| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance SULTHAN BATHERY WAYANAD | SULTHAN BATHERY | WAYANAD | KERALA | ₹2.5 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | Shaji KC L1 |
|---|---|---|---|---|
| 1.01SOAK PIT | ||||
| 1.02 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.8 | M3 | 2,057.97 ₹1,646.38 Lowest |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.Ordinary rock | 10.68 | M3 | 417.47 ₹4,459.41 Lowest |
| 1.04 | Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc. | 71.22 | M2 | 721 ₹51,346.01 Lowest |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 gradedstone aggregate 20 mm nominal size) | 2.12 | M3 | 11,022.69 ₹23,312.99 Lowest |
| 1.06 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelMild steel and Medium Tensile
steel bars | 126.9 | KG | 97.25 ₹12,341.03 Lowest |
| 1.07 | Supplying and stacking at site.63 mm to 45 mm size stone aggregate | 1.53 | M3 | 1,818.96 ₹2,775.73 Lowest |
| 1.08 | Supplying and stacking at site.53 mm to 22.4 mm size stone aggregate | 5.2 | M3 | 2,072.52 ₹10,770.89 Lowest |
| 1.09 | Providing and laying in position cement concrete of specified grade excluding the costof centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 0.29 | M3 | 7,256.34 ₹2,089.83 Lowest |
| 1.10 | Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cmor nearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 0.22 | M3 | 6,994.23 ₹1,510.75 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,241
Closing Date
6 Aug 2026, 6:00 pmClosed
Regional Project Director
2nd Floor, Bldg.No.3/253, Near AKG Hospital, Talap, Kannur
Grey Water Management Project 2025-26 - Community level SOAKPIT in Unnikkulam GP - Kozhikkode district
2026_KRWSA_854528_1
KRWSA-KNR/33/2025-TA/R
Open Tender
Civil Works - Water Works
Item Rate
180 days
Unnikulam Grama Panchayath Kozhikode District
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹6,241
18 Aug 2026
5 Jun 2026
10 Aug 2026
5 Jun 2026
6 Aug 2026
5 Jun 2026
5 Jun 2026 - 31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | SOAK PIT | - | - | - | - |
| 1.02 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | M3 | 2,057.97 | - |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.Ordinary rock | - | M3 | 417.47 | - |
| 1.04 | Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | M2 | 721.7 | - |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 gradedstone aggregate 20 mm nominal size) | - | M3 | 11,022.69 | - |
| 1.06 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelMild steel and Medium Tensile
steel bars | - | KG | 97.25 | - |
| 1.07 | Supplying and stacking at site.63 mm to 45 mm size stone aggregate | - | M3 | 1,818.96 | - |
| 1.08 | Supplying and stacking at site.53 mm to 22.4 mm size stone aggregate | - | M3 | 2,072.52 | - |
| 1.09 | Providing and laying in position cement concrete of specified grade excluding the costof centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | - | M3 | 7,256.34 | - |
| 1.1 | Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cmor nearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 1 | M3 | 6,994.23 | ₹6,993.53 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1444241.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 1.55 MB
BOQ_1444241.xls
BOQ • 0.29 MB
TimeExtension.pdf
PDF • 0.64 MB
Corrigendum09072026.pdf
PDF • 0.23 MB
Corrigendum.pdf
PDF • 0.65 MB
CORRIGENDUM.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .