MID/J/149
Extraction of stop log gates of old bay and additional new bay along with allied works at Main Ranbir Canal Head Works Akhnoor
Construction of pump house at Seethatuth for achieving balance FHTCs for village Bachinaar with allied works balance part
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil
Construction of RCC Channel including protection work by way of crates on Shetergam ladi at RD 600 mtrs.
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth blead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil :
Checking of leakages of Dadi Canal at Spots
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Restoration of embankment by way of L/Wall on L/S of escape channel near L/o Qurat-Ul-Ain and others
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil:
Restoration of embankment by way of Lining wall on Akhal Najwan canal (Satrina Branch) near the L/O Ab. Rasheed Mir (RD-6600Mtrs ), near L/O Ab. Samad Mir (RD 10000 Mtrs) and Const. Of Retaining Wall near L/O Ab. Salam Magray
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil: