Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹4,680
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer
Irrigation Division Pulwama
Desilting of Intake and sump of Koil Lift Irrigation scheme at Stage 1st at Larkipora
2026_IFC_319536_2
NIT 10 OF 2026-27
Open Tender
Civil Works
Percentage
10 days
Irrigation Division Pulwama
Please refer Tender documents.
7 documents required · 7 mandatory
₹300
Chief Engineer Kashmir Irrigation nad flood contrl
₹4,680
5 Aug 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) | 1,082.14 | Cum | 184.95 | ₹2,00,141.79 |
| 2 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | 200 | KL | 167.8 | ₹33,560 |
| 3 | Taking,Editing,printing HD Photographs(6''x4") geotagged photographs before and after execution of work | 6 | No | 50 | ₹300 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1058798.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .