretion in order to keep up to
the completion date and to suit the project requirement and such alterations
shall not entitle the CONTRACTOR to any extra payment.
c) A work schedule with PERT / Bar Chart for carrying out the work in
prescribed time limit mentioning date of commencement, activity to be carried
with its time period, starting & finishing event for each activity, completion of
total project in critical path etc, shall be jointly fixed and approved by the
GSECL. Such approved schedules must be strictly adhered by the Contractor.
d) After the GSECL has agreed with the schedule, the Contractor shall prepare
detailed program of each work front / activity breaking it down to daily
quantifiable measure of progress. The schedules are to be reviewed periodically
with the Owner / E.I.C to ensure that the completion date will be met or to
institute corrective steps (at no extra cost to the GSECL) to adhere to the
completion dates. The Owner reserves the right to revise the schedule at his
discretion in order to keep up to the completion date and to suit the project
requirement and such alterations shall not entitle the Contractor to any extra
e) The GSECL reserves the right to delete any item of schedule-B for which
contractor shall not have any right to claim on this account.
f) One permanent reference bench mark and a reference base line shall be given
for lay out of work, which shall be maintained without disturbance by the
CONTRACTOR during the tenure of the contract. CONTRACTOR shall establish
local bench marks as directed by the ENGINEER IN CHARGE.
g) The contract or any part thereof shall not be subject to change without the
written permission of the Chief Engineer (Gen.) GSECL, GANDHINAGAR TPS
or his authorized representatives.
h) During the execution of the work if it is found that the work is not progressing
as per the scheduled program approved by the GSECL & planned by the
contractor, due to the reasons attributable to the contractor, suitable action
shall be taken as per Clauses in this tender elsewhere & other relevant clauses
appearing in the section of “Terms & condition of tender & works contract, Legal
conditions of works contract” of tender document. And the GSECL may also
take such action as it may deem fit to ensure that the work is completed in time
at Risk and Cost of the contractor.
EW- 269 PUR-F-006 RFQ-75871
i) Contractor shall attend meetings at EIC's office at site or any other place as
fixed by the EIC, as and when required for review, discussion, coordination etc.
Attending these meetings shall be obligatory on the part of the Contractor, at no
cost to the GSECL.
j) The Contractor shall take all requisite & necessary care to observe that no
damage is caused to the existing, pumps, existing works, service road, or any
other structure etc. For any damage to the existing structures of the GSECL,
the Contractor shall be held responsible and he will have to rectify the damage
immediately up to the satisfaction of Engineer in Charge, at his own cost.
k) The work shall be completed within the period stipulated in the contract. & site
clearance arranged according to the progress of work at site. Therefore, the
contractor has to organize & coordinate the work to suit these circumstantial
conditions. In the event of any delay due to the above or due to any other
reason not attributable to the contractor, reasonable extension in completing
the work may be given at the discretion and as decided by the GSECL but no
compensation or idle charges will be payable to the contractor on this account
or any site conditions under any circumstances.
l) No idle charges shall be entertained by GSECL for any site condition or any
circumstances. The corporation will not pay any type of advances including
mobilization advance
48. RECOVERIES:
a) In case of any damage to equipment / machinery or structure / building of
GSECL or any public property due to negligence of contractor or any other
reasons attributed to contractor, the decision of E.I.C. regarding the amount of
recovery shall be final.
b) If the contractor fails to execute the work as per direction of E.I.C. within the
time frame given, the GSECL shall get the work done through any other
contractor at the risk and cost of the contractor and the cost of execution of
such work along with 15% overhead charges shall be deducted from
contractor’s monthly bill over and above recovery as per rules.
c) Recoveries due from the contractor, up to the end of the month previous to
the one in which the bill is prepared shall be made from bills approved for
payment every month or at other periods when the bills are prepared, for the
various items in the following order of priorities and extents.
d) Deduction on account of security deposit in full together with shortage, if any,
to be made good.
e) Penalty in full, if levied.
f) Expenditure, if any, incurred by the Corporation on Contractor’s behalf in
labour or materials in full.
g) Charges for services such as water and power supply etc. in full.
h) Charge on account of supply of materials like cement and steel in case of
shortages found in balance or excess consumption than specified.
i) Hire charges for Corporation or Government machinery if any.
j) Recoveries of advance and secured payment or payments for preliminary work
in full or the installment due if and as the same as may have been allowed.
k) Rent recovery on account of allotting quarters on rent as per Corporation’s
l) Income tax and sales tax in full as per Government rules.
m) Outstanding recoveries in respect of other contracts awarded by the
Corporation if any.
n) Other recoveries. (If any)
49. WORK TO BE EXECUTED TO THE SATISFACTION OF THE ENGINEER -
IN-CHARGE:
The contractor shall proceed with the work with diligence and expedition
and the whole of the work herein specified as well as the mode of execution
shall be under the supervision and direction and shall be carried on to the
entire satisfaction of the Engineer-in-charge, who shall have full power to
order the contractor to alter, enlarge or diminish the form, dimensions,
positions, or quantities of any of the work or to make use of material and
workman-ship of different descriptions and qualities from this herein
specified.
The whole of the works, together with any temporary works, associated
therewith, shall be carried on in the most substantial proper and mannered
EW- 269 PUR-F-006 RFQ-75871
workman like manner, with the best materials and workmanship and to the
entire satisfaction of the Engineer-in-charge and in such order of time as he
may direct. The contractor shall attend to and execute without delay all orders
and instruction which may from time to time be issued by the Engineer-in-
50. MATERIALS WORKMANSHIP etc.:
The work shall be executed in thoroughly substantial manner with material and
workmanship of best quality and strictly in accordance with the specifications
and with the drawings, or with such other drawings or written instruction as
may from time to time be furnished to the contractor, in accordance with terms
of this contract and shall be completed in every respect with all materials and
workmanship implied and necessary according to the fair interpretation and
meaning of the same and should there be any discrepancy between the
drawings and specifications or any difference or disputes as to the dimensions
to be worked to or the quality of the materials to be used, or the mode of doing
periodical quantity of the work to be executed or with respect to any subject
arising out of this contract, the decision of the Engineer-in-charge shall be final
and binding on all parties. Rejected material shall be so disposed off as to
obviate any possibility of their use on works. The place, method and period of
disposal shall be as directed by the Engineer-in-charge.
51. SAMPLES OF DESCRIPTIVE DATE:
Samples of descriptive date, requiring approval, shall be submitted by
contractor to the Engineer-in-charge in good time before the use of such
material for inspection and permission of testing if required. The samples shall
be properly marked to show the name of the material, manufacture, place of
origin, and place where to be used etc. Failure of any sample to pass specified
tests will be sufficient cause for the refusal to consider any further sample from
the same source.
52. FENCING AND LIGHTING AND VENTILATION
Except as herein after provided, the contractor shall unless otherwise specified,
be responsible for the proper fencing, guarding, lighting and taking of the
necessary safety measures for all works comprised in the contract and or the
proper provision of temporary roadway, footways, guards fences, caution
notices etc. as far as the same may be rendered necessary by reasons for the
work for the accommodation and protection of workman foot passenger or
other traffic and of the owners and occupiers of adjacent property and of the
public and shall remain responsible for any accidents that may occur on
account of his failure to take proper and timely precautions.
All the arrangements made for fencing, lighting and ventilation shall be
maintained by the contractor throughout the tendency of the contract till
physical taking over of the work by the department.
53. LIABILITY FOR DAMAGE TO WORKS OR PLANTS
The contractor shall during, the progress of the work, properly cover up and
protect the work, and plant, and materials placed at his disposal or
acquired for him by the Corporation, from injury by exposure to the
weather, or any cause what so ever and shall take every reasonable proper timely
and useful precaution against accident or injury to the same from any cause
and shall be and remain answerable and liable for all accidents, or injuries
thereto which until the same be or be deemed to be, taken over by the
Corporation, may arise or be occasioned by the acts or omissions of the
contractor or his workmen of sub-contractors, and all losses and damages
to the works or such plant or material arising from such accidents or injuries
as aforesaid shall be made good in the most complete and substantial manner by
and at the sole cost of the contractor and to the reasonable satisfaction of the
Engineer-in-charge. If the contractor fails to make good such losses & damages
within the time given by the Engineer-in-charge, the Corporation shall be at
liberty to recover the amount fixed by the Engineer-in-charge for such losses or
damages or any part thereof by deducting it from any sum due by the
Corporation to the contractor under this contract or otherwise.
Further the contractor shall, at all time, protect and preserve all materials, plant
and equipment that he may himself have procured for the execution of the work.
EW- 269 PUR-F-006 RFQ-75871
All reasonable requests of the Engineer-in-charge to enclose or especially protect
any of the above shall be expeditiously compiled with.
If the Engineer-in-charge considers that the work or materials or plant is not
sufficiently protected by the contractor, he shall be entitled to arrange for such
protection at his unfettered discretion and recover the cost thereof from the
contractor.
Until the work shall be or be deemed to be taken, over as aforesaid, the
contractor shall also be liable for and shall be deemed to have indemnified the
Corporation in respect of all damage or injury to any person or any property of
the Corporation or of others, occasioned by the negligence of the contractor or
his workmen, or his sub-contractor, or by defective design, work or
materials.
54.EXPLOSIVE PROCUREMENT AND STORAGE (IF APPLICABLE)
i) Explosives, petrol, oils, fuels and other inflammable materials shall be stored
strictly in accordance with the rule of the Explosive Department.
ii) The contractor shall at his own expense construct and maintain, proper
magazines which are required for the storage of explosive and arrange for proper
storage facilities for oils, fuels etc. for use in connection with the work.
iii) The contractor shall at his own expense obtain such license or licenses as may
be necessary for strong and using explosives, oils, fuels etc. The department shall
not take any responsibility whatsoever in connection with the storage or use of
explosives on the site, or any accident or occurrence whatsoever in connection
therewith. All operation of the contractor in which or for which Explosives are
employed shall be at risk of contractor and upon his own responsibility.
55. MATERIALS TOOLS AND PLANT BROUGHT ON THE SITE OF WORK
All materials, tools and tackle of the contractor brought to and delivered upon
the site for the purpose of the work shall from the time of their being so
brought shall be deemed to be the property of the Corporation in its possession
to be used for the purpose of the work and for that purpose only and shall not
on any account be removed or taken away by the contractor or any other
person without the written permission of the Engineer-in-charge but the
contractor shall nevertheless be solely liable and responsible for and loss
destruction thereof or damage thereto. The Corporation shall have a lien on
such materials, tools and tackle for any sum of sums which may at any time
prior to the completion of the works be due or owing to the Corporation by the
contractor, under in respect of and dispose of any such materials, tools and
tackle in such manner as the Corporation may think fit and to apply the
proceeding in or towards the satisfaction of such sum or sums so due or
owing as aforesaid but subject to such lien and power of sale and disposal
such surplus materials, tools and tackle shall belong to the contractor and may
be removed and disposed off by him as he may think fit.
56. ACCESS TO SITE AND WORK ON SITE
The Engineer-in-charge or his authorized representative may if he consider fit
from time to time enter upon any lands which may be in the possession of
the contractor under this contract, for the purpose of executing any work not
included in this contract and may execute such work not included in this
contract by agents, or by other contractors at his option and the contractor
shall in accordance with the requirements of the Engineer-in-charge, afford
all reasonable facilities for execution of the works including occupation of
lands by structure or otherwise for any other contractor employed by the
Corporation and his workmen or for the workmen of the Corporation who may
be employed in the execution on or near the site of the work not included in
the contractor’s any contract in connection with or ancillary to the works
and in default, the contractor shall be liable to the Corporation for any delay
or expense incurred by reason of such default. Provided always that if the
exercise of those power shall cause any damage to the contractor he may within
fifteen days of such damage arising make a statement of the same to the
Engineer-in-charge who shall from time to time assess the value in his
Judgment of such damage and the Corporation shall from time to time shall
pay to the contractor the amounts (if any accepted as justified) by the Engineer-
in-charge. The contractor shall not however, on account of any such modified,
EW- 269 PUR-F-006 RFQ-75871
new or extra work executed by or for the same of the Corporation be entitled to
claim relief from the obligation to execute other works.
57. INSPECTION OF WORKS
The Engineer-in-charge or his duly authorized agent shall have at all time full
power to inspect the works, wherever in progress, either on the site, on the
contractor's premises or at the premises wherever situated, of any firm or
Corporation where work in connection with this contract may be in hand.
Further, the contractor shall not allow, without written authorization permit
entry on site of work, any person except authorized agents of the Corporation of
the Engineer-in-charge or the contractor's staff and labour directly engaged on
and in connection with the work.
The contractor shall, during working hours, maintain supervisors having
sufficient training and experience to supervise the various items and operations
of the work and the said supervisors shall remain present during the
inspections of the Engineer-in-charge. All orders and directions given to such
supervisors or other staff of the contractor shall be deemed to have been given
to contractor. Further the Engineer-in-charge may be due notice, desire a
higher ranking members of the supervisory staff of the contractor to be present
on any specified inspection and the contractor shall comply with such
direction.
58. CLEANING UP
The contractor shall at all times keep the construction area and his power house
and storage areas free from accumulation of waste, or rejected materials.
Prior to the completion of the work the contractor shall remove all rubbish from
and about the premises, and all tools, scaffolding, equipment and materials
which are not part of permanent structure. The premise will be left in a manner
fully satisfactory to the Engineer-in-charge, thereafter only the completion
certificate will be issued.
59. CONTRACTOR TO KEEP INVENTORY OF MATERIALS etc.
The contractor shall prepare and maintain an inventory of all materials
temporary rolling stock, plant purchased or hired for use of employment or for
any of the purposed for this contract and such inventory or a copy thereof shall
at all times be available for inspection by the Engineer-in-charge. A complete
and up to date copy of the inventory shall be submitted to the Engineer-in-
charge in the beginning and once a year; thereafter changes in the interim
period, if any shall be communicated on every three months.
60. CONTRACTOR TO RESTORE PLANT
Upon completion of the work, the contractor shall deliver to the Corporation, all
appliances, materials, and plants which may have been loaned or hired to him
by the Corporation and make good all damages which may have occurred to
them, except such as shall be caused by fair wear and tear in execution of the
61. PROGRESS SCHEDULE
i) The contractor shall furnish, within one week unless extended by the Engineer
of the order to start the work, a progress schedule in quadruplicate indicating
the date of start the weekly progress expected to be achieved and the
anticipated completion date of each major items of work to be done by him, also
indicating dates of procurement and setting up of materials, plant and
machinery. The schedule should be such as is practicable of achievement
towards completion of the whole work in the time limit and of the particular
items on due dates specified in the contract and shall have the approval of the
Engineer. Further, the dates for the progress as in this schedule shall be kept
up-to-date. In case it is subsequently found necessary to alter this schedule, the
contractor shall submit in good time a revised schedule incorporating necessary
modifications proposed and get the same approved by the Engineer. No revised
schedule shall be operative within such acceptance in writing.
Detailed schedules for each week showing the progress proposed to achieve
shall be submitted to the Engineer and got approved. The Engineer is further
empowered to ask for more detailed schedule or schedules any week by week,
for any items or items, and the contractor shall supply the same as and when
asked for.
EW- 269 PUR-F-006 RFQ-75871
ii) The Engineer shall have, at all times the right without in any way vitiating
this contract, or forming grounds for any claim to alter the order of the works or
any part thereof and the contractor shall after receiving such direction proceed
in the order directed. The contractors shall also revise the progress schedule
accordingly and submit four copies of the revised schedule to the Engineer
within seven days of the Engineer's direction to alter the order of works.
iii)The contractor shall furnish sufficient plant equipment and labour and shall
work such hours and shifts as may be necessary to maintain the progress on
the work as per the approved progress schedule. The working and shift hours
shall comply with all GSECL's regulations in force and shall be such as may be
approved by the Engineer. They shall not be varied without the prior approval of
the Engineer.
iv)The contractor shall from time to time as may be required by the Engineer,
furnish the Engineer, with a statement in writing of the arrangement he
proposes to adopt for the execution of this contract and the Engineer may if he
considers, necessary at any time advise alteration in the same, which the
contractor shall adopt on notice thereof.
v) The progress schedules shall be in the form of progress charts, forms,
statement and/or reports as may be approved by the Engineer. Further, the
contractor shall submit four copies showing the progress of work in forms and
charts etc. at periodicals intervals as may be specified by the Engineer.
62. DATE OF COMPLETION
The contractor shall supply, erect, equip and construct the whole of the
works and hand over them to the Corporation on or before the date specified
in the tender document including "Special Conditions" and save as herein
provided, in no circumstances whatever shall extend or alter the date for the
completion of works. Provided always that if in the opinion of the Engineer-in-
charge the completion of the works shall be delayed by any change of
original design or by the order of the Engineer-in-charge, of any altered,
modified substituted or additional works or materials omitted or by strikes,
lock outs or stoppages of labour, or revolution, riots, civil or political
disturbance or by causes directly due to war or by the contractor not being
given possession of the site or any part there-of or by the Corporation taking
possession of and using the site or any part thereof or the works or any part
thereof, whether any nonperformance of work under the powers herein
contained or otherwise or by any nonperformance of work or non-supply of
materials to be performed or supplied by the Corporation or by the
contractor not receiving any orders, drawings, instructions or directions in
time or by the suspensions of the works or by fire, flood exceptionally bad
weather tempest, storm, or by from unforeseen circumstances (and whether
the same shall be due to any act or omission of the Corporation or its agents
or those in their respective service or not) the Engineer-in-charge may, if in
his unfettered discretion, he thinks fit either forthwith or at any later time
and from time to time not withstanding that the prescribed or extended
time for completion has expired or that the work have been completed, by
writing under his hand, extend the time for the completion of the works to
such date as he shall appoint. Provided always that unless the contractor
makes a written application to the Engineer-in-charge within one month of
the cause of delay and unless the time is extended by the Engineer-in-charge,
the prescribed time shall not be extended notwithstanding delays from the
aforesaid foregoing or any other causes of whatsoever kind.
63. SUBLETTING OF CONTRACT
There will be generally no objection on the component parts for the work, being
given over to responsible sub-contractors but Corporation shall under
no circumstances recognize these sub-contractors and the responsibility of
executing the work in the accordance with the conditions of contract will
entirely rest on the main contracts. The main contractors will therefore always
have the very responsible member, preferably a technical hand present on
the works with power to sign all work orders issued on the site of work and to
take requisite actions in the interest of very efficient execution of work.
EW- 269 PUR-F-006 RFQ-75871
However, the subletting of the contract can be made only with the prior
approval of the competent authority of the Corporation.
64. OTHERCONTRACTS FOR THE WORK SUSPENSION STOPPAGEOR
CURTAILMENTS OF WORK
If during the tendency of the contract the Engineer-in-charge shall for any
reasons (which shall be unquestioned) whatsoever require the whole or any
part of the work as specified in the contract to be suspended for any period
or shall not require the whole or any part of the work as specified in the
contract to be carried out at all by the contractor, he shall give notice in
writing of the fact to the contractor who shall thereupon suspend or stop the
work totally or partially as the case may be. In any, case, except as provided
hereunder, the contractor shall have no claim to any payment or
compensation whatsoever on account of any profit or advantage which he might
have derived from the execution of the work in full but which he did not so
derive in consequence of the full amount of the work not having being
carried out, or on account of any loss that he may be put to on account of
materials purchased or agreed to be purchased or for unemployment of
labour recruited by him. He shall not also have any claim for compensation by
reason of any alterations having been made in the original specifications,
drawings, designs and instruction which may involve any curtailment of the
work as originally contemplated. Where, however, materials have already
been purchased or agreed to be purchased by the contractor, before receipt
by him of the aforesaid notice, the contractor shall be paid for such materials
at the rate determined by the Engineer-in-charge, provided they would have
been useful for the work curtailed or stopped are not in excess of
requirements, are of approved quality and cannot be used on other contract
works or otherwise by the contractor and/or shall be compensated for the loss
if any, that he may be put to, in respect of materials agreed to be purchased by
him, the amount of such compensation to be determined by the Engineer-in-
charge, whose decision shall be final.
The Engineer-in-charge may grant extension of time for the execution of any
item or items of work affected by such suspension of work. The decision for the
Engineer-in-charge, regarding the granting of extension and the period thereof
shall be final. The Engineer-in-charge may order the contractor to suspend any
work on account of bad weather; rain or storm and such other adverse climate
conditions and the contractor shall comply with the same.
The contractor shall not be entitled to an compensation for such suspension of
work, concrete lining at the junctions of the different works under different
contract shall be done with particular care regarding forms, construction
joints, interconnecting reinforcement etc. If any and the joint planning of
such work shall be with prior approval of the Engineer-in-charge.
65. OTHER CONTRACTORS
Apart from this work, the other works connected with the power house will be
simultaneous going on either departmentally or through agencies inside or
outside the power house. Each contractor or agency shall co-operate with
others to the fullest extent and shall allow to each other every facility and
co-ordination for execution of their works simultaneously and satisfactorily,
during their action of machinery or execution of any other co-ordination works
of the power house, the contractor will have to work only at places as
directed by the Engineer-in-charge. He will have some time to suspend his
work partially or totally in the interest of the work at large.
In such cases and at such time, he will be informed from time to time and
directed by the Engineer-in-charge where to work. He may also be required to
remove the scaffolding or to erect the scaffolding and shuttering in such a
manner as to be of little obstruction and inconvenience for erection of
machinery. In such cases he shall not be given any compensation on account
of reduction or stoppage or labour force or removal and reinstatement of
scaffolding shuttering etc. It will be seen that contractor is not put to
unnecessary inconvenience.
In the matter of dumps, haul, roads, drainage, diversion and the like, each
contractor shall take into consideration the needs and requirements of the
EW- 269 PUR-F-006 RFQ-75871
other constructors, if any working in the vicinity. Further no contractor shall
take or cause to be taken any stops or action that may cause disruption,
discontent or disturbance to the work, labour of arrangements etc. or other
contractors in the neighboring project localities.
Any action, by any contractor, which the Engineer-in-charge in his
unquestioned discretion may consider as infringement of the above code, would
be considered as a breach of the contract conditions and the Engineer-in-
charge may take such action as he may deem fit against the contractor and
the action taken shall be considered as final and binding.
66. SPEED OF WORK
The contractor shall at all times maintain the speed of work to confirm to the
latest operative progress schedule but the Engineer-in-charge may at any
time with sufficient notice in writing direct the contractor to slow down any
part or the whole of the work for any reason (which shall not be question
whatsoever, and the contractor shall comply with such orders of the
Engineer-in-charge. The compliance of such orders shall not entitle the
contractor to any claim or compensation.
67. CONTRACT DOCUMENT AND MATTERS TO BE TREATED AS
All documents, correspondence, decisions and other matter concerning the
contract shall be considered as of confident and restricted nature by the
contractor and he shall not divulge or allow access there to any unauthorized
persons of any kind.
68. ACCESS TO THE CONTRACTOR'S BOOK
Whenever it is considered necessary by the Engineer-in-charge to ascertain the
actual cost for execution of any particular item of work of supply of plant or
material shall direct the contractor to produce the relevant documents such
as pay rolls records of personnel, invoices of materials and any other data
relevant to the item or necessary to determine its cost etc. and the contractor
to the aforesaid items in the mode and manner that may be specified.
69. INTEREST ON MONEY DUE TO THE CONTRACTOR
The contractors shall not be entitled to get interest on any amount either of
their bills or arrears whatsoever because of delay in payment by the
Corporation. Similarly they shall not be entitled for any interest on amount of
bank guarantees given by them. Non-payment of interest by the Corporation
therefore, shall not cause breach of contract.
70. MEASUREMENTS TO BE PROVISIONAL AND SUBJECT TO CORRECTION
Every measurements for running payment on account of work, done or supplies
made, shall be subject to adjustment or final measurements. In case of
disagreement between such intermediate and final measurements, the latter
shall prevail. All works shall be measured, met by standard measure and
according to rules and custom and usual in the use in Gujarat State Electricity
Corporation Ltd., and no proposal to adopt alternative method will be accepted,
the Executive Engineer’s decision as to what is “the usual method in use in the
Gujarat State Electricity Corporation Ltd.” shall be final.
71. BREACH ON PART OF CORPORATION NOT TO ANNUAL CONTRACT
No breach or non-observance on the part of the Corporation of any of the
agreements contained herein, shall annul this contract or discharge the
contractor from the observance and performance thereof, or of any part
thereof, but on application by the contractor and in the unfettered discretion
of the Engineer-in-charge an extension of time may be given to the
contractor in respect of such breach or non-observance by the Corporation.
72. PROFORMA RETURNS
The contractor shall maintain Performa, charts and details regarding
machinery equipment materials, labour personnel and other matters as may be
specified by the Engineer-in-charge. He shall further, submit returns of
Performa and details as may be specified by the Engineer-in-charge from
time to time.
73. LOCAL LAWS
EW- 269 PUR-F-006 RFQ-75871
All local laws in force at the time of entering into the contract and those
enacted thereafter shall be binding on the contractor and he shall abide by the
All import duties, sales tax and other local taxes shall be borne by the
contractor and they shall be deemed to have been covered by this quoted
tender rate
74. WORKS IN SHIFT DUTY
Works shall be planned in shift duties, if possible in three shifts, depending on
emergency of the work with prior approval of Eng. - in- charge. 0n Sunday or
any other holidays work shall be continued in order to maintain progress with
prior permission of Eng.-in -charge. Such works shall not form any grounds for
complaint, compensation or extension of time limit.
If on the other hand, the Engineer-in-charge directs that the work shall be
proceeded with on days and during hours which are not permissible under
this contract, the contractor shall proceed with the work as directed without
in any way vitiating this contract or forming any grounds for compensation
The contractor shall in his dealing with labour, atall times, during the period of
this contract, have due regard to local festivals and religious and other
A working day shall consist of two shifts each of eight hours, a working day
shall constitute any day on which in the opinion of the Engineer-in-charge,
work can be carried out in one or more shifts.
75. LIENS
Final payment to the contractor shall not be made until the contractor shall
deliver to the purchaser or receipts in full in lieu thereof, and in either case, an
affidavit that so far he has knowledge or information the releases and receipts
include all the labour and material for which in lien could be filed. If any lien
remains unsatisfied after all payments are made, the contractor shall refund to
the purchaser all moneys that the latter may be compelled to pay in
discharging such a lien, including all costs and a reasonable attorney's.
76. MISCELLANEOUS:
1. In case of conflict / discrepancies among clauses of different specifications
given in this document, the stringent specification shall be followed and under
such circumstances, the decision of the EIC shall be final and binding to the
Contractor
2. The Notice inviting tender, general instruction to bidders and all other
documents of this tender shall form part of the contract
3. No receipt for any payment alleged to have been made by a Contractor in
regard to any matter relating to tender of the contract shall be valid and
binding on the Corporation unless it is signed by the Engineer-in-Charge.
4. As per provisions of Income Tax Act, Corporation shall deduct Income Tax at
the applicable rate.
5. Agency has to note that the extension of Time limit/excess saving in the works
if required to approve, than it shall be processed as per the provision of DoP
and will take time for process the same.
6. The contract is inclusive of the cost of materials required to complete the work
in totality.
7. It will be absolutely incumbent on the contractors to have on the site of work
only such of the materials as have been duly passed by the Engineer-in-charge.
Materials that have been rejected must on no account be allowed to remain on
the site, and in spite of written order to do so, any such rejected materials is on
the site beyond a period of 48 hours’ notice, the Engineer-in-charge shall have
the right to remove it, at the risk and cost of the contractors and even to
destroy it.
8. It must be distinctly understood that conditions of contract and of claims in
respect of extra work, will not be allowed unless the works to which they relate
is clearly without the spirit and meaning of the specifications or unless such
works are ordered in writing by the Engineer-in-charge and claimed for in
specified manner.
9. Contractor will be asked to present the sample of materials, and the approved
samples will be preserved at the site of work, and no change in the approved
EW- 269 PUR-F-006 RFQ-75871
sample will be allowed, without the written permission of the Engineer-in-
10. The department reserves the right to make any change in the design and the
plans of the works. The contractor shall be bound to carry them out at the
rates tendered. No claim or compensation will be allowed on this account.
11. The contractor shall keep instruction book on site, for taking site instructions
from time to time. This book shall be made available on site whenever asked
12. Above construction equipment brought to site shall be allowed to be taken out
only after the work for which it has been brought is over. The equipment shall
be taken out only with the specific permission in writing from the E.I.C. Only
the equipment required for the work and in fit condition shall be brought to the
site. The Contractor shall ensure that proper documentation is followed at
entry gate of GSECL's premises for such items which shall be carried back by
Contractor after completion of work.
13. The Contractor shall provide all temporary ladders, scaffolding materials,
platforms, supports and other necessary facilities required for trimming &
cutting of trees. The Contractor shall provide sufficient, strong and safe staging
so as to ensure safety of the laborers.
14. The Contractor shall provide sufficient fencing, notice Corporations and lights
to protect and warn others as may be considered necessary by the GSECL and
safety authority.
15. The GSECL may during the progress of work, order the removal of part or
whole of the work executed, found not in accordance with the approved
drawings, specifications/ instructions. No extra claims shall be entertained for
re-executing or altering of such work.
16. On completion of the work, the site shall be left in good order and the excess
materials, scraps, debris, if any shall be removed and dumped by the
Contractor at place/places as designated by the GSECL. The Contractor shall
also dismantle and remove the staging and other temporary facilities like
stores, offices, labor camp etc. on completion of work.
17. Contractor is required to maintain proper records at site of work in addition to
normal routine requirement of own office. The records to be maintained shall
include but not limited to the following:
(a) Daily Progress Record.
(b) Work Site Order Book.
(c) Instruction by GSECL's Officers.
(d) Test Registers of other materials/fittings, fixtures, equipment as
stipulated in the tender.
(e) Register for Working Details.
(f) Log Book of Defects.
(g) Hindrance Register giving details of commencement and removal of each
hindrance.
(h) Supply and consumption registers of all materials shall be maintained.
(i) Day to day Record of used/received materials shall be entered in the
register and signed by the Site Engineer of the GSECL as well as
contractors' representative at site.
(j) Measurement Book.
77. SALES TAX ON WORK CONTRACT
The Gujarat Government by its amendment to the Gujarat sales tax act
has also made works contract subject to Sales Tax. However works
contract tax shall be liability of the contractor and shall be born by the
contractor. More ever you shall also have to submit form No 702 as
prescribed by Gujarat Sales Tax act while submitting invoice.
More ever the purchaser will not pay any composite tax/turnover
tax/works contract tax which contractor has to pay as per act. Hence the
incidence of sales tax or such type of taxes shall not be payable by the
purchaser in any case even if such taxes are levied on the
party/contractor at a future date.
78. As per C.O circular No. GSECL/Medical/PME/O1 DTD.16.07.2019 i.e
for procedure for health cheak-up accordingly bill shall be reimbursed
once during total contract period (for as & when and AOH/COH contract)
maximum up to Rs.1000 or actual cost per worker/ labour /person,
EW- 269 PUR-F-006 RFQ-75871
whichever is minimum after verification & recommendation by concern
doctor. In case any worker left the work in between than for replacement
Worker Company will not provide any reimbursement, however it is
compulsory to submit new report of replacement worker for fitness
certificate at contractor’s own expense.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES
LIST OF SAFETY TOOLS
EW- 269 PUR-F-006 RFQ-75871
TENDER & CONTRACT FOR WORKS
I/We hereby tender for the Gujarat State Electricity Corporation Ltd. (herein Referred as
“Corporation”) of the work specified in the underwritten memorandum within the time
specified in Schedule B (memorandum showing items of work to be carried out) and in
accordance, in all respect, with the specifications, design, drawings and instructions in
writing and as per annexed conditions of contract and agree that when the materials for
works are provided by the Corporation, such materials and rates to be paid for them
shall be as provided in Schedule A hereto.
MEMORANDUM
(a) General description of work : “Providing and Fixing False Ceiling by
removing existing false ceiling in control rooms and Misc Civil works of
Unit # 3,4 & 5 at GTPS.”
(b) Estimated cost : Rs. ………………../-
(c) Earnest money : Rs. 1,49,318.00/-
(d) Security deposit : As per cl. no.7 of Section C (i.e General
condition of contract).
(e) Time allowed for the completion of work from date of written order to commence.:
(Eleven Months)
Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms
and provision of the conditions of contract annexed hereto as applicable and in default
thereof forfeit and pay to the Corporation, the sums of money mentioned in the said
conditions.
Receipt No. Date from the Gujarat State Electricity Corporation Ltd. in respect of the sum
of Rs____________________________________. (The amount to be specified in figures and
words) is herewith forwarded representing the earnest money (the full value of which is to
be absolutely forfeited to the Corporation, should I / we do not execute / commence
the work after issuance of date of commencement by GSECL.
Signature of the Contractor:
Address of the Contractor:
Dated__________________ day of _______________year
Signature of Witness:
Address of the Witness:
Occupation:
Dated__________________ day of _______________year
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity
Corporation Ltd.
For & On behalf of GSECL
Chief Engineer (Gen)
GSECL GANDHINAGAR TPS
his duly authorized Assistant
EW- 269 PUR-F-006 RFQ-75871
General Safety Rules & List of Safety Tools.
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS
All the contractors working in Gujarat State Electricity Corporation Limited Factory
like Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the
following Safety Rules. Concern principle contractors are responsible for informing &
observance of these rules by their supervisors/contract workers as well as the
owner/supervisors/ workers of sub-Contractors engaged, if any, by them for the work
contract awarded to them. Prior to commencement of the work, Contractor shall have to
submit a written assurance on their letterhead to the concerned Sectional Head /
Engineer-in-charge that they have thoroughly gone through these Rules, have educated
their employees / workers of their sub contractor and will strictly observe the said Rules
while execution of work under work contract awarded to them. They will have to indemnify
the company for any loss or damage / accident / injury to the company’s property /
employee or employee of their own in default of non - observing these rules.
(01) Contrac tor should issue photo gate pass for their workers from GSECL
Factory Manager as per Gujarat Facto ries rules, 1963 & details shall be
filled up in GSECL gate pass format as per Aadhar card /Election card
id proof & to follow the gate pass issue procedure through concern
department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical Officer,
Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer
only for three days with prior permission of Factory Manager only. More than three
days, Permanent photo gate pass procedure shall be completed by contract agency
for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33
of Gujarat Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for
all contractor workers before commencement of work & examination responsibility
shall be taken by contractor as well as concerned Head of Department .Pre-
employment & Periodical medical examination of contractor workers shall be carried
out in form no.32 from GSECL Factory Medical Officer after every six (06) months of
contractor with their contractor workers. Contractor shall be fulfilled all health
requirements before commencement of work. After completion of medical examination
in form no.32/33, GSECL Factory Medical Officer shall be signed in contract worker
gate pass procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D
animation movie & Training record is to be maintained in IMS/OHSAS training
format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked
the issue PPE to contract workers as per nature of job, Form no.10 of lifting tools and
tackles, Driving license, Electrical contractor license, Electrical trade qualifications,
Safety induction training, SOP, supervisor qualifications etc. After fulfillment of all
Safety compliances, Safety Officer/Dy. Safety Officer shall be signed in Contract
worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is
awarded the work order. Subletting of contract shall be allowed only if prior approval
of Power station chief before execution of work. Contractor/agency shall be
submitted the entire subletting contract documents with gate pass application
through concern department EE & SE, LWO/DGM, Safety Officer/Dy.Safety Officer &
Factory Manager.
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
1956, Valid Electrical contractor License shall be submitted to concern electrical
department EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the
time of apply gate pass by agency/party with latest renewal from Chief Electrical
Inspector, Gandhinagar- Gujarat. Electrical License photocopy shall be checked by
Concerned HOD of Electrical Department/Electrical Safety Officer/Dy.Safety Officer/
Safety Officer/Factory Manager.
(08) As per nature of job/work, qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I) + 3 years experiences or ITI + 10 years) shall be engaged by
contract agency & qualification certificate with experience certificate shall be
EW- 269 PUR-F-006 RFQ-75871
submitted to concern EE/SE/LWO/IRO/DGM/ Dy. Safety Officer /Safety
Officer/Factory Manager at the time of apply gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry
out the work on electrical lines and Apparatus, Contract person/worker possesses
a certificate of competency or electrical work permit, issued by the Appropriate
Government. That means, Electrical trade Qualification of contract worker/person
like ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH (Elect), ME/ M. TECH
(Elect) shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy. Safety Officer/
Safety Officer/Factory Manager at the time of apply for photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling
work /24X7 round the clock work/major shut down work, Qualified Safety
Officer/Manager/Supervisor (BE/Diploma (Elect/Mech./Civil) + PDIS-Post Diploma in
Industrial Safety) shall be engaged by contractor during dangerous
operations/dangerous works as well as day to day dangerous activities, safety
supervision, tool box talk, Safety awareness programme, SOP preparation with
hazards & its control measures with each step , checking of lifting tools & tackles,
hydra mobile crane, Safety precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of
vehicles & to follow the Motor vehicle Act,1988, the Central Motor Vehicles
(Amendment) Rules,2016 as well as Gujarat Motor Vehicles rules,1989 & driver
license shall be checked every day by security shift in charge before entry in the
Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through
competent person as per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with
05 years experiences. SOP will review & approve by concern JE/DE/EE/SE/Elect.
Safety Officer/Dy. Safety Officer /Safety Officer/Factory Manager before execution of
(13) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as
per the job requirement. Do not work without use of required P.P.Es. Contractor is
responsible to provide standard make (ISI/DGMS/CE/EN/ANSI approved) & to
checked standard/make in PPE issue format by concern JE/DE/EE/SE/Safety
Officer/Factory Manager. Personal Protective Equipments / Safety Gadgets suitable to
give sufficient protection against hazards involved in their work / job to their staff, as
per the job requirement and insist / enforce their workers to put on the same while at
The ongoing work is liable to be stopped at any time if your contract workers/staffs
found working without P.P.Es. Following is the list of various P.P.Es (as per
ISI/DGMS/CE/ EN/ ANSI approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety
Shoes, Safety Helmet, Safety goggles, Mask & Reusable Ear plug to their
workers/supervisor compulsory & it will check by concern section HOD & Dy. Safety
Officer /Safety Officer at the time of gate pass procedure.
Industrial Safety Helmet For protection of head against falling objects or during
fall of person from height. Yellow Colour helmet is
used for contract worker with agency logo.
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/chemical splash chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear For ear / hearing system protection while working in
muffs. high noise level area.
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp
/Fire proximity suit/FR edged objects, heat, hot objects etc.
Boiler Suit
Safety Hand Gloves For protection of hands against chemicals, oils, sharp
edged objects, heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots For protection of leg/feet against falling objects, sharp
with edged objects, heat, hot metals/objects, electricity
Oil/Chemical/water/heat/ etc..
Electrical resistance etc.
EW- 269 PUR-F-006 RFQ-75871
Safety Belt(full body For fall prevention while working at heights or in
hardness with double depth, working in vessel or in confined space.
lanyard & shock absorber) /
Rope / Life line / Fall
arrestor etc.
Dust Mask/Respirator with Protection of respiratory system against dust.
valve(FFP2)
Chemical Cartridge Protection against toxic chemical fumes /
Respirator with full face gases/vapors/dust etc.
mask type A2B2E2K2
Trolley mounted Air line Working in oxygen deficient zone or confine space area
respirators with full face
Portable Single gas detector Working in hazardous storage/process area
like Chlorine, Ammonia,
Hydrogen, etc
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from
(one) feet distance before starting the any electrical
Auto darkening welding The new auto darkening welding helmet combines
helmet (EN 379 & EN 175 legendary Speed glass quality and auto darkening
Level-B) with PAPR as per technology with an innovative wide-view grinding visor
EN 12941:1998, class TH2 to give welders an all-in-one solution for more
and AS/NZS 1716 flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter
which removes particles from the air. The unit
provides a constant airflow independent of filter
combinations and clogging. The unit can also be
equipped with a gas filter (for example A1B1E1). The
unit supplies air to the head top via the connecting
breathing tube. The airflow creates a slight positive
pressure which together with the sealing to the face
prevents particles and other contaminants from
entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and
allotment of PPE list shall be submitted to Safety Officer, Dhuvaran on his letter head
as per below mentioned format by Contractor before commencement of work through
concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Work order no.
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name Desig Name of Name of PPE IS Make Qty Un Date Receivin
no. of natio Section :Code of it of g
worke n under no. of PPE issu signatur
rs work PPE e e
Safety Helmet No
Safety goggles No
EW- 269 PUR-F-006 RFQ-75871
Reusable Ear Pai
Dust Mask No
Safety Shoes Pai
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety
Helmet of all contractor workers at entry gate of Factory Premises & shall entered
contractor workers with Safety Shoes & Safety Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all
contractor workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should
always remain present at work site. Concern JE/DE of GSECL shall be supervised
the contract work as per SOP .
(18) Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/C&I/Environment survey/Chemical etc measuring
/testing equipments/instruments which are used during contract work shall be
submitted before starting the work & shall be checked by concern JE/DE/EE before
starting work & it’s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of
work on dangerous substances, machineries or area at which cautionary notice is
displayed and obtain “Line Clear” or “Work Permit” through the concern Department
/ Section JE/DE and shall be informed to concern section JE/DE for closed/
returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern
JE/DE regarding hazards of specific work, risk & it’s control measure (mentioned in
HIRA) before starting the job work and records shall be maintained for each & every
job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working
in factory premises.
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by
contractor & contractor workers from Concern EE/Chief Chemist before starting of
chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened
fixed vessel, sump, tank, pit or opening in ground or in floor which, by reason of its
depth, situation, construction or contents ,is or may be a source of danger before
starting the work each & every days or after interval/recess. Contractor supervisor
shall be informed to concerned HOD regarding any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses,
mobile phone etc are to be strictly followed by all workers who are working in factory
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job,
remove all the inflammable material lying at or nearby worksite or cover it properly by
suitable protective covering. Also, special care shall be taken before carrying out such
job & see that all possible contributing factors to set fire shall be removed / vanished
prior to commencement of the work. Advance intimation shall be given to concerned
section / fire section to commence the work in fire prone areas. They should also
keep ready all the First Aid Fire Extinguishers / equipments & fire extinguishing
media / material like sand / water buckets or other appropriate equipment at such
(26) While carrying out work in confined space or inside vessel, obtain necessary
“Confined Space / Vessel Entry Permit” from concerned department prior to
commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp
shall be used. For taking care of the persons working inside the confined space /
vessel, a supervisor / person capable to keep continuous watch on person(s) working
inside, assist them in case of emergency or arrange to get immediate outside help,
shall remain present at entry point. Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders /
entrants / passers etc shall remain available near entry point or the entry point shall
EW- 269 PUR-F-006 RFQ-75871
be cordoned by a barricaded tape with a cautionary notice. After completion of the
works, all the lids / covers / grills / grits opened, shall be re-fixed / re-placed in the
original position as it were prior to commencement of the work and leave the work
place in safe condition in all respect, so as to prevent accident to fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads
leading to plans or its auxiliaries, on which there is traffic movements or possible
traffic movements in case of emergency. Such passages are meant for safe escape in
the event of emergency. If it is utmost necessary to carry out work in such area with
blocking of passage, prior permission of Competent Authority or the Engineer-In-
Charge shall be obtained. To demarcate / declare the area as “UNSAFE”, cordon it
using barricading tape & display suitable caution notice or keep a person to restrict /
divert the traffic on this route through other safe passage.
(28) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads
leading to plans or its auxiliaries, on which there is traffic movements or possible
traffic movements in case of emergency. Such passages are meant for safe escape in
the event of emergency. If it is utmost necessary to carry out work in such area with
blocking of passage, prior permission of Competent Authority or the Engineer-In-
Charge shall be obtained. To demarcate / declare the area as “UNSAFE”, cordon it
using barricading tape & display suitable caution notice or keep a person to restrict /
divert the traffic on this route through other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines /
gadgets like welding machine, hand grinder, hand drill etc, ensure for its safe
operation & use it only if it is found safe to use. Do not use defective, unsafe or
improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken
directly at their own but shall be obtained through concerned Electrical Maintenance
Departments or their authorized persons or under their observations / guidance only.
The Electrical Section shall provide temporary electrical connection up to contractor’s
Mains Board on which it is compulsory to install mains switch, ELCB & fuses of
adequate capacity. All such equipments shall invariably be earthed adequately to
prevent electrical shock, sparking, short circuit etc. Power cord to be used shall be of
adequate capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord
for three phase power connections. The plugs, receptacles, pins, holders etc shall be
of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used
during work execution shall be of standard make & bear ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which has
specific prescribed life span shall not be used in any case if its expiry date is over.
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by
Electrical contractor for safe use in areas where hazardous, flammable, or
combustible vapors, liquids, dusts, or residues may be present in Gas Based power
plant and list of tools and tackles shall be submitted with technical bid. Non-
Sparking Non-Magnetic electrical hand tools and tool kits shall be checked by JE/DE
before commencement of Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift,
mobile crane, EOT crane etc) & its attachments (like D-shackles, slings, U-clamps,
Eye bolts or any fixtures), it shall be checked and used only if found safe to use. Also,
ensure that these are tested, examined & certified in form no.10 by Competent Person
as per the Factory act-1948 & Gujarat Factories Rules and its validity do not expire.
Further, it shall be fixed properly and firmly prior to lifting the weight. Valid Test
certificate of all Lifting machines used by Contractor to be submitted to
Dy.Safety Officer/ Safety Officer before commencement of work through
concerned EE/SE.
(32) Metal Scaffoldings to be used for working at height shall be of adequate size &
capacity. Obtain the work permit when working at height. While climbing on such
EW- 269 PUR-F-006 RFQ-75871
scaffolding or working on any structure at height, use of full body safety belt /full
body hardness with double lanyard & Fall arrestor & Helmet is compulsory. It is also
necessary to fasten chinstraps of the helmet.
(33) Contractor or their employee shall not interfere in day-to-day routine plant activities /
works except the work assigned to them, shall not loiter in the areas other than their
work jurisdiction, as well as shall not temper / operate / touch the
machineries/equipments/auxiliaries with which they are not concerned. Also, the
contractor shall strictly instruct their staff for not to sit or take rest at/near/below
running plants, auxiliaries, systems or any place which is risky, hazardous & prone
to accident.
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like
Oxygen, Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled
safely taking due care. To handle / shift such cylinders a special trolley /cage meant
for it must be used but in no case it should be rolled.
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour
generated area, Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall
be provided on each vehicle by party/agency and it will check by shift security in
charge before entry of vehicles in the factory premises.
(36) No women or young person shall be employed or permitted to work in Lead-
compound area like battery room etc. as per schedule VI of GFR
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of a
prime mover or of any transmission machinery while the prime mover or transmission
machinery is in motion. Examination or operation of motion machinery shall be made
or carried out only by a specially trained adult male worker wearing tight fitting
clothing as per section 22 of factories act
(38) In all risky job, before start the work, contractor should obtain General Safety Work
Permit through concerned section from Shift –in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make
immediate efforts to extinguish / control it and simultaneously inform the Fire
Station Mobile No as well as Station Fire Officer or Emergency Control room no which
is displayed at prominent place of factory like Main Security Gate, All unit control
room, Canteen area, Safe Assembly points, Fire Station, All security gates,
Occupational Health Centre.
(40) In case of any injury / accident while working, it shall immediately be reported to
Safety Department through concerned Sectional Head / Engineer. The prescribed
Form No. 21 & ANNEXURE may be obtained from concerned section or Dy.Safety
Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety
Officer through concern Sectional Head / Engineer. The prescribed Electrical
accident form no. A as per electricity act-2003 & Form No. 21 & ANNEXURE as
per Gujarat Factories rules shall be filled up by concern department JE/DE with
written consent of contractor. The Form may be obtained from concerned Electrical
section or Electrical Safety Officer. Electrical accident investigation shall be carried
out by Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness
certificate of injured person with endorsement of GSECL factory Medical Officer to
LWO/Dy.Safety Officer/Safety Officer/Electrical Safety Officer then after injured
person may allow for work.
(41) For any incident occurred but have no injury to any persons should also reported as
per GSECL format and informed to Dy.Safety Officer/Safety Officer as Near Miss
(42) Safety penalty shall be imposed against violation by contract workers: if any contract
worker worked in a factory contravenes any provision of factories act or any rules or
orders made there under. Imposing any duty or liability on workers,
contractors/agency shall be punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, Rs.1000/- per day
confine space entry, hot work etc.
EW- 269 PUR-F-006 RFQ-75871
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge Rs.1000/- per set
regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature of job Rs.1000/-per day
like mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles Rs.2000/- per
(like C.P.Bs., Hook chooks, winch, forklift, mobile crane, equipment
EOT crane etc) & its attachments (like D-shackles,
slings, U-clamps, Eye bolts or any fixtures) in Form
No.10 of Gujarat Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working Rs.3000/-per person
at Height work, work without anchoring in hook/line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
(xi) (a) Grinding machine used without safety guard/ Rs. 500/- per
machine guard equipment/ per set
(b) Unsafe welding machine like open body. Knob
without insulation. Connection without plug
(c) Damaged welding cables/gas pipelines
(d) Welding work doing without welding blanket.
(e) Electrical supply without 3 pin plug/industrial plug.
(f) Use of damaged electrical wire for
lighting/equipments.
(g) Use of lighting lamp without cage.
(h) Use of open halogen tube.
(i) Use of damaged PPEs/use of non standard PPEs
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB. etc
During plants visit/supervision of concern JE/DE/EE,SE. Safety officer/Dy. safety
officer. Electrical safety officer , factory manager, if they will observed any safety
violations as per CO circular/statutory requirements then they must imposed safety
penalty through office note directly against contract workers/contract agency and
Office Note process through proper channel to concern sectional head and Account
head for recovery purpose. Photograph/CCTV Footage is to be put a with penalty
note by imposing officer.
(43) Party will damage any fire equipments or property or machinery in factory during
execution of work, total damage cost will be recovered from party RA bill and recovery
Office note put up by concern HOD.
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod
pieces, scrap etc. are to be removed by contractor and scrap shall be deposited to
scrap yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire incident
& near miss accident will be considered. Steps can be taken to review the job
assignment up to cancellation for negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements /rules
& regulations / norms and legal provisions laid down in various statutes. Particularly
the provisions of The Factories Act-1948 & the Gujarat State Factories Rules-1963
(Amended up to date), The Electricity Act-2003 & rules, BOCW Act/Rules shall be
followed strictly. The contractor shall also obey the rules / regulations / instructions
of the local Competent Authority for safety & health requirements.
(48) The above rules shall be scrupulously followed and where required, Contractor
/contractor workers may contact to the Dy.Safety Officer/Safety Officer/Electrical
Safety Officer in case of any ambiguity or needs further guidance in this regard.
(49) Medical Health check up guidelines:-
EW- 269 PUR-F-006 RFQ-75871
As per C.O circular No. GSECL/Medical/PME/O1 DTD.16.07.2019 i.e for procedure
for health cheak-up accordingly bill shall be reimbursed once during total contract
period (for as & when and AOH/COH contract) maximum up to Rs.1000 or actual
cost per worker/ labour /person, whichever is minimum after verification &
recommendation by concern doctor.
In case any worker left the work in between than for replacement Worker Company
will not provide any reimbursement, however it is compulsory to submit new report
of replacement worker for fitness certificate at contractor’s own expense.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
ANNEXURE - I
EW- 269 PUR-F-006 RFQ-75871
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Security Deposit for work period as per Terms and Conditions of
We, Bank of ______________________________________________ hereby agree unequivocally
and unconditionally to pay immediately on demand in writing from the Gujarat State
Electricity Corporation Limited, or any Officer authorized by it in this behalf any amount
up to and not exceeding Rs.__________ (in words) Rupees
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract
for the supply / works specified below :
L.O.I. No. _____________________________________________________ dated ______________.
This agreement shall be valid and binding on this Bank up to and inclusive
of________________ and shall not be terminable by notice or by change in the constitution
of the Bank or the firm of Contractors / Suppliers or by any other reason whatsoever and
our liability hereunder shall not be impaired or discharged by any extension of time or
variations or alterations made, given conceded or agreed, with or without our knowledge
or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL or Subsidiaries). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of
the Guarantee can be made only by the beneficiary directly
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________ (Rupees
_______________________________________________________ only). Our guarantee shall
remain in force until _______________ (date of validity of the Guarantee). [Unless demands
or claims under this Bank Guarantee are made to us in writing on or before _____________
(date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee
shall be forfeited and we shall be released and discharged from all liabilities there under]:
Please Mention here Complete Postal Signature of
Address of the Bank with Branch Code, Bank’s Authorized Signatory
Telephone and Fax Nos. with Official Round Seal
EW- 269 PUR-F-006 RFQ-75871
NAME OF DESIGNATED BANKS: (Annexure – I.)
A Guarantees issued by following banks will be accepted as SD/EMD on
permanent basis.
1. All Nationalized Banks.
B Guarantees issued by following Banks will be accepted as SD/EMD for
period up to March 31, 2026. The validity cut-off date in the GR is with
respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
1. AXIS Bank
2. A U Small Finance Bank
3. Bandhan Bank
4. Barclays Bank
5. City Union Bank
6. CSB Bank
7. DBS Bank India Limited
8. DCB Bank
9. Equitas Small Finance Bank
10. ESAF Small Finance Bank
11. Federal Bank
12. HDFC Bank
13. HSBC Bank
14. ICICI Bank
15. IDBI Bank
16. IDFC First Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. South Indian Bank
23. Standard Chartered Bank
24. Tamilnadu Mercantile Bank
25. Utkarsh Small Finance Bank
26. Yes Bank
27. Ahmedabad Mercantile Co-Operative Bank
28. Nutan Nagrik Sahakari Bank Ltd.
29. Rajkot Nagrik Sahakari Bank Limited.
30. Sarswat Co-Operative Bank Ltd.
31. SBPP Co-operative Bank LTD
32. SVC Co-Operative Bank Ltd.
33. The Cosmos Co-op Bank Ltd.
34. The Gujarat State Co-Operative Bank
35. The Mehsana Urban Co-Operative Bank Ltd.
36. The Surat District Co-operative Bank
37. The Surat Peoples Co-operative Bank Ltd.
38. The Kalupur Commercial Co-operative Bank
39. The Panchmahal District Co-operative Bank
40. The Baroda District Co-operative Bank
41. Baroda Gujarat Gramin Bank
42. Saurashtra Gramin Bank
EW- 269 PUR-F-006 RFQ-75871
EMD BANK GUARANTEE FORMAT
FOR TENDER /ENQ. NO. ___________________________________
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300)
WHERE AS M/s. _______________________________________________________________
(Name and Address of the Firm) having their registered Office at
_________________________________________________(Address of the Firm’s registered Office)
(hereinafter called the Tenderer) wish to participate in the Tender
No.__________________________ for______________________________________ of (supply /
Erection / Supply & Erection / Work) of __________________________________ (Name of the
material / equipment / work) for _________________________ Gujarat State Electricity
Corporation Limited and WHEREAS a Bank Guarantee for (hereinafter called the
“Beneficiary”) Rs. _____________ (Amount of EMD) valid till ____________ (mention here date
of validity of this Guarantee which will be 4 (FOUR) months beyond initial validity of
Tender’s offer) which is required to be submitted by the Tenderer along with the
(Name of the Bank and address of the Branch giving the Bank Guarantee) having our
registered Office at _____________________ (Address of Bank’s registered Office) hereby give
this Bank Guarantee No. _________________dated ____________ and hereby agree
unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited or any Officer authorized by it in this behalf
any amount not exceeding Rs.____________ (amount of EMD) (Rupees
______________________________________________________) (in words) to the said Gujarat
State Electricity Corporation Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the tender or part thereof by the Tenderer within its validity or non-
submission of Security Deposit by the Tenderer within one month from the date of tender
or a part thereof has been accepted by the Gujarat State Electricity Corporation Limited
would constitute a default on the part of the Tenderer and that this Bank Guarantee is
liable to be invoked and encased within its validity by the Beneficiary in case of any
occurrence of a default on the part of the Tenderer and that the encased amount is liable
to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive
of____________________ (mention here the date of validity of Bank Guarantee) and shall not
be terminated by notice or by Guarantor change in the constitution of the Bank or the
Firm of Tenderer or by any reason whatsoever and our liability hereunder shall not be
EW- 269 PUR-F-006 RFQ-75871
impaired or discharged by any extension of time or variations or alterations made, given,
conceded with or without our knowledge or consent by or between the Tenderer and the
Gujarat State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL or Subsidiaries). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of
the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee
is restricted to Rs. ________ (amount of EMD) (Rupees
________________________________________ (in words). Our Guarantee shall remain in force
till _____________ (date of validity of the Guarantee). Unless demands or claims under this
Bank Guarantee are made to us in writing on or before ___________ (date of validity of the
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we
shall be released and discharged from all liabilities there under.
Please mention here complete Postal Signature of the
Address of the Bank with Branch Code, Bank’s authorized
Telephone and Fax Nos. Signatory with Official Seal.
EW- 269 PUR-F-006 RFQ-75871
GUJARAT STATE ELECTRICITY CORPORATION LIMITED- GTPS
INTEGRITY PACT
OUR ENDEAVOUR
To create an environment where Business Confidence is built through Best Business
Practices and is fostered in an atmosphere of trust and respect between providers of goods
and services and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical Not to bring pressure recommendations
standards in business and from outside GSECL to influence its
professions. decision..
Ensure maximum transparency to Not to use intimidation, threat,
the satisfaction of stakeholders. inducement or pressure of any kind on
GSECL OR ANY OF it’s employees
under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in
agreement/contract and to consider fulfilling the contract, agreement, legal
objectively the view point. obligations.
To ensure regular and timely To provide goods and / or services
release of payments on due dates timely as per agreed quality and
for work done. specifications at minimum cost to
To ensure that no improper demand To abide by the general discipline to be
is made by employees or by anyone maintained in our dealings.
on our behalf.
To give maximum possible To be true and honest in furnishing
assistance to all the information.
Vendors/Suppliers/Service Provider
and other to enable them to
complete the contract in time
To provide all information to Not to divulge any information,
suppliers/contractors relating to business details available during the
contract / job which facilitate him course of business relationship to
to complete the contract / job others without the written consent to
successfully in time. GSECL.
To ensure minimum hurdles to Not to enter into carter / syndicate
vendors / suppliers / contractors in /understanding whether formal / non
completion of agreement / contract formal so as to influence the price.
/ work order.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
Name : Name:
Designation:
Name : Name:
Designation:
EW- 269 PUR-F-006 RFQ-75871
On Firm’s Letter Head
CERTIFICATE - A
I / We ________________________________________________ authorized signatory of
M/s._________________________________________________here by Certify that
M/s. _____________________________________________ is not related with other firms who
have submitted tenders for the same items under this inquiry / Tender.
Signature of the Tenderer
With Designation
Seal of the Firm
EW- 269 PUR-F-006 RFQ-75871
GENERAL GUIDELINES RELEVANT TO I.S.
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
STEEL / CEMENT
EW- 269 PUR-F-006 RFQ-75871
GENERAL GUIDELINES RELEVANT TO IS
Please refer latest edition of relevant Indian Standard Specification of Code
i.e. B.I.S. General relevant I.S. of B.I.S. shall prevail for all items including
materials, measurements etc.
The Item wise detailed specifications are intended for full description of items
covered by Schedule “B”. The specifications are not however intended to cover
every detail and the works shall be executed according to the spirit of the
specifications below and the best prevailing P.W.D. practice. The clarification
to any clause in detailed specifications shall be sought from the latest edition
of relevant I.S. specification and codes. Where these specifications are at
variance with the specification laid down in the I.S. Books stated above, the
former will be applicable. As regarded matters not covered by any of the above
specification, the decision of the Engineer-in-charge shall be treated as final
and shall be binding upon the contractor. The contractor is expected to get
clarified any doubt about specification, etc. before tendering by discussing
with Engineer-in-charge.
For detail technical specification, the item wise description along with above
general specifications shall hold good.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
SPECIAL CONDITIONS FOR USE OF CEMENT IN WORK
1 The rates in Schedule – ‘B’ is inclusive of cement cost. Contractor has to purchase fresh
grade cement confirming to as per IS 8112 Or PPC IS 1489 (Part-I) or as per tender condition.
2 Contractor has to construct pucca Go down at site of work so that cement bags can be properly
preserved to avoid damage due to any kind of water/Humidity.
3 Contractor has to bring sufficient quantities of cement bags to maintain progress of work. The
work should not suffer for want of cement.
4 Cement should be used to achieve required strength in cement concrete or as per item
proportion.
5 To bring sufficient & timely cement at site is full responsibility of contractor. Nothing extra will
be paid on account of any reason to maintain progress of work and to complete the work in
schedule time.
6 Contractor has to submit material A/c. For consumption of cement used with every bills. In
case of not submitting the same, bill will not be passed. Party has to submit the copy of cement
purchased bill and Challan/invoice along with each RA Bill/Final Bill.
7 No negative variation will be allowed for consumption in cement less then prescribed as per R &
B SoR OR Corporation/mix design and nothing will be paid extra for over consumption.
8 Contractor is fully responsible for safety of cement at site; nothing will be paid extra on account
of safety.
9 If Corporation’s authorized representative wants to check cement stock at site, contractor has to
allow for the same at any time.
10 Contractor has to maintain day to day cement consumption / balance account at site.
11 As far as possible, contractor has to maintain supply of cement of only one brand & grade
throughout the work and on account of closer/shortage of approved brand, cement of other
brand in accordance of condition No. (1) Will be allowed by Engineer – in – Charge.
12 Minimum cement consumption considered for cement concrete having grade of M–15 / M – 20 /
M – 25 / is 320 Kgs. / 375 Kgs / 400 Kgs. respectively. Contractor has to use minimum cement
as above. Contractor should not use less than the prescribed quantities of cement even in the
case of mix design recommends lower quality. For other items cement consumption shall be as
per provisions of SoR without any negative variation. Nothing will be paid extra for over
consumption.
13 Contractor will be allowed to carry out work only after physical verification of cement brought at
14 Full cement bags brought by contractor shall be entered at IN GATE of GANDHINAGAR TPS.
EW- 269 PUR-F-006 RFQ-75871
Approved name of Manufacturers: Allowing using steel cementing
being supplied by contractors in civil works
Sr. Name of approved Cement Sr. Name of Approved Steel
No. Company & their Brand Name in No Manufacturers & their Brand Name
Market in Market
1 A.C.C. Cement A.C.C. 1 Tata Iron & Steel TATA
2 Ambuja Cement Ambuja 2 Jindal JINDAL
3 Binani Cement Binani 3 Lloyds Lloyds
4 Birla Cement Birla A-1 4 Essar Steel Ltd. Essar
5 Gujarat Sidhee Sidhee 5 Steel Authority of SAIL
Cement India.
6 J.K. Cement J.K. 6 Parmeshwar Steel God TMT
7 J.K. Laxmi Cement J.K. Laxmi 7 Gallant Ispat Ltd. Gallant TMX
8 Sanghi Cement Sanghi 8 Aditya Ultra Steel KAMDHENU
Pvt. Ltd. NXT& Kay
9 Saurastra Cement Hathi 9 Mono steel India MONO TMT
10 Shree Digvijay KAMAL 10 Aashiana Rolling Friends Steel
Cement Mills Ltd.
11 India Cement Corromandal 11 Electro Therm (I) ET TMT
King Ltd.
12 Ultratech Cement Ultra-tech 12 H.K Ispat Pvt Ltd Kothi
13 HI-BOND Cement HI-BOND 13 SRJ peety steel Pvt. Shree Om
Ltd. TMT/ SRJ
TMT/ Kapila
Pune steel
14 Shree Cement Ltd Shree/Bangur 14 Nilkanth Concast Nilkanth
/Rock Private
strong/Roofo Limited
n/Bangur 15 Shreeyam Power & National
Power Steel
Industries Limited
16 Utkarsh Bars Utkarsh
Private Limited
CONSTRUCTION CHEMICALS 17 Bhagyalaxmi Polad
Rolling Mill Pvt. Ltd
1 Red-Wop Rajkot 18 Shri Khatu Shyam Khatu TMT
Alloys Pvt.
2 Samrock Chemicals Ahmedabad 19 Steefo Steels LLP, STEEFO TMT
20 Haq Steel & GERMAN TMX
Metaliks Ltd. Kutch
Water Proofing 21 K.B. Ispat Private KB TMT
& Wrapping Coating Ltd.,
1 Bitumag Industries Vadodara 22 VMS TMT Private KAMDHENU
Ltd., NXT& Kay
Ahmedabad TMT
2 A.R. Industries Vadodara 23 Briskon Multi Sabarkantha
metals LLP
3 Tiki tar Danosa Halol 24 Kalika Steel Alloys KALIKA
(India) Pvt Ltd Pvt Ltd. Jalna TMT
4 STP Ltd Ankleshwar 25 Anjar TMT steel pvt Welspun
Flooring Tiles 26 Shri Bajrang Power Goel TMT &
EW- 269 PUR-F-006 RFQ-75871
& Ispat Ltd Pipes
27 Rajuri steels & TMT Rajuri steel
Bars Pvt Ltd
28 SMW steel Sangam
1 Asian Granito Himatnagar 29 Rathi steel & Metal Icon steel
2 Somany Kaloal 30 Metarolls Ispat Pvt Metarolls TMT
3 Simpolo Morbi
4 Varmora Morbi
5 Sunheart Morbi
6 Emcer Morbi
7 Cengres Ahmedabad
In addition to the above Approved Vendor List of GSECL, the approved vendor list
of GUVNL and its subsidiary company i.e. GSECL/GETCO/MGVCL
/PGVCL/DGVCL & UGVCL which are available on their website- in tender head
including above mention various manufacturers are also to be treated as Approved
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
EW- 269 PUR-F-006 RFQ-75871
GENERAL SPECIFICATIONS
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as
directed”/”approved” by the Engineer-in-charge.
02. Wherever a reference to any Indian Standard appears in the specifications, it shall
be taken to mean as a reference to the latest edition of the same in force on the
date of agreement.
03. In “Mode of Measurement” in the specification wherever a dispute arises in the
absence of specific mention of a particular point or aspect, the provisions on these
particular points or aspects in the relevant Indian Standards shall be referred to.
04. All measurements and computations, unless otherwise specified, shall be carried
out as per Latest IS:
05. The distance which constitutes lead shall be determined along the shortest
practical route and not necessarily the route actually taken. The decision of the
Engineer-in-charge in this regard shall be taken as final.
06. Where no lead is specified, it shall mean “all leads”.
07. Lift shall be measured from plinth level.
08. Up to “floor two levels” means actual height of floor up to 6.5 Mt. Above plinth level.
09. Definite particulars covered in the items of work, though not mentioned or
elucidated in it, specification shall be deemed to be included therein.
10. Reference to specifications of materials as made in the detailed specification of the
items of work is in the form of a designation containing the number of the
specification of the material and prefix ‘M’ e.g. ‘M-5’.
11. Approval to the samples of various materials given by the Engineer-in-charge shall
not absolve the contractor from the responsibility of replacing defective material
brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on
account of any such materials being rejected by the Engineer-in-charge.
12. The contract rate of the item of work shall be for the work completed in all respects.
13. No collection of materials shall be made before it is got approved from the Engineer-
in-charge.
14. Collection of approved materials shall be done at site of work in a systematic
manner. Materials shall be stored in such a manner as to prevent damage,
deterioration or intrusion of foreign matter and to ensure the preservation of their
quality and fitness for the work.
15. Cement, reinforcements bars & all other materials to be used shall be got approved
from EIC before starting of work. The cement, reinforcement steel & other materials
to be brought at site shall be entered at GANDHINAGAR, TPS main entry gate.
16. Materials, if and when rejected by the Engineer-in-charge, shall be immediately
removed from the site of work.
17. No materials shall be stored prior to, during and after execution of a structure in
such a way as to cause or lead to damage or overloading of the various components
of the structure.
18. All works shall be carried out in a workmanlike manner as per the best techniques
for the particular item.
19. All tools, templates, machinery and equipment for correct execution of the work as
well as for checking lines, levels, alignment of the works during execution shall be
kept in sufficient numbers and in good working condition on the site of the work.
20. The mode, procedure and manner of execution shall be such that it does not cause
damage or over loading of the various components of the structure during
execution or after completion of the structure.
21. Special modes of construction not adopted in general Engineering practice, if
proposed to be adopted by the Contractor, shall be considered only if the contractor
provides satisfactory evidence that such special mode of construction is safe, sound
and helps in speedy construction and completion of work to the required strength
and quality. Acceptance of the same by the Engineer-in-charge shall not, however,
absolve the contractor of the responsibility of any adverse effects and consequences
of adopting the same in the course of execution of completion of the work.
EW- 269 PUR-F-006 RFQ-75871
22. All installations pertaining to water supply and fixtures thereof as well as drainage
lines and sanitary fittings shall be deemed to be completed only after giving
satisfactory tests by the Contractor.
23. The contractor shall be responsible for observing the rules and regulations imposed
under ‘Minor Minerals Act’ and such other laws and rules prescribed by
Government from time to time.
24. All necessary safety measures and precaution [including those laid down in the
various relevant Indian Standards shall be taken to ensure the safety of men,
materials and machinery on the works as also of the work itself.
25. The testing charge of all materials shall be borne by the Contractor unless recovery
at one percent towards using charges is separately made.
26. Approval to any of the executed items for the work does not in any way relieves the
contractor of his responsibility for the correctness, soundness and strength of the
structure as the drawings and specification.
ELECTRICAL TERMS & CONDTIONS
1) If supply and works are not completed within stipulated time period then
penalty at the rate of 0.5 % of the pending supply & work per week will be charged
& limited up to 10 % of respected value.
2) Quantity shown in schedule-B is approximate and may change. Payment will
be made as per actual works execution. No separate payment shall be done for the
supplied items only but contractor shall have to submit supply items bill in each
RA bill corresponding to actual work done.
3) Sample should be got approved before bulk supply for wires, JB, luminaries,
receptacles, flexible GI pipes, sleeves and fixtures and LED etc. the material
supplied should be of ISI marked, standard make with latest batch number.
Contractor has to produce guarantee certificate and test report of the OEM items
along with the supply.
4) Bidders are advised to visit GTPS site in his interest on his own before bidding
so as to make themselves conversant with actual site condition .Any change in
rate /term and condition at later stage/execution stage shall not be entertained.
5) Party shall have to make his own arrangement for storing the material in safe
custody. Removed material is to stack properly item wise and to credit it at main
store is in the contractor scope.
6) All tools and tackles welding machine, drilling machine, screw driver, testers
and safety appliances etc for this work shall be arranged by the contractor.
7) Contractor will have to provide responsible persons contact number at site and
at office whom we should contact as & when GSECL need to discuss any work
related matter during work execution. He should be conversant with this type of
industrial wiring work and capable to communicate and coordinate the matter.
8) Contractor shall be responsible for any kind of accident, loss occurs to their
staff, tools/tackles and / or damage is done to GSECL properties during work
execution. Any loss to GSECL property will be recovered from contractor bill.
9) Contractor has to follow the safety rules of GOG and GSECL, prevailing labor
laws & factory rules in force.
10) The required material such as angles, channels for fabrication will be provided
by GSECL if possible during work execution otherwise contractor has to arrange it
at no extra cost.
11) Power supply for this work will be provided free of cost by GSECL at one point
only and any supply extension required for work will be extended by contractor
with permission of safety officer and with all required safety precaution like
ELCB/RCBO/RCB etc.
12) Accommodation facility will be provided by GSECL on chargeable basis, if
available.
13) The party has to arrange for 24V transformer / battery torches, to be utilized
as safety equipment while carrying out work inside of equipments at higher
EW- 269 PUR-F-006 RFQ-75871
elevation. The party has to provide required capacity ELCB on welding machine.
14) Safety Rule: Incase of injury /accident while working, it shall immediately be
reported to safety department through EIC. The prescribed form no. 21 may be
obtained from EIC or safety officer. For any incident occurred but have no injury
to any persons should be informed to safety officer as near miss incident.
Contractor shall have invariably to submit ?Fitness certificate? of the working
staff from qualified doctors having qualification of minimum MBBS to the EIC &
safety officer before reporting to the work.
15) All consumables, like cotton waste, kerosene, diesel / rustolene, welding
electrodes, Oxy-acetylene/ gas shall be arranged by the party at his own cost.
16) Routine & Minor workshop facility will be provided by GSECL at free of cost. In
case, if any special job work require help from outside agency, the same will be
arranged by party at their own cost.
17) The contractor shall execute an Agreement on stamp paper of Rs. 300/- &
Indemnity bond on stamp paper of Rs. 300/- in prescribed form before
commencement of the work. The cost of stamp papers will be borne by the party.
18) Contractor shall have to pay Security Deposit @ 10 % of the order value within
10 days from the date of issue of L.O.I. The amount of SD shall be retained by
GSECL till completion of Guarantee period.
19) The guarantee period against poor workmanship along with supplied materials
is 12 months from date of successful completion of the work.
20) Electrical Supply For Work Execution
(A) Electrical connection and energy charges will be supplied by GSECL free of
(B)The bidder will have to lay required cable , wire in proper way from the allotted
power supply only using proper lugging, connectors. No material will be issued by
(C)Electrical connection will be given at one point only, further extension will be
done by party.
(D)Necessary required MCB/ELCB/RCCB/RCBO/SFU protection should provide,
connection will be release only after checking by EIC.
(E)All electrical safety care should be taken by party. Any damage to GSECL
power supply due to overload/short circuit etc while using should be repair at
party expense.
(F)Power supply taken from any where other source than allotted connection is
strictly prohibited. Penalty will be imposed as per GSECL rules.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
TECHNICAL SPECIFICATIONS
slab in auxiliary buildings at GTPS
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as
directed”/”approved” by the Engineer-in-charge.
02. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects - the relevant Indian Standards shall be referred to.
03. All measurements and computations, unless otherwise specified, shall be carried out
nearest to the following limits:
a. Length, width and depth (height) -----------0.01 Meter.
b. Areas-------------------------------------------- 0.01 sq Mt.
c. Cubic Contents-------------------------------- 0.01 Cu. Mt.
04. The distance which constitutes lead shall be determined along the shortest practical
route and not necessarily the route actually taken. The decision of the Engineer-in-charge in
this regard shall be taken as final.
05. Where no lead is specified, it shall mean “all leads”.
06. Lift shall be measured from plinth level.
07. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the material and
prefix ‘M’ e.g. ‘M-5’.
08. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to
any payment or compensation whatsoever on account of any such materials being rejected by the
Engineer-in-charge.
09. The contract rate of the item of work shall be for the work completed in all respects.
10. No collection of materials shall be made before it is got approved from the Engineer-in-
11. Collection of approved materials shall be done at site of work in a systematic & sequantial
manner. Materials shall be stored in such a manner as to prevent damage, deterioration or
intrusion of foreign matter and to ensure the preservation of their quality and fitness for the work.
12. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work.
13. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
14. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory evidence
that such special mode of construction is safe, sound and helps in speedy construction and
completion of work to the required strength and quality. Acceptance of the same by the Engineer-
in-charge shall not, however, absolve the contractor of the responsibility of any adverse effects and
consequences of adopting the same in the course of execution of completion of the work.
15. All installations pertaining to water supply and fixtures thereof as well as drainage lines
and sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
Contractor.
16. The contractor shall be responsible for observing the rules and regulations imposed under
‘Minor Minerals Act’ and such other laws and rules prescribed by Government from time to time.
