Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC | L1 | Accepted-AOC Below Rate | |
| 2 | L2₹21.5 L+₹15,316.44 (0.72%)Rejected-AOC | L2 | Rejected-AOC Above Rate |
Tender Value
₹21.9 L
EMD Value
₹21,950
Closing Date
11 Mar 2024, 3:00 pmClosed
Block Development Officer(B.P)
Block Development office, K.Paramathai Block
Renewal of the Road From Punnam Bharathi Nagar to Sadaiyampalayam Via Punnam Panchayat Boundary End H/o Punnam Pt (CH 0/0-1/500)
2024_RDTN_444890_2
K.Paramathi Block - PUGF - 2023-24
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Item Rate
90 days
K.Paramathi Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,950
6 Aug 2025
8 Mar 2024
11 Mar 2024
8 Mar 2024
11 Mar 2024
8 Mar 2024
Amount
Name of the Work : Renewal of the Road From Punnam Bharathi Nagar to Sadaiyampalayam Via Punnam Panchayat Boundary End H/o Punnam Pt (CH 0/0-1/500
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Providing and Laying Gravel Soiling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting etc.,
Applying TACK COAT over BT surface (not treated with primer) using 3.00kg of Bitumen Emulsion / 10 sq.m including labour for spraying , hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminious concrete to 25mm thiock using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG 30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density.
Cost of HM Stone
Provision for KM Stone
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
VELAVA CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .