Tender Value
₹20.2 Cr
EMD Value
₹20.2 L
Closing Date
17 Jul 2026, 6:00 pm
Executive Engineer, P. H.W. Division, Radhanpur
Comprehensive Operation and Maintenance of Civil and Electromechanical assets such as intake wells structures, HR on NMC Canal , elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant (Satun 60.00 mld and Zazam 6.00 mld ), chemical house, staff quarters, pump house, all bulk transmission and distribution pipelines, valves,all Head works, TW,Canal pumping machinery and electrical equipment etc. for the Radhanpur-Santalpur RWSS water supply scheme s, including supply of potable water to all the 126 villages 11 habitations 1 towns for 60 months period. Taluka: Radhanapur, Santlapur, District: Patan based on NMC at Rankpur HW. Including supply of chlorine gas and PAC 10 percentage Liquid. (Excluding the cost of Electricity Bill, Raw Water Charges, All type of Pipes, Sluice Valves, Air Valves)
314646
02 of 2026-27
Open
Civil Works - Water Works
Patan
6 documents required · 6 mandatory
₹18,000
Executive Engineer, P. H. Works Division, GWSSB, Radhanpur
₹20.2 L
17 Jun 2026
17 Jun 2026
17 Jun 2026
17 Jul 2026
17 Jun 2026
Estimated Cost: - Rs.
Zone –2Ahmedabad
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
BID DOCUMENTS For Comprehensive Operation & Maintenance of Civil &
Electromechanical assets such as intake wells structures, HR on NMC Canal,
elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant (Satun
mld & Zazam 6.00 mld ), chemical house, staff quarters, pump house, all bulk
transmission and distribution pipelines, valves, all Head works, TW, Canal pumping
machinery & electrical equipment etc. for the Radhanpur & Santalpur RWSS water
supply schemes, including supply of potable water to all the 126 villages/11
habitations/1 towns for 60 months period. Taluka: Radhanapur, Santlapur, District:
Patan based on NMC at Rankpur hw. Including supply of chlorine gas & PAC 10%
Liquid. (Excluding the cost of Electricity Bill, Raw Water Charges, All type of Pipes,
Sluice Valves, air Valves).
BREAK UP FOR INTERIM PAYMENTS .......... Error! Bookmark not defined.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Name of work: “Comprehensive Operation & Maintenance of Civil & Electromechanical
assets such as intake wells structures, HR on NMC Canal, elevated service reservoirs
(E.S.R), HGLR, sump, water treatment plant (Satun 60.00 mld & Zazam 6.00 mld ),
chemical house, staff quarters, pump house, all bulk transmission and distribution
pipelines, valves, all Head works, TW, Canal pumping machinery & electrical
equipment etc. for the Radhanpur & Santalpur RWSS water supply schemes,
including supply of potable water to all the 126 villages/11 habitations/1 towns for
60 months period. Taluka: Radhanapur, Santlapur, District: Patan based on NMC at
Rankpur hw. Including supply of chlorine gas & PAC 10% Liquid. (Excluding the cost
of Electricity Bill, Raw Water Charges, All type of Pipes, Sluice Valves, air Valves).”
1. The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
2. The rates and prices shall be submitted in the electronic formats given by n-procure which
is called Schedule-B rates and prices received in any other formats will be rejected and the
Bids will be disqualified.
3. It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall Not be permitted to
withdraw his bid on this account.
supplied from the by client.
5. In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as called
for against the BOQ item.
B only will be considered for price evaluation & shall form a part of the Contract
8. The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder shall
give year wise break up of cost for 5 years O&M in Schedule-C separately for Schedule-C.
The total shall be in line to the price quoted in Schedule-C. The total shall be carried
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
forward to Schedule-B for comparison and evaluation.
9. Wherever for a particular item the quantities have been specified payment shall be on unit
rate basis and unit variation in quantity will be paid with pro rata basis.
10. Each item is to be individually priced online and the amounts shall be added up to arrive at
except where the item description requires the item to be priced on "as applicable” basis.
The item shall Not be priced if it is “Not applicable” to the bidder’s design, in which case
the bidder shall add the words “NOT APPLICABLE”. The wording in the item description is
for subject matter guidance only; clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the works covered
under the bid and all liabilities and contractual obligations whether separately specified or
not. Items against which No prices are quoted shall Not be separately paid for and the
bidder shall be deemed to have covered the cost of execution of such items (according to
the requirements of the bid document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will Not be separately paid for by
the Employer when executed and shall be deemed to be already covered by other items
and rates listed in the price sheets No extra payment shall be given for any item which is
required to complete and perform the project.
after carried over and arithmetic corrections if any will be considered for financial
evaluation of the bid.
13. Schedule ‘D gives the basis of interim payment for construction of civil works.
14. The bidder shall be deemed to have allowed in his price for provision, maintenance and
final removal of all temporary works of whatsoever nature required for construction
including temporary bunds, diverting water, pumping, de-watering etc. for the proper
execution of works. The rates shall also be deemed to include any works and setting out
that may be required to be carried out for laying out of all the works involved.
15. Prices shall be filled online only.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Specifications and other sections of these bid documents and these documents are to be
taken as mutually explanatory of one another.
17. The bidder shall interpret the data furnished and carry out any additional survey work, or
investigation work required at his own cost.
18. The prices quoted shall also include the cost of materials utilized for testing.
19. The bidder should acquaint himself with the site conditions including the access to Work
site. The successful bidder shall have to make suitable access to work sites at his own cost.
These accesses will be used by the other contractors working for GWSSB.
shall include all the equipment’s / materials / accessories and services required as per the
21. The Amount to be Quoted for O & M /Year Shall be As per Volume -1, Technical Bid,
General Condition of Contract Clause No.1 Security Deposit.
22. 1% of the value of work will be deducted from the Running bill against labour cess which is
non-refundable.
23. Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the same
will be borne by GWSSB.
24. Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to misinformation
shall be recovered from the contractor.
25. The rates to be quoted by the Contractor must be exclusive of GST but inclusive of all
other taxes. GST should be paid extra on the admissible payment as per the approved
tender rates and condition of price variation; GST should be paid as per prevailing rates at
the time of payment. The TDS as per provision of IT rules and GWSSB policy.
26. The rates Should be quoted exclusive of GST but inclusive of all other taxes as per Volume -
1, Technical Bid, General Condition of Contract Clause No.16.3. Rates to be exclusive of
GST but inclusive of all other taxes.
27. The process requires that the bidder shall quote his price for the work components
during the entire period of performance of the contract except price variation allowed for
supply of MS/DI/PVC/HDPE pipe as per Volume-II (A), General Conditions of Contract.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
28. Payment shall be made for the components for which lump sum prices are quoted, as per
the schedule of payment. Total cost will be worked out on the basis of work done of
individual items and rates quoted against those particular items only.
29. Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the industries mines
department sachivalay Gandhinagar Dt. 18/06/2016 (English Version Copy enclosed) and
shall be recovered from the running bills of the work from time to time and remaining
amount if any shall be recovered from the final bill before releasing the security deposit of
the work. The contractor shall furnish the statement showing the quantity of quarried
materials / minerals from whom purchased (with full address of the seller) and copies of
the bills for purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty payment to the
competent authority.
30. Agency shall have to take Insurance policy and intimate to GWSSB along with the evidence
within time limit. In case of Noncompliance entire responsibility shall be rest with the
agency and required amount shall be recovered from any due amount of the agency.
31. GWSSB can recover penalty amount from the agency for Not taking the insurance. Though
the penalty amount is recovered, responsibility of the agency for taking insurance shall be
continued and will Not be escaped from the responsibility.
32. The contractor shall apply fair means of stock maintenance and shall adopt accounting
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be open
for the Board to ask for original invoices, lorry receipt, weigh bridge slips, payment details
and such other documents as may be required for the purpose.
The claim of contractor regarding GST shall have to be backed by documentary evidence
substantiating the actual payment of tax duly certified by the competent tax authority. The
final decision regarding the quantum of the claim amount to be recovered or reimbursed shall
be of the competent authority of the GWSSB and shall be binding on the contractor.
Signature of Contractor Executive Engineer
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Bidders are required to fill up all the blank spaces in this Bid Form.
The Executive Engineer
Public Health Works Division,
SUB : “Comprehensive Operation & Maintenance of Civil & Electromechanical assets
such as intake wells structures, HR on NMC Canal, elevated service reservoirs (E.S.R),
HGLR, sump, water treatment plant (Satun 60.00 mld & Zazam 6.00 mld ), chemical
house, staff quarters, pump house, all bulk transmission and distribution pipelines,
valves, all Head works, TW, Canal pumping machinery & electrical equipment etc. for
the Radhanpur & Santalpur RWSS water supply schemes, including supply of
potable water to all the 126 villages/11 habitations/1 towns for 60 months period.
Taluka: Radhanapur, Santlapur, District: Patan based on NMC at Rankpur hw.
Including supply of chlorine gas & PAC 10% Liquid. (Excluding the cost of Electricity
Bill, Raw Water Charges, All type of Pipes, Sluice Valves, air Valves).”
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda / Amendments to the above, for the execution of the above Contract, we
the undersigned offer to Design, Engineer, Procure, Construct, Complete, Commission,
operate, maintain and Run the whole of the said works for 60 Months from the date of
commissioning including defects liability period as given in Conditions of Contract and in
conformity with the drawings, conditions of Contract, specifications, Preamble to Price
Nos.____________________(insert numbers) for Lump sum fixed price of
Construction including free trial run (If Applicable) for One Month or such other sum as may
be ascertained in accordance with the conditions.
2. I / We agree that
(a) If we fail to provide required facilities to the Employer’s representative or any other
person / Agency by the Employer to perform on his behalf for carrying out the inspection
and testing of materials and workmanship.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
(b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver pure water of required quantity according to the conditions /
stipulations of the Contract, the Engineer will be at liberty to take any action including
termination of Contract and impose at his absolute discretion any penalties, and / or
reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract with in ......... Months, inclusive of monsoons, from the date or receipt of
Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the last date of submission of
bid and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement
is prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance Security in the forms and of value
specified in the Clause 1 of Volume-IB, General Conditions of Contract.
7. We have independently considered the amounts of liquidated damages shown in Appendix to
Bid and agree that they represent a fair estimate of the damages likely to be suffered by
you in the event of the work Not being completed by us in time.
8. We understand that you are Not bound to accept the lowest or any bid you may receive.
(Name of the person)
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of (Fill in block capitals)
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
GUJARAT WATERSUPPLY & SEWERAGE BOARD GANDHINAGAR
Name of Work:- “Comprehensive Operation & Maintenance of Civil & Electromechanical
assets such as intake wells structures, HR on NMC Canal, elevated service reservoirs
(E.S.R), HGLR, sump, water treatment plant (Satun 60.00 mld & Zazam 6.00 mld ),
chemical house, staff quarters, pump house, all bulk transmission and distribution
pipelines, valves, all Head works, TW,Canal pumping machinery & electrical
equipment etc. for the Radhanpur & Santalpur RWSS water supply schemes,
including supply of potable water to all the 126 villages/11 habitations/1 towns for
60 months period. Taluka: Radhanapur, Santlapur, District: Patan based on NMC at
Rankpur hw. Including supply of chlorine gas & PAC 10% Liquid. (Excluding the cost of
Electricity Bill, Raw Water Charges, All type of Pipes, Sluice Valves, air Valves).”
Sr. Particulars Quantity Unit Rate at Which the Place of
No materials will be charged Delivery
1 Pipes As RMT Free of Cost RMT Departmental Store
required or Head Works / Sub
2 Valves As No. Free of Cost No.
3 Sub Pump Set As No. Free of Cost No. ---Do—Do--
4 G.I.Column Pipe As RMT Free of Cost RMT ---Do—Do--
5 Flat PVC Cable As RMT. Free of Cost RMT. ---Do—Do--
6 Control Panel Board As No. Free of Cost No. ---Do—Do--
1 The Contractor submitting the tender should see that the rate in Schedule - A (of tender documents) are
filled by the Engineer in charge prior of the time of issue of tender.
2 Any additional materials to be supplied free of cost as per Schedule-A if found necessary at the time of
execution will be supplied to the contractor free of cost.
3 Any materials other than that provided in Schedule-A if required for the labour items of Schedule-B issued
on request to the contractor provided the same are available with department at prevailing market rate or
department issue rate whichever is higher.
4 The contractor shall provide his own arrangement at his own cost for loading, unloading and transport to
the site of work for the material stipulated in Schedule-A.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
5 Those works will be executed which are found necessary at the time of execution, contractor will not be
entitle for any claim for saving in any items as per site condition.
6 The rate of recovery for short fall or damage of material issued free of cost will be present S.O.R. plus 3%
storage charge or rates of Board R/C Plus 3 % storage whichever is higher.
7 No negotiation at present in from and hence contractor should quote their rates accordingly.
8 The sub contract, if any given by the contractor would not create any right against the Board.
9 The Amount Recoverable from the contractor by the Gujarat water supply and sewerage board on any
account shall be liable to be recovered from the amount payable to the contractor / suppliers.
10 After passing the bill fund shall be demanded to higher authority payment shall be made after getting fund
from higher authority.
11 Labour Cess under the prevailing rules of the Government Resolution shall be borne by the bidder.
(Present rate is 1%).
12 Royalty on Minerals Consumed in works from End User under the prevailing rules of the Government
Industries mines department sachivalay Gandhinagar Dt. 18/06/2016 (English Version Copy enclosed)
shall be borne by the bidder.
Deputy Executive Engineer Deputy Executive Engineer Deputy Executive Engineer
P. H.Mech.Sub Division P. H.S.Sub Division P. H.S.Sub Division
Shankheshwar Radhanpur Varahi
Sign of Contractor Executive Engineer
P. H. Works Division
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
LIST FOR EQUIPMENTS/INSTRUMENTS REQUIRED FOR SITE OFFICE WORK
Item Description
Agency Has to Procure and must supply at site free of cost and hand over to Engineer in charge within
one month from date of work order given as under.
No. Description Nos Of item.
1 All In One Computer not less than 24 All-in-One QC24251 with Core
Ultra 35W CPU, Non-touch, FHD HDR Camera, Processor Intel®
Core™ Ultra 5 235T (13 TOPS NPU, 14 cores, up to 5.0GHz),
Windows 11 Pro Operating System, both preinstalled from brand
DELL, HP as approved by Engineer in Charge, Office of the,
Executive Engineer PH Works Division Radhanpur- 1.0Nos, DEE PH 03 Nos.
Sub Division Radhanpur -1Nos, DEE PH Sub Division Varahi -1Nos,
3 Multifunction Printer With 28 PPM Speed from brand like Canon, HP
or equivalent with all necessary accessories etc. 03 Nos.
Note: - all above item must be provide by Agency at free of cost.
Signature of Executive Engineer
Contractor P.H. Works Division
GWSSB RADHANPUR Page
NAME OF SCHEME: RADHANPUR & SANTALPUR RWSS TA: RADHANPUR, SANTALPUR, DIST: PATAN
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as intake wells
structures, HR on NMC Canal, elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant (Satun 60.00 mld &
Zazam 6.00 mld ), chemical house, staff quarters, pump house, all bulk transmission and distribution pipelines, valves, all
Head works, TW, Canal pumping machinery & electrical equipment etc. for the Radhanpur & Santalpur RWSS water supply
schemes, including supply of potable water to all the 126 villages/11 habitations/1 towns for 60 months period. Taluka:
Radhanapur, Santlapur, District: Patan based on NMC at Rankpur hw. Including supply of chlorine gas & PAC 10% Liquid.
(Excluding the cost of Electricity Bill, Raw Water Charges, All type of Pipes, Sluice Valves, air Valves,)
ITEM DESCRIPTION Qty. Unit Rate Amount
Comprehensive Operation & Maintenance of Civil & Electro-
mechanical assets such as intake wells structures, HR on NMC Canal,
elevated service reservoirs (E.S.R), HGLR, sump, water treatment
plant (Satun 60.00 mld & Zazam 6.00 mld ), chemical house, staff
quarters, pump house, all bulk transmission and distribution
pipelines, valves, all Head works, TW,Canal pumping machinery &
electrical equipment etc. for the Radhanpur-Santalpur RWSS water
supply schemes, including supply of potable water to all the
villages/11 habitations/1 towns for 60 months period. Taluka:
Radhanapur, Santlapur, District: Patan based on NMC at Rankpur hw.
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Maintenance activities, measured and paid separately such as
Chemical and Bacteriological Analysis, cleaning of reservoirs/tanks,
B procurement and replacement of filter media, providing PAC,
Chlorine gas etc. complete as per this tender document.
Providing, Supplying &Procurement and necessary dosing of PAC
10% Liquid for removing of turbidity from raw water. including all
2.0 taxes & Carting. Satun WTP (60 mld) & Zazam WTP (6 mld) in
Contract Period
1st Year 44,298.00 Liter 9.00
2nd Year 45,108.00 Liter 9.54
3rd Year 45,684.00 Liter 10.11
4th Year 46,548.00 Liter 10.72
5th Year 47,214.00 Liter 11.36
3.00 Refilling of Chlorine gas in Cylinder including transportation to and
from factory and back. 900kg Cylinder Satun WTP (60 mld) in
Contract Period
4.00 Refilling of Chlorine gas in Cylinder including transportation to and
from factory and back. 100kg Cylinder at All Sub Head Work, Zazam
WTP (6 mld) of Radhanpur and Santalpur Section
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Procurement & replacement of filter media: Effective size of filter
sand 0.45 to 0.70 mm uniformity coefficient not more than 1.7 nor
5.0 less than 1.3, depth of filter 0.75 M, freeboard 50 cm, gravel 0.45 M
in depth, sand and gravel conforming to IS: 8491(i)-77. in Filter bed of
required depth as per design and drawing inclusive of all lead Sand
5.1 (a) for 1st Year Satun WTP (60 MLD) 240.00 Cum 1,308.93
5.2 (b) for 1st Year Zazam WTP (6 MLD) 18.75 Cum 1,308.93
5.3 (c) For 4th Year Satun WTP (60 MLD) 240.00 Cum 1,558.950
5.4 (d) For 4th Year Zazam WTP (6 MLD) 18.75 Cum 1,558.950
Providing & supplying gravels of different size as per design and
6.0 drawing and laying in layers in filter beds Inclusive of all lead. (twice
in contract period) (30% Head Loss)
6.1 (a) for 1st Year Satun WTP (60 MLD) 144.00 Cum 1,308.930
6.2 (b) for 1st Year Zazam WTP (6 MLD) 11.25 Cum 1,308.930
6.3 (c) For 4th Year Satun WTP (60 MLD) 144.00 Cum 1,558.950
6.4 (d) For 4th Year Zazam WTP (6 MLD) 11.25 Cum 1,558.950
Labour charges for cleaning of sump / GL cistern with cleaning and
removing algea calcinations, sludge, dirt deposition from bottom and
7.0 as well as from wall of sump with necessary tools and plants
required including labours etc. with dis-infection by clorine powder
as required. etc. comp. Radhanpur Section & Santalpur Section
RANAKPUR OFFTEK Under Ground Sump 75 Lac Lit. - 1 Nos (Twice in
7.2 SATUN WTP Under Ground Sump 100 Lac Lit. - 1 Nos 1.00 No. 85,503.46
7.3 SATUN WTP Under Ground Sump 50 Lac Lit. - 1 Nos 1.00 No. 43,743.93
7.4 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 35,345.08
7.5 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 35,345.08
7.6 Satun wtprecycleaing Sump/ 6 lac litr 1.00 No. 6,065.95
7.7 DHARAVADI SUB H/W Under Ground Sump 10 Lac Lit. - 1 Nos 1.00 No. 9,332.65
7.8 DHARAVADI SUB H/W Under Ground Sump 5 Lac Lit. - 1 Nos 1.00 No. 5,599.58
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
7.9 SINAD SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 9,332.64
7.10 SHERGANJ SUB H/W Under Ground Sump 20 Lac Lit. 1.00 No. 18,196.84
7.11 SHERGANJ SUB H/W Under Ground Sump 3 Lac Lit. 1.00 No. 3,499.35
7.12 BHILOT SUB H/W Under Ground Sump 15 Lac. Lit. 1.00 No. 13,764.73
7.13 DAHISAR SUB H/W Under Ground Sump 17 Lac. Lit. 1.00 No. 16,330.32
7.14 MOTI PIPALI SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 22,397.28
7.15 GOTARKA SUB H/W Under Ground Sump 7.5 Lac Lit. 1.00 No. 7,466.12
7.16 VARAHI SUB H/W Under Ground Sump 20 Lac Lit. - 2 Nos 2.00 No. 18,196.83
7.17 ABIYANA SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 18,196.83
7.18 SIDHADA SUB H/W Under Ground Sump 15 Lac Lit. 1.00 No. 13,764.74
7.19 SIDHADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 9,332.63
7.20 SIDHADA SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 22,397.28
7.21 ZAZAM SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 18,196.83
7.22 ZAZAM WTP CLR/10 Lac Liter 1.00 No. 9,332.64
7.23 SANTALPUR SUB H/W Under Ground Sump 50 Lac Lit. 1.00 No. 43,743.93
7.24 KALYANPURA SUB H/W Under Ground Sump 8 Lac Lit. 1.00 No. 7,698.78
7.25 KALYANPURA SUB H/W Under Ground Sump 5 Lac Lit. 1.00 No. 5,599.58
7.26 DHOKAVADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 9,332.63
7.27 GARAMADI SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 9,332.63
RANAKPUR OFFTEK Under Ground Sump 75 Lac Lit. - 1 Nos (Twice in
7.2 SATUN WTP Under Ground Sump 100 Lac Lit. - 1 Nos 1.00 No. 90,633.67
7.3 SATUN WTP Under Ground Sump 50 Lac Lit. - 1 Nos 1.00 No. 46,368.57
7.4 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 37,465.78
7.5 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 37,465.78
7.6 Satun wtp re-cycleaing Sump/ 6 lac litr 1.00 No. 6,429.91
7.7 DHARAVADI SUB H/W Under Ground Sump 10 Lac Lit. - 1 Nos 1.00 No. 9,892.61
7.8 DHARAVADI SUB H/W Under Ground Sump 5 Lac Lit. - 1 Nos 1.00 No. 5,935.55
7.9 SINAD SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 9,892.60
7.10 SHERGANJ SUB H/W Under Ground Sump 20 Lac Lit. 1.00 No. 19,288.65
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
7.11 SHERGANJ SUB H/W Under Ground Sump 3 Lac Lit. 1.00 No. 3,709.31
7.12 BHILOT SUB H/W Under Ground Sump 15 Lac. Lit. 1.00 No. 14,590.61
7.13 DAHISAR SUB H/W Under Ground Sump 17 Lac. Lit. 1.00 No. 17,310.14
7.14 MOTI PIPALI SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 23,741.12
7.15 GOTARKA SUB H/W Under Ground Sump 7.5 Lac Lit. 1.00 No. 7,914.09
7.16 VARAHI SUB H/W Under Ground Sump 20 Lac Lit. - 2 Nos 2.00 No. 19,288.64
7.17 ABIYANA SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 19,288.64
7.18 SIDHADA SUB H/W Under Ground Sump 15 Lac Lit. 1.00 No. 14,590.62
7.19 SIDHADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 9,892.59
7.20 SIDHADA SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 23,741.12
7.21 ZAZAM SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 19,288.64
7.22 ZAZAM WTP CLR/10 Lac Liter 1.00 No. 9,892.60
7.23 SANTALPUR SUB H/W Under Ground Sump 50 Lac Lit. 1.00 No. 46,368.57
7.24 KALYANPURA SUB H/W Under Ground Sump 8 Lac Lit. 1.00 No. 8,160.71
7.25 KALYANPURA SUB H/W Under Ground Sump 5 Lac Lit. 1.00 No. 5,935.55
7.26 DHOKAVADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 9,892.59
7.27 GARAMADI SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 9,892.59
RANAKPUR OFFTEK Under Ground Sump 75 Lac Lit. - 1 Nos (Twice in
7.2 SATUN WTP Under Ground Sump 100 Lac Lit. - 1 Nos 1.00 No. 96,071.69
7.3 SATUN WTP Under Ground Sump 50 Lac Lit. - 1 Nos 1.00 No. 49,150.68
7.4 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 39,713.73
7.5 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 39,713.73
7.6 Satun wtp recycleaing Sump/ 6 lac litr 1.00 No. 6,815.70
7.7 DHARAVADI SUB H/W Under Ground Sump 10 Lac Lit. - 1 Nos 1.00 No. 10,486.17
7.8 DHARAVADI SUB H/W Under Ground Sump 5 Lac Lit. - 1 Nos 1.00 No. 6,291.68
7.9 SINAD SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 10,486.16
7.10 SHERGANJ SUB H/W Under Ground Sump 20 Lac Lit. 1.00 No. 20,445.97
7.11 SHERGANJ SUB H/W Under Ground Sump 3 Lac Lit. 1.00 No. 3,931.87
7.12 BHILOT SUB H/W Under Ground Sump 15 Lac. Lit. 1.00 No. 15,466.05
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
7.13 DAHISAR SUB H/W Under Ground Sump 17 Lac. Lit. 1.00 No. 18,348.75
7.14 MOTI PIPALI SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 25,165.59
7.15 GOTARKA SUB H/W Under Ground Sump 7.5 Lac Lit. 1.00 No. 8,388.94
7.16 VARAHI SUB H/W Under Ground Sump 20 Lac Lit. - 2 Nos 2.00 No. 20,445.96
7.17 ABIYANA SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 20,445.96
7.18 SIDHADA SUB H/W Under Ground Sump 15 Lac Lit. 1.00 No. 15,466.06
7.19 SIDHADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 10,486.15
7.20 SIDHADA SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 25,165.59
7.21 ZAZAM SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 20,445.96
7.22 ZAZAM WTP CLR/10 Lac Liter 1.00 No. 10,486.16
7.23 SANTALPUR SUB H/W Under Ground Sump 50 Lac Lit. 1.00 No. 49,150.68
7.24 KALYANPURA SUB H/W Under Ground Sump 8 Lac Lit. 1.00 No. 8,650.35
7.25 KALYANPURA SUB H/W Under Ground Sump 5 Lac Lit. 1.00 No. 6,291.68
7.26 DHOKAVADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 10,486.15
7.27 GARAMADI SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 10,486.15
RANAKPUR OFFTEK Under Ground Sump 75 Lac Lit. - 1 Nos (Twice in
7.2 SATUN WTP Under Ground Sump 100 Lac Lit. - 1 Nos 1.00 No. 1,01,835.99
7.3 SATUN WTP Under Ground Sump 50 Lac Lit. - 1 Nos 1.00 No. 52,099.72
7.4 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 42,096.55
7.5 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 42,096.55
7.6 Satun wtp recycleaing Sump/ 6 lac litr 1.00 No. 7,224.64
7.7 DHARAVADI SUB H/W Under Ground Sump 10 Lac Lit. - 1 Nos 1.00 No. 11,115.34
7.8 DHARAVADI SUB H/W Under Ground Sump 5 Lac Lit. - 1 Nos 1.00 No. 6,669.18
7.9 SINAD SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 11,115.33
7.10 SHERGANJ SUB H/W Under Ground Sump 20 Lac Lit. 1.00 No. 21,672.73
7.11 SHERGANJ SUB H/W Under Ground Sump 3 Lac Lit. 1.00 No. 4,167.78
7.12 BHILOT SUB H/W Under Ground Sump 15 Lac. Lit. 1.00 No. 16,394.01
7.13 DAHISAR SUB H/W Under Ground Sump 17 Lac. Lit. 1.00 No. 19,449.68
7.14 MOTI PIPALI SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 26,675.53
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
7.15 GOTARKA SUB H/W Under Ground Sump 7.5 Lac Lit. 1.00 No. 8,892.28
7.16 VARAHI SUB H/W Under Ground Sump 20 Lac Lit. - 2 Nos 2.00 No. 21,672.72
7.17 ABIYANA SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 21,672.72
7.18 SIDHADA SUB H/W Under Ground Sump 15 Lac Lit. 1.00 No. 16,394.02
7.19 SIDHADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 11,115.32
7.20 SIDHADA SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 26,675.53
7.21 ZAZAM SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 21,672.72
7.22 ZAZAM WTP CLR/10 Lac Liter 1.00 No. 11,115.33
7.23 SANTALPUR SUB H/W Under Ground Sump 50 Lac Lit. 1.00 No. 52,099.72
7.24 KALYANPURA SUB H/W Under Ground Sump 8 Lac Lit. 1.00 No. 9,169.37
7.25 KALYANPURA SUB H/W Under Ground Sump 5 Lac Lit. 1.00 No. 6,669.18
7.26 DHOKAVADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 11,115.32
7.27 GARAMADI SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 11,115.32
RANAKPUR OFFTEK Under Ground Sump 75 Lac Lit. - 1 Nos (Twice in
7.2 SATUN WTP Under Ground Sump 100 Lac Lit. - 1 Nos 1.00 No. 1,07,946.15
7.3 SATUN WTP Under Ground Sump 50 Lac Lit. - 1 Nos 1.00 No. 55,225.70
7.4 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 44,622.34
7.5 Satun wtp CLR-1/ 40 Lac Litr 1.00 No. 44,622.34
7.6 Satun wtp recycleaing Sump/ 6 lac litr 1.00 No. 7,658.12
7.7 DHARAVADI SUB H/W Under Ground Sump 10 Lac Lit. - 1 Nos 1.00 No. 11,782.26
7.8 DHARAVADI SUB H/W Under Ground Sump 5 Lac Lit. - 1 Nos 1.00 No. 7,069.33
7.9 SINAD SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 11,782.25
7.10 SHERGANJ SUB H/W Under Ground Sump 20 Lac Lit. 1.00 No. 22,973.09
7.11 SHERGANJ SUB H/W Under Ground Sump 3 Lac Lit. 1.00 No. 4,417.85
7.12 BHILOT SUB H/W Under Ground Sump 15 Lac. Lit. 1.00 No. 17,377.65
7.13 DAHISAR SUB H/W Under Ground Sump 17 Lac. Lit. 1.00 No. 20,616.66
7.14 MOTI PIPALI SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 28,276.06
7.15 GOTARKA SUB H/W Under Ground Sump 7.5 Lac Lit. 1.00 No. 9,425.82
7.16 VARAHI SUB H/W Under Ground Sump 20 Lac Lit. - 2 Nos 2.00 No. 22,973.08
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
7.17 ABIYANA SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 22,973.08
7.18 SIDHADA SUB H/W Under Ground Sump 15 Lac Lit. 1.00 No. 17,377.66
7.19 SIDHADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 11,782.24
7.20 SIDHADA SUB H/W Under Ground Sump 25 Lac Lit. 1.00 No. 28,276.06
7.21 ZAZAM SUB H/W Under Ground Sump 20 Lac. Lit. 1.00 No. 22,973.08
7.22 ZAZAM WTP CLR/10 Lac Liter 1.00 No. 11,782.25
7.23 SANTALPUR SUB H/W Under Ground Sump 50 Lac Lit. 1.00 No. 55,225.70
7.24 KALYANPURA SUB H/W Under Ground Sump 8 Lac Lit. 1.00 No. 9,719.53
7.25 KALYANPURA SUB H/W Under Ground Sump 5 Lac Lit. 1.00 No. 7,069.33
7.26 DHOKAVADA SUB H/W Under Ground Sump 10 Lac Lit. 1.00 No. 11,782.24
7.27 GARAMADI SUB H/W Under Ground Sump 10 Lac. Lit. 1.00 No. 11,782.24
Labour charges for cleaning of RCC ESR with cleaning and removing
algea calcinations, sludge, dirt deposition from bottom and as well as
from wall of ESR with necessary scaffolding tools and plants required
8.0 including labours etc. with dis-infection by chlorine powder as
required. etc. comp. Radhanpur Section &Santalpur Section (Once in
8.1 SATUN WTP ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,266.68
8.2 DHARAVADI SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 4,782.66
8.3 DHARAVADI SUB H/W ESR 2.5 Lac Lit- 20 Mt Ht. 1.00 No. 3,032.98
8.4 SINAD SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 4,782.65
8.5 SHERGANJ SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 4,782.65
8.6 SHERGANJ SUB H/W ESR 2.5 Lac Lit- 25 Mt Ht. 1.00 No. 3,032.98
8.7 BHILOT SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 4,782.65
8.8 DAISAR SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 4,782.65
8.9 MOTI PIPALI SUB H/W ESR 3 Lac Lit- 25 Mt Ht. 1.00 No. 3,266.68
8.10 GOTARKA SUB H/W ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,266.68
8.11 VARAHI SUB H/W ESR 10 Lac Lit- 18 Mt Ht. 1.00 No. 7,932.48
8.12 VARAHI SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 4,782.65
8.13 ABIYANA SUB H/W ESR5 Lac Lit- 20 Mt Ht. 1.00 No. 4,782.65
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
8.14 SIDHADA SUB H/W ESR 1.5 Lac Lit- 28 Mt Ht. 1.00 No. 1,658.45
8.15 SIDHADA SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 4,782.65
8.16 ZAZAM SUB H/W ESR5 Lac Lit- 25 Mt Ht. 1.00 No. 4,782.65
8.17 SANTALPUR SUB H/W ESR 3 Lac Lit- 28 Mt Ht. 1.00 No. 3,266.68
8.18 KALYANPURA SUB H/W ESR 4 Lac Lit- 21 Mt Ht. 1.00 No. 4,083.60
8.19 DHOKAVADA SUB H/W ESR2 Lac Lit-12 Mt Ht. 1.00 No. 2,799.28
8.20 DHOKAVADA SUB H/W ESR3 Lac Lit-18 Mt Ht. 1.00 No. 3,266.68
8.21 GARAMADI SUB H/W ESR2 Lac Lit- 28 Mt Ht. 1.00 No. 2,799.28
8.1 SATUN WTP ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,462.68
8.2 DHARAVADI SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,069.62
8.3 DHARAVADI SUB H/W ESR 2.5 Lac Lit- 20 Mt Ht. 1.00 No. 3,214.96
8.4 SINAD SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,069.61
8.5 SHERGANJ SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,069.61
8.6 SHERGANJ SUB H/W ESR 2.5 Lac Lit- 25 Mt Ht. 1.00 No. 3,214.96
8.7 BHILOT SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,069.61
8.8 DAISAR SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 5,069.61
8.9 MOTI PIPALI SUB H/W ESR 3 Lac Lit- 25 Mt Ht. 1.00 No. 3,462.68
8.10 GOTARKA SUB H/W ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,462.68
8.11 VARAHI SUB H/W ESR 10 Lac Lit- 18 Mt Ht. 1.00 No. 8,408.43
8.12 VARAHI SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 5,069.61
8.13 ABIYANA SUB H/W ESR5 Lac Lit- 20 Mt Ht. 1.00 No. 5,069.61
8.14 SIDHADA SUB H/W ESR 1.5 Lac Lit- 28 Mt Ht. 1.00 No. 1,757.96
8.15 SIDHADA SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,069.61
8.16 ZAZAM SUB H/W ESR5 Lac Lit- 25 Mt Ht. 1.00 No. 5,069.61
8.17 SANTALPUR SUB H/W ESR 3 Lac Lit- 28 Mt Ht. 1.00 No. 3,462.68
8.18 KALYANPURA SUB H/W ESR 4 Lac Lit- 21 Mt Ht. 1.00 No. 4,328.62
8.19 DHOKAVADA SUB H/W ESR2 Lac Lit-12 Mt Ht. 1.00 No. 2,967.24
8.20 DHOKAVADA SUB H/W ESR3 Lac Lit-18 Mt Ht. 1.00 No. 3,462.68
8.21 GARAMADI SUB H/W ESR2 Lac Lit- 28 Mt Ht.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
8.1 SATUN WTP ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,670.44
8.2 DHARAVADI SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,373.80
8.3 DHARAVADI SUB H/W ESR 2.5 Lac Lit- 20 Mt Ht. 1.00 No. 3,407.86
8.4 SINAD SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,373.79
8.5 SHERGANJ SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,373.79
8.6 SHERGANJ SUB H/W ESR 2.5 Lac Lit- 25 Mt Ht. 1.00 No. 3,407.86
8.7 BHILOT SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,373.79
8.8 DAISAR SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 5,373.79
8.9 MOTI PIPALI SUB H/W ESR 3 Lac Lit- 25 Mt Ht. 1.00 No. 3,670.44
8.10 GOTARKA SUB H/W ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,670.44
8.11 VARAHI SUB H/W ESR 10 Lac Lit- 18 Mt Ht. 1.00 No. 8,912.94
8.12 VARAHI SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 5,373.79
8.13 ABIYANA SUB H/W ESR5 Lac Lit- 20 Mt Ht. 1.00 No. 5,373.79
8.14 SIDHADA SUB H/W ESR 1.5 Lac Lit- 28 Mt Ht. 1.00 No. 1,863.44
8.15 SIDHADA SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,373.79
8.16 ZAZAM SUB H/W ESR5 Lac Lit- 25 Mt Ht. 1.00 No. 5,373.79
8.17 SANTALPUR SUB H/W ESR 3 Lac Lit- 28 Mt Ht. 1.00 No. 3,670.44
8.18 KALYANPURA SUB H/W ESR 4 Lac Lit- 21 Mt Ht. 1.00 No. 4,588.34
8.19 DHOKAVADA SUB H/W ESR2 Lac Lit-12 Mt Ht. 1.00 No. 3,145.27
8.20 DHOKAVADA SUB H/W ESR3 Lac Lit-18 Mt Ht. 1.00 No. 3,670.44
8.21 GARAMADI SUB H/W ESR2 Lac Lit- 28 Mt Ht. 1.00 No. 3,145.27
8.1 SATUN WTP ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,890.67
8.2 DHARAVADI SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,696.23
8.3 DHARAVADI SUB H/W ESR 2.5 Lac Lit- 20 Mt Ht. 1.00 No. 3,612.33
8.4 SINAD SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,696.22
8.5 SHERGANJ SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,696.22
8.6 SHERGANJ SUB H/W ESR 2.5 Lac Lit- 25 Mt Ht. 1.00 No. 3,612.33
8.7 BHILOT SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,696.22
8.8 DAISAR SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 5,696.22
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
8.9 MOTI PIPALI SUB H/W ESR 3 Lac Lit- 25 Mt Ht. 1.00 No. 3,890.67
8.10 GOTARKA SUB H/W ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 3,890.67
8.11 VARAHI SUB H/W ESR 10 Lac Lit- 18 Mt Ht. 1.00 No. 9,447.72
8.12 VARAHI SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 5,696.22
8.13 ABIYANA SUB H/W ESR5 Lac Lit- 20 Mt Ht. 1.00 No. 5,696.22
8.14 SIDHADA SUB H/W ESR 1.5 Lac Lit- 28 Mt Ht. 1.00 No. 1,975.25
8.15 SIDHADA SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 5,696.22
8.16 ZAZAM SUB H/W ESR5 Lac Lit- 25 Mt Ht. 1.00 No. 5,696.22
8.17 SANTALPUR SUB H/W ESR 3 Lac Lit- 28 Mt Ht. 1.00 No. 3,890.67
8.18 KALYANPURA SUB H/W ESR 4 Lac Lit- 21 Mt Ht. 1.00 No. 4,863.64
8.19 DHOKAVADA SUB H/W ESR2 Lac Lit-12 Mt Ht. 1.00 No. 3,333.99
8.20 DHOKAVADA SUB H/W ESR3 Lac Lit-18 Mt Ht. 1.00 No. 3,890.67
8.21 GARAMADI SUB H/W ESR2 Lac Lit- 28 Mt Ht. 1.00 No. 3,333.99
8.1 SATUN WTP ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 4,124.11
8.2 DHARAVADI SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 6,038.00
8.3 DHARAVADI SUB H/W ESR 2.5 Lac Lit- 20 Mt Ht. 1.00 No. 3,829.07
8.4 SINAD SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 6,037.99
8.5 SHERGANJ SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 6,037.99
8.6 SHERGANJ SUB H/W ESR 2.5 Lac Lit- 25 Mt Ht. 1.00 No. 3,829.07
8.7 BHILOT SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 6,037.99
8.8 DAISAR SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 6,037.99
8.9 MOTI PIPALI SUB H/W ESR 3 Lac Lit- 25 Mt Ht. 1.00 No. 4,124.11
8.10 GOTARKA SUB H/W ESR 3 Lac Lit- 20 Mt Ht. 1.00 No. 4,124.11
8.11 VARAHI SUB H/W ESR 10 Lac Lit- 18 Mt Ht. 1.00 No. 10,014.58
8.12 VARAHI SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 1.00 No. 6,037.99
8.13 ABIYANA SUB H/W ESR5 Lac Lit- 20 Mt Ht. 1.00 No. 6,037.99
8.14 SIDHADA SUB H/W ESR 1.5 Lac Lit- 28 Mt Ht. 1.00 No. 2,093.77
8.15 SIDHADA SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1.00 No. 6,037.99
8.16 ZAZAM SUB H/W ESR5 Lac Lit- 25 Mt Ht. 1.00 No. 6,037.99
8.17 SANTALPUR SUB H/W ESR 3 Lac Lit- 28 Mt Ht. 1.00 No. 4,124.11
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
8.18 KALYANPURA SUB H/W ESR 4 Lac Lit- 21 Mt Ht. 1.00 No. 5,155.46
8.19 DHOKAVADA SUB H/W ESR2 Lac Lit-12 Mt Ht.
8.20 DHOKAVADA SUB H/W ESR3 Lac Lit-18 Mt Ht. 1.00 No. 4,124.11
8.21 GARAMADI SUB H/W ESR2 Lac Lit- 28 Mt Ht. 1.00 No. 3,534.03
Distempering (Two Coats) with oil bound distemper of approved
brand and manufacture and of required shade on wall surfaces to
give an even shade, over and including a priming coat with distemper
primer of approved brand and manufacture after thoroughly
brushing the surface free from mortar dropping and other foreign
matter and also including preparing the surface even and sand
papered smooth (UG sump, Pump house, Staff Quarter, Compound
wall etc. & Painting Inside/Outside to WTP inc. all buildings, RCC UG
Sump, Pump room, Staff-Quarters, Compound Wall etc.) Radhanpur
& Santlpur Section
9.1 Dharavadi HW 5,092.18 Sq.mt 82.31
9.2 Sinad HW 2,621.06 Sq.mt 82.31
9.3 Sherganj HW 6,149.95 Sq.mt 82.31
9.4 Bhilot HW 4,572.15 Sq.mt 82.31
9.5 Daisar HW 2,101.25 Sq.mt 82.31
9.6 Moti Pipali HW 3,534.65 Sq.mt 82.31
9.7 Gotarka HW 2,867.36 Sq.mt 82.31
9.8 Satun 60 MLD WTP 28,935.49 Sq.mt 82.31
9.9 Varahi H/W 6,108.45 Sq.mt 82.31
9.10 Abiyana H/W 2,729.36 Sq.mt 82.31
9.11 Sidhada H/W 4,868.94 Sq.mt 82.31
9.12 Santalpur HW 4,331.20 Sq.mt 82.31
9.13 Garamdi HW 2,809.23 Sq.mt 82.31
9.14 Kalyanpura HW 2,832.27 Sq.mt 82.31
9.15 Dhokawada HW 2,528.55 Sq.mt 82.31
9.16 Zazam 6.0 MLD WTP 4,973.09 Sq.mt 82.31
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
9.1 Dharavadi HW 5,092.18 Sq.mt 98.03
9.2 Sinad HW 2,621.06 Sq.mt 98.03
9.3 Sherganj HW 6,149.95 Sq.mt 98.03
9.4 Bhilot HW 4,572.15 Sq.mt 98.03
9.5 Daisar HW 2,101.25 Sq.mt 98.03
9.6 Moti Pipali HW 3,534.65 Sq.mt 98.03
9.7 Gotarka HW 2,867.36 Sq.mt 98.03
9.8 Satun 60 MLD WTP 28,935.49 Sq.mt 98.03
9.9 Varahi H/W 6,108.45 Sq.mt 98.03
9.10 Abiyana H/W 2,729.36 Sq.mt 98.03
9.11 Sidhada H/W 4,868.94 Sq.mt 98.03
9.12 Santalpur HW 4,331.20 Sq.mt 98.03
9.13 Garamdi HW 2,809.23 Sq.mt 98.03
9.14 Kalyanpura HW 2,832.27 Sq.mt 98.03
9.15 Dhokawada HW 2,528.55 Sq.mt 98.03
9.16 Zazam 6.0 MLD WTP 4,973.09 Sq.mt 98.03
Applying any approve quality of cement paint in three coats incl.
cleaning, washing etc. complete for ESR Only. For Existing ESR Incl.
10.0 Scaffolding. (For ESR Only with Scaffolding) Radhanpur & Santlpur
10.1 SATUN WTP ESR 3 Lac Lit- 20 Mt Ht. 876.84 Sq.mt 80.98
10.2 DHARAVADI SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,029.99 Sq.mt 80.98
10.3 DHARAVADI SUB H/W ESR 2.5 Lac Lit- 20 Mt Ht. 686.88 Sq.mt 80.98
10.4 SINAD SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,384.73 Sq.mt 80.98
10.5 SHERGANJ SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 942.79 Sq.mt 80.98
10.6 SHERGANJ SUB H/W ESR 2.5 Lac Lit- 25 Mt Ht. 578.55 Sq.mt 80.98
10.7 BHILOT SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,384.74 Sq.mt 80.98
10.8 DAISAR SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 920.08 Sq.mt 80.98
10.9 MOTI PIPALI SUB H/W ESR 3 Lac Lit- 25 Mt Ht. 857.22 Sq.mt 80.98
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
10.10 GOTARKA SUB H/W ESR 3 Lac Lit- 20 Mt Ht. 763.09 Sq.mt 80.98
10.11 VARAHI SUB H/W ESR 10 Lac Lit- 18 Mt Ht. 1,051.90 Sq.mt 80.98
10.12 VARAHI SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 995.76 Sq.mt 80.98
10.13 ABIYANA SUB H/W ESR5 Lac Lit- 20 Mt Ht. 862.35 Sq.mt 80.98
10.14 SIDHADA SUB H/W ESR 1.5 Lac Lit- 28 Mt Ht. 617.26 Sq.mt 80.98
10.15 SIDHADA SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,237.36 Sq.mt 80.98
10.16 ZAZAM SUB H/W ESR5 Lac Lit- 25 Mt Ht. 1,024.18 Sq.mt 80.98
10.17 SANTALPUR SUB H/W ESR 3 Lac Lit- 28 Mt Ht. 884.76 Sq.mt 80.98
10.18 KALYANPURA SUB H/W ESR 4 Lac Lit- 21 Mt Ht. 1,399.56 Sq.mt 80.98
10.19 DHOKAVADA SUB H/W ESR2 Lac Lit-12 Mt Ht. 864.29 Sq.mt 80.98
10.20 DHOKAVADA SUB H/W ESR3 Lac Lit-18 Mt Ht. 428.84 Sq.mt 80.98
10.21 GARAMADI SUB H/W ESR2 Lac Lit- 28 Mt Ht. 691.07 Sq.mt 80.98
10.1 SATUN WTP ESR 3 Lac Lit- 20 Mt Ht. 876.84 Sq.mt 96.45
10.2 DHARAVADI SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,029.99 Sq.mt 96.45
10.3 DHARAVADI SUB H/W ESR 2.5 Lac Lit- 20 Mt Ht. 686.88 Sq.mt 96.45
10.4 SINAD SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,384.73 Sq.mt 96.45
10.5 SHERGANJ SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 942.79 Sq.mt 96.45
10.6 SHERGANJ SUB H/W ESR 2.5 Lac Lit- 25 Mt Ht. 578.55 Sq.mt 96.45
10.7 BHILOT SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,384.74 Sq.mt 96.45
10.8 DAISAR SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 920.08 Sq.mt 96.45
10.9 MOTI PIPALI SUB H/W ESR 3 Lac Lit- 25 Mt Ht. 857.22 Sq.mt 96.45
10.10 GOTARKA SUB H/W ESR 3 Lac Lit- 20 Mt Ht. 763.09 Sq.mt 96.45
10.11 VARAHI SUB H/W ESR 10 Lac Lit- 18 Mt Ht. 1,051.90 Sq.mt 96.45
10.12 VARAHI SUB H/W ESR 5 Lac Lit- 20 Mt Ht. 995.76 Sq.mt 96.45
10.13 ABIYANA SUB H/W ESR5 Lac Lit- 20 Mt Ht. 862.35 Sq.mt 96.45
10.14 SIDHADA SUB H/W ESR 1.5 Lac Lit- 28 Mt Ht. 617.26 Sq.mt 96.45
10.15 SIDHADA SUB H/W ESR 5 Lac Lit- 25 Mt Ht. 1,237.36 Sq.mt 96.45
10.16 ZAZAM SUB H/W ESR5 Lac Lit- 25 Mt Ht. 1,024.18 Sq.mt 96.45
10.17 SANTALPUR SUB H/W ESR 3 Lac Lit- 28 Mt Ht. 884.76 Sq.mt 96.45
10.18 KALYANPURA SUB H/W ESR 4 Lac Lit- 21 Mt Ht. 1,399.56 Sq.mt 96.45
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
10.19 DHOKAVADA SUB H/W ESR2 Lac Lit-12 Mt Ht. 864.29 Sq.mt 96.45
10.20 DHOKAVADA SUB H/W ESR3 Lac Lit-18 Mt Ht. 428.84 Sq.mt 96.45
10.21 GARAMADI SUB H/W ESR2 Lac Lit- 28 Mt Ht. 691.07 Sq.mt 96.45
Painting Two Coat (Excluding Priming Coat) on Previously Printed
Steel and Other Metal Surface with Synthetic Enamel Paint, Brushing
11.0 to Give an Even shade including cleaning the surface of all dirt, dust
and Other foreign Matter. Radhanpur and Santalpur Section
11.1 Dharavadi HW 489.95 Sq.mt 62.05
11.2 Sinad HW 192.87 Sq.mt 62.05
11.3 Sherganj HW 500.39 Sq.mt 62.05
11.4 Bhilot HW 373.79 Sq.mt 62.05
11.5 Daisar HW 79.87 Sq.mt 62.05
11.6 Moti Pipali HW 246.47 Sq.mt 62.05
11.7 Gotarka HW 188.16 Sq.mt 62.05
11.8 Satun 60 MLD WTP 1,944.07 Sq.mt 62.05
11.9 Varahi H/W 386.39 Sq.mt 62.05
11.10 Abiyana H/W 228.99 Sq.mt 62.05
11.11 Sidhada H/W 282.09 Sq.mt 62.05
11.12 Santalpur HW 300.18 Sq.mt 62.05
11.13 Garamdi HW 273.89 Sq.mt 62.05
11.14 Kalyanpura HW 237.19 Sq.mt 62.05
11.15 Dhokawada HW 216.26 Sq.mt 62.05
11.16 Zazam 6.0 MLD WTP 444.48 Sq.mt 62.05
11.1 Dharavadi HW 489.95 Sq.mt 73.90
11.2 Sinad HW 192.87 Sq.mt 73.90
11.3 Sherganj HW 500.39 Sq.mt 73.90
11.4 Bhilot HW 373.79 Sq.mt 73.90
11.5 Daisar HW 79.87 Sq.mt 73.90
11.6 Moti Pipali HW 246.47 Sq.mt 73.90
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
11.7 Gotarka HW 188.16 Sq.mt 73.90
11.8 Satun 60 MLD WTP 1,944.07 Sq.mt 73.90
11.9 Varahi H/W 386.39 Sq.mt 73.90
11.10 Abiyana H/W 228.99 Sq.mt 73.90
11.11 Sidhada H/W 282.09 Sq.mt 73.90
11.12 Santalpur HW 300.18 Sq.mt 73.90
11.13 Garamdi HW 273.89 Sq.mt 73.90
11.14 Kalyanpura HW 237.19 Sq.mt 73.90
11.15 Dhokawada HW 216.26 Sq.mt 73.90
11.16 Zazam 6.0 MLD WTP 444.48 Sq.mt 73.90
I / We, am / are willing of carry out the work ........................ % above / below %................ age (Percentage should be writing in figure and word
below above at the tender rate mentioned above amount my / our tender workas under
1. Estimated cost put to tender 1. Estimated cost put to tender
2. Tender Cost. 20,22,72,820.61 2. Tender Cost .20,22,72,820.61
3. Below Rs…………% below 3. Above Rs………. % above
5. In word Rs…………………………. 5. In word Rs…………………
Deputy Executive Engineer Deputy Executive Engineer Deputy Executive Engineer
P. H. San Sub division P. H. San Sub division P.H.Mech.Sub.Dn.
Radhanpur Varahi Shankheshwar
Executive Engineer Superintending Engineer
P. H. Works Division P.H.Circle
Radhanpur Palanpur
GWSSB RADHANPUR Page
NAME OF SCHEME: RADHANPUR&SANTALPUR RWSS TA: RADHANPUR, SANTALPUR, DIST: PATAN
Schedule: B. (Part- B.4 Color Work)
RADHANPUR AND SANTALPUR SECTION
Sr.No. IT. Qty. Item
Distempering (Two Coat) with oil bound distemper of approved brand and manufacture and of required shade on wall
surfaces to give an even shade, over and including a priming coat with distemper primer of approved brand and
1 1 manufacture after thoroughly brushing the surface free from mortar dropping and other foreign matter and also
including preparing the surface even and sand papered smooth.
(1) Radhanpur Section (WTP, UG sump, Pump house, Staff Quarter, Compound wall etc. 8 Head Work)
(2) Santalpur Section (WTP, UG sump, Pump house, Staff Quarter Compound wall etc. 8 Head Work)
applying any approve quality of Cement paint in Three coats including cleaning washing etc. Complete For E.S.R. only
2 2 For Existing ESR including Scaffolding.
a 9,424.71 (1) ESR at 8 Head Work Radhanpur Section
b 10,057.03 (2) ESR at 8 Head Work Santalpur Section
Painting one coats (excluding priming coat) on previously painted steel and other metal surface with enamel paint,
3 3 brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.
(1) Radhanpur Section 8 Head Work WTP, UG sump, Pump house, Staff Quarter, Compound wall, valve, other metalic
a 4,015.45 Materials etc.
(2)Santlapur Section 8 Head Work WTP, UG sump, Pump house, Staff Quarter, Compound wall, valve, other metalic
b 2,369.24 Materials etc. 8 Head Work Satalpur Section
Rates to be quoted exclusive of GST.
Part A is payable on monthly basis whereas part B & C are subject to completion of activities
and approval of the measurement.
Water supply of target quantity of water to all habitations (village, towns and hamlets) on a
daily basis. If due to breakdown, agency is not capable of supplying water then such quantity
should be supplied the next day to cope up with the shortage. Such that the water supplied on
the next day will be 2 times the regular per day target.
Contractor should quote rate in words & figure both.
The agency shall be responsible for the repair and maintenance of any pipelines, pumping
machinery, or other components that may be newly installed under the scheme in the future.
The agency shall be required to comply with all circulars issued from time to time by the
Government and any future circulars issued by the department for the improvement of the
If Any Technically Issue of water is not supplied to any village or hamlet, deductions will be
made from the maintenance cost for the related non-use pipeline, civil components, valve
system, pumping machinery, etc., as per the current SOR.
Insurance Policy should be procured in favour of Executive Engineer, PH Works Division,
Radhanpur and contractor has to produce it before entering into agreement with department,
for the full period of O&M.
The bidders should strictly note that rate will be fixed and firm. No escalation will be given
during the maintenance period.
The work should be carried out as per the terms and conditions laid down in the tender
The cost of raw water, electricity will be borne by GWSSB.
All other required material for O&M work shall be brought by the contractor at his own cost
including loading, unloading and carting and the same material shall get approval from the
Engineer-in-charge before use in the work.
The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading,
carting labour charges payment to labour including insurance, P.F. and all other liabilities for
the staff engaged for the O&M work.
All replaced material (provided from the department’s store) shall be returned to department
store by the contractor at his own cost.
Item Vise Technical Specification.
Providing, Supplying &Procurement and necessary dosing of PAC 10% Liquid for removing of
turbidity from raw water. including all taxes & Carting. Satun WTP (60 mld) & Zazam WTP (6
mld) in Contract Period (1st to 5 Year).
1.Providing, suppling, transportation, loading and carting all type of work for PAC is
included in the scope of work of Agency.
2.The Payment shall be made on litre. basis of work done.
Refilling of Chlorine gas in Cylinder including transportation to and from factory and back.
900kg Cylinder Satun WTP (60 mld) in Contract Period (1st to 5 Year).
1. Providing, supplying, transportation, loading and carting and refilling of chlorine gas work
for chlorine gas is included in the scope of work of Agency.
2. The Payment shall be made on No. basis of work done.
Refilling of Chlorine gas in Cylinder including transportation to and from factory and back.
100kg Cylinder at All Sub Head Work, Zazam WTP (6 mld) Radhanpur and Santalpur Section
1. Providing, supplying, transportation, loading and carting and refilling of chlorine gas work
for chlorine gas is included in the scope of work of Agency.
2. The Payment shall be made on No. basis of work done.
Procurement & replacement of filter media: Effective size of filter sand 0.45 to 0.70 mm
uniformity coefficient not more than 1.7 nor less than 1.3, depth of filter 0.75 M, freeboard
50 cm, gravel 0.45 M in depth, sand and gravel conforming to IS: 8491(i)-77. in Filter bed of
required depth as per design and drawing inclusive of all lead Sand.
1. Filter sand shall consist of hard, durable grains of silica and shall have a specific gravity of not less than
2.5. All grains of sand shall preferably be water worn. The minimum silica content in sand as determined
by method given in 7 of IS: 2000-1962† shall be 90 percent.
2. Any sample of filter sand shall not contain more than 5 percent by volume of impurities, such as clay,
loam, silt, etc, in one hour settlement after shaking in water in accordance with procedure described here.
Fill a 1000 ml calibrated measuring cylinder with filter sand to be tested to half its volume and add water
until the cylinder is three-fourths full. Shake up the mixture vigorously and allow it to settle for one hour.
Report the volume of impurities standing over the sand as percentage of volume of sand.
3. The sand shall not contain more than 5 percent of acid soluble matter as determined by solubility test.
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Rinse a minimum of 10 g of sample with distilled water to remove all dust and fine material, dry at 103°C in hot
air-oven for one hour, cool and weigh. Immerse in 40 percent (v/v) hydrochloric acid for a period of 24 hours at
room temperature. After 24 hours of immersion, wash the sample thoroughly with distilled water, dry at 103°C in
hot air for one hour, cool and weigh.
The percentage of solubility is given by the formula:
4. The loss on ignition, which is a measure of the organic matter present in sand, and determined by the
procedure given shall not be more than 0.7 percent.
Rinse a minimum of 10 g of the sample with distilled water to remove dust and fine material, dry at-103°C in
hot air-oven for one hour, cool and weigh. Ignite the sample at 550°C in an electric muffle furnace for one
hour, cool and weigh.
Calculate percent loss on ignition using the following formula:
Grain Shape and Shape Variation
1. Shape of filter grains is important from the hydraulic and turbidity removal points of view. Rounded
grains are preferable to angular ones.
2. Filter sand shall meet the requirements of effective size and uniformity coefficient as specified here.
1 Lot—The quantity of sand received in a consignment from a single source shall be divided into a
convenient number of lots of approximately equal size not exceeding 10 m3.
2 Methods of test for soils: Part IV Grain size analysis (first revision)
3 †Methods of chemical analysis of bauxite.
4 From each lot, 10 increments each weighing about 2 kg shall be collected. The increment shall be
taken at regular intervals during loading or unloading. From a stationary lot, 2 increments shall be
taken from the top and 2 each from the four sides. The increment in all cases shall be taken from a
depth of at least 150 mm.
5 All the increments taken from the same lot shall be mixed thoroughly and reduced by the process of
coning and quartering to yield a laboratory sample of required mass (about 2 kg).
6 Criteria for Conformity—The laboratory sample as obtained shall be tested for all the requirements and
if it passes in respect of them the lot shall be considered as conforming to this standard.
Sieve analysis for sand
Fine aggregate for the test shall be passed through a low-mm IS Sieve. The sample sh@l be of such a
size that it will yield not less than 100 g of each of the following sizes, which shall be available in
amounts of 5 percent or more, expressed in terms of the following sieves:
The sample of fine aggregate shall be thoroughly washed on a 300-micron IS Sieve, dried to constant
weight at 105” to 1 10°C.
Take a representative oven dried sample of soil that weighs about 500 g. ( this is normally used for soil
samples the greatest particle size of which is 4.75 mm)
If soil particles are lumped or conglomerated crush the lumped and not the particles using the pestle
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Determine the mass of sample accurately. Wt (g)
Prepare a stack of sieves. sieves having larger opening sizes (i.e lower numbers) are placed above the
ones having smaller opening sizes (i.e higher numbers). The very last sieve is #200 and a pan is placed
under it to collect the portion of soil passing #200 sieve. Here is a full set of sieves. (#s 4 and
should always be included)
Make sure sieves are clean, if many soil particles are stuck in the openings try to poke them out using
Weigh all sieves and the pan separately.
Pour the soil from step 3 into the stack of sieves from the top and place the cover, put the stack in the
sieve shaker and fix the clamps, adjust the time on 10 to 15 minutes and get the shaker going.
Stop the sieve shaker and measure the mass of each sieve + retained soil.
Mass of soil Percentage
Mass of retained-Wn on each sieve Cumulative
Sieve size Mass of each % finer, 100-
sieve each sieve + (g) Rn percent
(mm) sieve (mm) ∑Rn
retained soil retained ∑ Rn
Col 4-Col 3 Col 5/Wt *100
Draw graph of log sieve size vs % finer. The graph is known as grading curve. Corresponding to 10%,
30% and 60% finer, obtain diameters from graph these are D10, D30, D60, using these obtain Cc and
Cu which further represent how well the soil is graded i.e whether the soil is well-graded, gap-graded or
poorly graded. (Cu should be in 1.3-1.7).
Sand has to brought out from Godhra.
Rate includes all transportation, labour, octroi, tax. Etccharges.
Contractor has to dump the sand at respective filter plant.
No extra payment will be made for storage of sand at H/W site. Contractor has to manage his own
storage arrangement at site.
Payment will be made after all such testing of sand mention above as per I.S.
Material testing in scope of contractor. Testing must be carried out at gov. approved lab. / Colleges at
his own cost. Departmentwill not pay additional for material testing.
If material fail in above criteria than no payment will be made for any wok.
Testing must be carried out at starting of work after receiving result than only contractor will have to
carry out another tasks.
Labour charge for removal of existing sand filter media from filter bad to 1000 mt away from site as per the
instruction of engineer in charge.
1 Rate includes all labour charge, machinery and equipment needed to perform above mention work.
2 No extra payment will be paid for any transportation work for machinery and equipment and labour.
3 Contractor has to manage labour and accessories needed for satisfactory completion of the work at site as
his own cost. Department will not pay any extra charges.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
4 Filter media (sand) has to deposited in 1000 mtr. Radius from respective filter plant as per instruction of
Eng.-in.-charge. No extra payment will be paid for tractor or transportation work.
5 In case of performing above work if damage occur at any part of filter plant than contractor is liable to repair
it at his own cost as per instruction of Eng.-in –charge.
Labour charge for filling the sand in filter bad.
1 Rate includes all labour charge, machinery and equipment needed to perform above mention work.
2 No extra payment will be paid for any transportation work for machinery and equipment and labour.
3 Contractor has to manage labour, light and accessories needed for satisfactory completion of the work at
site as his own cost. Department will not pay any extra charges.
4 Filter media (sand) will be brought up from from respective place to mention site, for that no extra payment
will be made for transportation, tax,octroietc charges.
5 In case of performing above work if damage occur at any part of filter plant than contractor is liable to repair
it at his own cost as per instruction of Eng.-in –charge.
6 Contractor has to manage temporary stair case or respective tool for caring the sand from outside of filter
plant to filter bed.
Mode of Measurements & Payment:
Payment of Work Shall be on Cum. The work includes Providing, Supplying New Sand of Required
Configuration & Removing Existing Sand from Filter Bed.
Providing & supplying gravels of different size as per design and drawing and laying in layers
in filter beds Inclusive of all lead. (twice in contract period) (30% Head Loss).
1. Rate includes all labour charge, machinery and equipment needed to perform above mention work.
2. No extra payment will be paid for any transportation work for machinery and equipment and labour.
3. Contractor has to manage labour, light and accessories needed for satisfactory completion of the work at
site as his own cost. Department will not pay any extra charges.
4. Filter media (sand) will be brought up from from respective place to mention site, for that no extra payment
will be made for transportation, tax,octroietc charges.
5. In case of performing above work if damage occur at any part of filter plant than contractor is liable to repair
it at his own cost as per instruction of Eng.-in –charge.
6. Contractor has to manage temporary stair case or respective tool for caring the sand from outside of filter
plant to filter bed.
Mode of Measurements & Payment:
Payment of Work Shall be on Cum.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Labour charges for cleaning of sump / GL cistern with cleaning and removing algea
calcinations, sludge, dirt deposition from bottom and as well as from wall of sump with
necessary tools and plants required including labours etc. with dis-infection by clorine
powder as required. etc. comp. (A) Radhanpur Section (Once in Year).
The mud and products of the cleaning have to be discarded in such a place and manner
that there is no physical harm to surroundings without damaging Headworks property as
by the Engineer in charge.
Sump cleaning involves removing sludge, metal chips, and other solids from coolant or oil
tanks using vacuum suction systems, with specifications including motor power,
The Payment shall be made on No. basis of work done.
Labour charges for cleaning of RCC ESR with cleaning and removing algea calcinations,
sludge, dirt deposition from bottom and as well as from wall of ESR with necessary
scaffolding tools and plants required including labours etc. with dis-infection by clorine
powder as required. etc. comp. (Once in Year)
RCC ESR is to be cleared of all obstruction, insiedes and materials, walls of all kinds of
shrubs and dirt entirely removed.
The mud and products of the cleaning haveto be discarded in such a place and manner
that there is no physical harm to surroundings without damaging Headworks property as
by the Engineer in charge.
Sump cleaning involves removing sludge, metal chips, and other solids from coolant or oil
tanks using vacuum suction systems, with specifications including motor power,
The Payment shall be made on No. basis of work done.
Distempering (Two Coat) with oil bound distemper of approved brand and manufacture and
of required shade on wall surfaces to give an even shade, over and including a priming coat
with distemper primer of approved brand and manufacture after thoroughly brushing the
surface free from mortar dropping and other foreign matter and also including preparing the
surface even and sand papered smooth.
Painting of Concrete, Masonry & Plastered Surfaces:
Oil bound distemper shall conform to IS:428. The primer shall be alkali resistant primer of
the same manufacture as that of the distemper.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Cement paint shall conform to IS:5410. The primer shall be a thinned coat of cement paint.
Lead free acid, alkali and chlorine resisting paint shall conform to IS:9862.
Color wash shall be made by addition of a suitable quantity of mineral pigment, not affected
by lime, to the prepared white wash to obtain the shade/tint as approved by the GWSSB.
All the materials shall be of the best quality from an approved manufacturer. Contractor
shall obtain prior approval of the GWSSB for the brand of manufacture and the color/shade.
All materials shall be brought to the site of works in sealed containers.
Contractor shall obtain the approval of the GWSSB regarding the readiness of the surfaces to
receive the specified finish, before commencing the work on painting. Painting of new
surfaces shall be deferred as much as possible to allow for thorough drying of the sub-
The surfaces to be treated shall be prepared by thoroughly brushing them free from dirt,
mortar droppings and any loose foreign materials. Surfaces shall be free from oil, grease and
efflorescence. Efflorescence shall be removed only by dry brushing of the growth. Cracks
shall be filled with Gypsum. Workmanship of painting shall generally conform to IS:2395.
Surfaces of doors, windows etc. shall be protected suitably to prevent paint finishes from
splashing on them.
The prepared surfaces shall be wetted and the finish applied by brushing. The operation for
each coat shall consist of a stroke of the brush first given horizontally from the right and the
other from the left and similarly, the subsequent stroke from bottom upwards and the other
from top downwards, before the first coat dries. Each coat shall be allowed to dry before
the next coat is applied. Minimum of 2 coats shall be applied unless otherwise specified. The
dry surface shall present a uniform finish without any brush marks.
Color wash shall be applied in the same way as for white wash. A minimum of 2 coats shall
be applied unless otherwise specified. The surface shall present a smooth and uniform finish
without any streaks. The finished dry surface shall not show any signs of peeling/powdery
and come off readily on the hand when rubbed.
Oil bound Distemper:
The prepared surfaces shall be dry and provided with one coat of alkali resistant primer by
brushing. The surface shall be finished uniformly without leaving any brush marks and
allowed to dry for at least 48 hours. A minimum of two coats of oil bound
distemper shall be applied, unless otherwise specified. The first coat shall be of a lighter
tint. At least 24 hours shall be left after the first coat to become completely dry before the
application of the second coat. Broad, stiff, double bristled distemper brushes shall be used
for the work. The operations for brushing each coat shall be as detailed above.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Acid, Alkali Resisting Paint:
A minimum of 2 coats of acid/alkali resisting paint shall be applied over the prepared dry
surfaces by brushing. Primer coat shall be as per manufacturer's instructions.
Plastic Emulsion Paint:
The prepared surface shall be dry and provided with one coat of primer which shall be a
thinned coat of emulsion paint. The quantity of thinner shall be as per manufacturer's
instructions. The paint shall be laid on evenly and smoothly by means of crossing and laying
off. The crossing and laying off consists of covering the area with paint, brushing the surface
hard for the first time over and then brushing alternately in opposite directions two or three
times and then finally brushing lightly in a direction at right angles. In this process, no brush
marks shall be left after the laying off is finished. The full process of crossing and laying off
constitutes one coat. The next coat shall be applied only after the first coat has dried and
sufficiently become hard which normally takes about 2 to 3 hours. A minimum of 2 finishing
coats of the same color shall be applied unless otherwise specified. Paint may also be
applied using rollers. The surface on finishing shall present a flat velvety smooth finish and
uniform in shade without any patches.
Acrylic Emulsion Paint:
Acrylic emulsion paint shall be applied in the same way as for plastic emulsion paint. A
minimum of 2 finishing coats over one coat of primer shall be provided unless otherwise
Anodized Aluminum sheets shall be 1.00mm thick with anodic film thickness of 0.025 mm.
Galvanized mild steel sheets shall be 1.00mm thick with zinc coating of 800 gms/sq.m.
Bitumen felt shall be either Hessian base self-finished bitumen felt Type-3 Grade I
conforming to IS:1322 or glass fiber base self-finished felt Type-2 Grade 1 conforming to
The type of the flashing and method of fixing shall be as specified.
Flashing shall be of the correct shape and size as indicated in the construction Drawings to
be prepared by the Contractor and they shall be properly fixed to ensure their
Flashing shall be of long lengths so as to provide minimum number of joints. The minimum
overlap at joints shall be 100mm.
Fixing of the flashing shall be either by bolting with bitumen washers or by tucking into the
groove 75 mm wide x 65 mm deep in masonry/concrete along with cement mortar 1:4
filleting as indicated in the Drawings to be prepared by the Contractor. Curing of the mortar
shall be carried out for a minimum period of 4 days.
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
Bitumen felt flashing of the type as specified shall be provided with 2 coats of bituminous
paint at the rate of 0.10 liter/m2after the installation.
Applying any approve quality of Cement paint in Three coats including cleaning washing etc.
Complete For E.S.R. only For Existing ESR including Scaffolding.
The prepared surfaces shall be wetted to control surface suction and to provide moisture to
aid in proper curing of the paint. Cement paint shall be applied with a brush with stiff
bristles. The primer coat shall be a thinned coat of cement paint. The quantity of thinner
shall be as per manufacturer's instructions. The coats shall be vigorously scrubbed to work
the paint into any voids for providing a continuous paint film free from pinholes for effective
water proofing in addition to decoration. Cement paint shall be brushed in uniform thickness
and the covering capacity for two coats on plastered surfaces shall be 3 to 4 kg/m2. A
minimum of 2 coats of the same color shall be applied. At least 24 hours shall be left after
the first coat to become sufficiently hard before the second coat is applied. The painted
surfaces shall be thoroughly cured by sprinkling with water using a fog spray at least 2 to
times a day. Curing shall commence after about 12 hours when the paint hardens. Curing
shall be continued for at least 2 days after the application of final coat. The operations for
brushing each coat shall be as detailed above.
Painting one coats (excluding priming coat) on previously painted steel and other metal
surface with enamel paint, brushing to give an even shade including cleaning the surface of
all dirt, dust and other foreign matter.
Painting & Polishing of Wood Work:
· Wood primer shall conform to IS:3536.
· Filler shall conform to IS:110.
· Varnish shall conform to IS:337.
· French polish shall conform to IS:348.
· Synthetic enamel paint shall conform to IS:2932.
All the materials shall be of the best quality from an approved manufacturer. Contractor
shall obtain prior approval of the GWSSB for the brand of manufacture and the color/shade.
All materials shall be brought to the site of works in sealed containers.
The type of finish to be provided for woodwork of painting or polishing, the number of
coats, etc. shall be as specified in the respective items of work to be prepared by the
Contractor. Primer and finish paint shall be compatible with each other to avoid cracking
and wrinkling. Primer and finish paint shall be from the same manufacturer. Painting shall
be either by brushing or spraying. Contractor shall procure the appropriate quality of paint
for this purpose as recommended by the manufacturer.
The workmanship shall generally conform to the requirements of IS:2338 (Part I).
All the wood surfaces to be painted shall be thoroughly dry and free from any foreign
matter. Surfaces shall be smoothened with abrasive paper using it across the grains and
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
dusted off. Wood primer coat shall then be applied uniformly by brushing. The number of
primer coats shall be as specified in the item of work to be prepared by the Contractor.
Any slight irregularities of the surface shall then be made- up by applying an optimum coat
of filler conforming to IS:110 and rubbed down with an abrasive paper for obtaining a
smooth surface for the undercoat of synthetic enamel paint conforming to IS:2932. Paint
shall be applied by brushing evenly and smoothly by means of crossing and laying off in the
direction of the grain of wood. After drying, the coat shall be carefully rubbed down using
very fine grade of sand paper and wiped clean before the next coat is applied. At least
hours shall elapse between the applications of successive coats. Each coat shall vary
slightly in shade and this shall be got approved by the GWSSB. The number of coats of
paint to be applied shall be as specified in the item of work to be prepared by the
Contractor. All the wood surfaces to be provided with clear finishes shall be thoroughly dry
and free from any foreign matter. Surfaces shall be smoothened with abrasive paper using
it in the direction of the grains and dusted off. Any slight irregularities of the surface shall
be made up by applying an optimum coat of transparent liquid filler and rubbed down with
an abrasive paper for obtaining a smooth surface. All dust and dirt shall be thoroughly
removed. Over this prepared surface, varnish conforming to IS:337 shall be applied by
brushing. Varnish should not be retouched once it has begun to set. Staining if required
shall be provided as directed by the GWSSB. When two coats of varnish are specified, the
first coat should be a hard-drying undercoat or flatting varnish which shall be allowed to
dry hard before applying the finishing coat. The number of coats to be applied shall be as
specified. For works where clear finish of French polish is specified the prepared surfaces
of wood shall be applied with the polish using a pad of woolen cloth covered by a fine
cloth. The pad shall be moistened with polish and rubbed hard on the surface in a series of
overlapping circles to give an even finish over the entire area. The surface shall be allowed
to dry before applying the next coat. Finishing shall be carried out using a fresh clean
cloth over the pad, slight dampening with methylated spirit and rubbing lightly and quickly
in circular motions. The finished surface shall have a uniform texture and high gloss. The
number of coats to be applied shall be as specified.
Painting of Steel Work:
· Red-oxide – zinc chrome primer shall conform to IS:2074.
· Synthetic enamel paint shall conform to IS:
· Aluminum paint shall conform to IS:2339.
All the materials shall be of the best quality from an approved manufacturer. Contractor
shall obtain prior approval of the GWSSB for the brand of manufacture and the color/shade.
All the materials shall be brought to the site in sealed containers.
Painting work shall be carried out only on thoroughly dry surfaces. Painting shall be
applied either by brushing or by spraying. Contractor shall procure the appropriate quality
of paint for this purpose as recommended by the manufacturer. The workmanship shall
generally conform to the requirement of IS:1477 (Part 2).
The type of paint, number of costs etc. shall be as specified in the respective items
of work. Primer and finish paint shall be compatible with each other to avoid cracking and
wrinkling. Primer and finish paint shall be from the same manufacturer. All the surfaces
shall be thoroughly cleaned of oil, grease, dirt, rust and scale. The methods to be adopted
using solvents, wire brushing, power tool cleaning etc., shall be as per IS:1477 (Part – I)
GWSSB RADHANPUR Page
Volume – II Price Bid Radhanpur & Santalpur RWSS (5 Years M & R)
and as indicated in the item of work. It is essential to ensure that immediately after
preparation of the surfaces; the first coat of red oxide-zinc chrome primer shall be applied
by brushing and working it well to ensure a continuous film without holidays. After the first
coat becomes hard dry, a second coat of primer shall be applied by brushing to obtain a
film free from `holidays. After the second coat of primer is hard dry, the entire surface
shall be wet rubbed cutting down to a smooth uniform surface. When the surface becomes
dry, the undercoat of synthetic enamel paint of optimum thickness shall be applied by
brushing with minimum of brush marks. The coat shall be allowed to hard-dry. The under
coat shall then be wet rubbed cutting down to a smooth finish, taking adequate care to
ensure that at no place the undercoat is completely removed. The surface shall then be
allowed to dry. The first finishing coat of paint shall be applied by brushing and allowed to
hard-dry. The gloss from the entire surface shall then be gently removed and the surface
dusted off. The second finishing coat shall then be applied by brushing. At least 24 hours
shall elapse between the applications of successive coats. Each coat shall vary slightly in
shade and this shall be got approved by the GWSSB.
GWSSB RADHANPUR Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
B_02. Royelty_18.06.19_New rate.pdf
F. Annexure 2 nsurance of work.pdf
G. Annexure 3 GR FDMSMe-file 0420252712D.M.O. Date -01042026.pdf
H_Annexure 4 Additional security Unabalance.pdf
I. Annexure 5 Insurance.pdf
J. Annexure 6 Gujarat state Purchase Policy-2016.pdf
K.Annexure 7 Labour Circular.pdf
L .Annexure 8 Min wages Circular.pdf
M. Annexure 9 LD Deduction 10-1-2018.pdf
N. Annexure 10 Circular_26_SIGN BOARD.pdf
O. Annexure 11 shramyogi GR.pdf
P. Annexure 12 GST GR.pdf
Q. Annexure 13 entry in ERP.pdf
10-06-202 deposite suchna circular.pdf
VOL 1 Technical Bid RAS O and M FINAL.pdf
VOL 2 Price Bid RAS O and M Final.pdf
radhanpur rwss-Model.pdf
Deposit Release Circular.pdf
Download all tender documents and submit your bid