Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC L1 |
Tender Value
₹3.4 L
EMD Value
₹8,453
Closing Date
16 May 2026, 11:00 amClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer, PWD Buildings Subdivision Aluva
Dismantling of RCC structures, brickwork, plastering, painting, tile works, concrete works, reinforcement, and other allied civil works required in connection with the construction of new Lift.
2026_PWD_834277_4
PWD/BLDG/TR/1397/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Percentage
180 days
Aluva
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,453
Yes
13 Jul 2026
7 May 2026
18 May 2026
7 May 2026
16 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed estimate | |||||
| 1.001 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | - | cum | 1,554.43 | - |
| 1.002 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | - | cum | 728.74 | - |
| 1.003 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | 3,671.89 | ₹3,668.22 |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | 359.72 | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 7,932.89 | - |
| 1.006 | OD284292/2025-2026:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 1 | cum | 6,831.14 | ₹6,824.31 |
| 1.007 | OD284293/2025-2026:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1 | cum | 7,713.54 | ₹7,705.83 |
| 1.008 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | - | sqm | 353.61 | - |
| 1.009 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | - | sqm | 80.85 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
1.pdf
Tender Documents • 0.03 MB
nitsbd.pdf
Tender Documents • 1.67 MB
BOQ_1435564.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].