17. The testing charge of all materials shall be borne by the Contractor & reports of authorize
laboratory shall be submitted timely.
18. Approval to any of the executed items for the work does not in any way relieves the
contractor of his responsibility for the correctness, soundness and strength of the structure as per
the drawings and specification.
19. Due care at all the items shall be taken to see that no damage is caused to the existing
setup of GSECL. In case of any such damage is caused, it shall be restored by the agency at his
NOTE: BOOKLET FOR “GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS” OF
R. & B. DEPARTMENT, GOG, GUJARAT AND BOOKLET OF “GENERAL SPECIFICATION FOR
CIVIL WORKS” OF GSECL WILL BE AVAILABLE IN CIVIL OFFICE AT GANDHINAGAR TPS
FOR REFERNCE OF RELEVANT DETAIL SPECIFICATIONS OF ITEMS. SHALL BE
CONSIDERED & ADOPTED IN WORK.
EW- 269 PUR-F-006 RFQ-75871
DETAILED TECHNICAL SPECIFICATIONS
RCC Roof slab in auxiliary buildings at GTPS”
Item No.1: Removing of existing Bitumen waterproofing membrane including
stacking of serviceable materials and disposal of unserviceable materials with
all lead and lift per requirement and including tools & Tackles.
As per detailed item description and as per directed by Engineer In Charge.
ITEM No.2: Prepare the surface thoroughly by apply grinding on surface and
open all crack and joint should be filed with using Non shrink grout Dr Fixit
Pidigrout 10M cleaning, washing and removing dust, dirt, oil, grease and loose
particles. Damaged or hollow portions, sharp edges, etc. must be cut and
repaired if required.
As per detailed item description and as per directed by Engineer In Charge.
ITEM No.3: Providing and applying Dr Fixit roof seal ultra waterproofing
(consumption of 1.5 kg/smt.) on roof slab and different junctions at roof slab.
(a) Apply first coat of Dr Fixit prim seal on surface with dilution of 1:0.5 with
water by brush or roller (c) After apply first coat apply second coat of Dr Fixit
roof seal ultra UV stable membrane white coating on roof slab with interval of
12 hour on entire surface properly by brush or roller (d) Surface should be
touch dry within 2 hour.
As per detailed item description and as per directed by Engineer In Charge.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
SECTION –H
SCHEDULE - B
waterproofing on RCC Roof slab in auxiliary buildings at GTPS”
(Price Bid should be submitted by bidders directly online. Bidder
should not submit physical Price Bid.)
EW- 269 PUR-F-006 RFQ-75871
GUJARAT STATE ELECTRICAL CORPORATION LIMITED
THERMAL POWER STATION GHANDHINAGAR
SCHEDULE:B
slab in auxiliary buildings at GTPS”
Item Description of Item Quantity Rate Unit Amount
1 Removing of existing Bitumen 3900.00 SMT
waterproofing membrane
including stacking of serviceable
materials and disposal of
unserviceable materials with all
lead and lift per requirement
and including tools & Tackles.
2 Prepare the surface 3900.00 SMT
thoroughly by apply grinding
on surface and open all
crack and joint should be
filed with using Non shrink
grout Dr Fixit Pidigrout 10M
cleaning, washing and
removing dust, dirt, oil,
grease and loose particles.
Damaged or hollow portions,
sharp edges, etc. must be
cut and repaired if required.
3 Providing and applying Dr Fixit 3900.00 SMT
roof seal ultra waterproofing
(consumption of 1.5 kg/smt.)
on roof slab and different
junctions at roof slab. (a) Apply
first coat of Dr Fixit prim seal
on surface with dilution of
1:0.5 with water by brush or
roller (c) After apply first coat
apply second coat of Dr Fixit
roof seal ultra UV stable
membrane white coating on
roof slab with interval of
hour on entire surface properly
by brush or roller (d) Surface
should be touch dry within
Total Estimate Amount Rs. ……………………
GOODS AND SERVICE TEX:-
The GST rate will be paid extra as applicable in accordance with GST rules party shall have to
raise the invoice in duplicate as per GST rules.
The supplier/contractor should mention separate HSN/SAC code and rate of GST and cess as
applicable for each item of goods/services. If no specifically mentioned then company will have
option to take the prices as exclusive of taxes and duties at maximum higher slab rates for the
evaluation of tenders.
For Supply Portion Only:- Party shall have to quote their rates in Schedule “B” of price bid only
along with commercial terms and conditions. Applicable GST will be paid extra subject to
necessary information provided in Annexure 10A. All other charges, packing& forwarding
EW- 269 PUR-F-006 RFQ-75871
charges, freight, insurance, etc .should be inclusive in offered price on FOR GTPS basis.
The tender received after time and date specified in the tender notice, will not be accepted. Once
the offer submitted by the contractor before due date of submission, the contractor will not be
allowed to submit revised / additional/modified/ other after opening of technical bid.
(1) All commercial terms and condition along with price schedule is invariably indicated in price
(2) The contractor shall have to submit the attested copy of EPF code No. certificate received
from RPFC without fail otherwise tender will not be considered.
(3) All the bidders are requested to see and verify the documents of
a) General safety rules / norms” to be observed by the contractors
b) Additional terms and conditions regarding industrial law and other related matters for the
tender documents.
c) General rules and directions for the guidance of contractor booklet of GSECL, GTPS on our
website under heading of “Rules for Works” And confirm that all the above documents you have
verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules, Industrial Laws and
Contract Booklet (a, b & c as above) and accordingly submitted my/our offer.”
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 269 PUR-F-006 RFQ-75871
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663 Fax: 91-79-23217673,
e-mail: [email protected] ; Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Safe Maintenance Procedure
ceiling in control rooms and Misc Civil works of Unit # 3,4 & 5 at
1. Scope: “Providing and Fixing False Ceiling by removing existing false ceiling
in control rooms and Misc Civil works of Unit # 3,4 & 5 at GTPS.”
2. Isolation :
1. Prohibit work on new and existing live circuits until all power is shut off and a positive
permit to work system is in place.
2. Do not use worn electrical cords or cables.
3. Use only 3-wire type extension cords.
4. Maintain all electrical tools and equipment in safe condition and check regularly
for defects.
5. Remove broken or damaged tools and equipment from the jobsite.
6. Protect all temporary power (including extension cords) with circuit protection
7. Do not bypass any protection system or device designed to protect employees from
contact with electrical current.
8. Locate and identify overhead electrical power lines. Make sure that ladders,
scaffolds, equipment or materials never come into close proximity of electrical power
9. Unsafe hand tools should not be used.
10. Impact tools, such as drift pins, wedges, and chisels, should be kept free of
mushroomed heads.
11. The wooden handles of tools should be kept free of splinters or cracks and should
be kept tight and fit in the tool
12. Electric power operated tools should either be of the approved double-insulated
type and clearly labeled or properly grounded using approved three-wire cord having the
ground wire permanently connected to the tool frame as a means for grounding the other
13. All hydraulic or tools which are used on or around live power lines or equipment
should be equipped with suitable non-conducting hoses and properly maintained.
3. Work Procedure
(A) Disposal of building debris/waste/rubbish
1. Rubbish burning on worksites or cigarette butts left by workers igniting
combustible waste on site could cause fire.
2. Scrap wood or chips, saw dust waste, and paper bags or cartons should be
removed from the immediate work area as the work progresses.
3. All solvent waste, oily rags, and flammable liquids should be kept in fire resistant
covered containers until they are removed from the worksite.
(B) Safe access
1. provide stairways, ladders, ramps, or other safe means of egress to workplaces
such as working platforms position the means of egress within a reasonable distance
from workers use structural ramps solely for access or egress from excavations designed
by a competent person ensure that when two or more components form a ramp or
runway, they must be connected to prevent displacement
(C) Working platforms and Scaffolds
A contractor has to make and keep every place of work on construction site safe, and in
particular, to take suitable and adequate steps to prevent persons from falling from a
height of 2m or more from any of these structures
1. Provide safe access to and egress from all platforms.
EW- 269 PUR-F-006 RFQ-75871
2. Keep all work platforms free from load, such as construction wastes.
3. Suitably place platforms on sound base, such as scaffolds, to prevent
displacements.
4. Prevent movement or tipping, especially surface dirt of platforms.
5. Erect and dismantle scaffolds and platforms only under the supervision of a
competent person.
6. Each scaffold must be capable of supporting the load intended.
7. The competent person must inspect scaffolds before each use.
8. Use sound base plates to level or stabilize the footings.
(D) Planking
1. Closely plank a scaffold to provide a safe working platform. The working platform
decking must be free from patent defects.
2. Extend planks or decking material sufficiently over the edges or cleat them to
prevent displacement.
3. Avoid over extending the platform beyond the end supports to prevent tipping
when workers are stepping or working on it.
4. Avoid over extending the platform beyond the end supports to prevent tipping
when workers are stepping or working on it.
5. Be sure that working platforms are of a proper size and, for metal scaffolds, end
hooks are available and attached to the scaffold frame.
(E) Ladders
1. Secure ladders near the top and/or at the bottom to prevent them from slipping.
2. Place ladders at the proper angle (1:4 from base to vertical rise).
3. Extend ladders above the landing by 1 m.
4. Avoid using ladders near busy passageways or roads with busy car traffic, use
other means or otherwise fence off the area.
5. Keep ladders in good conditions and free of defects.
6. Check all ladders before use for broken rungs or other defects periodically.
(F) Cement and concrete Work
1. To protect skin from cement and cement grout, workers should wear:
2. suitable chemical resistant gloves
3. coveralls
4. waterproof boots
5. suitable respiratory protective equipment against dusts, e.g. cement dust
6. suitable eye protectors such as shields and goggles with side-shields should be
provided for mixing, grouting, or cement and other activities
(G) Working with solvents and paints
1. Don’t touch solvents and paints with bare hands. Wear protective gloves.
2. Don’t try to suck solvents and paints with your mouth. Use appropriate liquid
delivery tools.
3. Don’t use container with narrow opening as it traps heat and/or gases.
4. Don’t mix oxidizing agents with flammable/ combustible substances.
5. Don’t eat, drink and smoke while using solvents and paints.
4 Reporting
Contractor supervisor reported to consult department site in charge engineer. After
completion of work all man and material removing from site and cleaning site as per
direct site in charge.
EW- 269 PUR-F-006 RFQ-75871
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF PPES
(PERSONNEL PROTECTIVE EQUIPMENTS)
Ref.: Tender no.:
Authorized signatory of M/s
Sr. No. Name of PPE IS: Code no. of PPE Make of PPE Qty Unit
1 Safety Helmet Nos.
2 Safety Goggles Nos.
3 Reusable ear Plug Pair
4 Dust Mask Nos.
5 Safety Shoes Pair
6 Hand Gloves Pair
7 Gum Boots Pair
lf our company is not provided above mentioned good quality of PPE's, Safety Officer and
Factory manager shall be empowered to stop the work without any notice.
Seal of the Firm
Signature of Authorized signatory
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-269_18_03_2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .