Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
16 Dec 2026, 1:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer MICD Jammu
O/o Executive Engineer MICD Jammu
LIS Zindapeer Restoration Recapitalizationofdamageddueto flashfloodsbywayofproviding and fitting of100Amp MainswitchFootvalvesFASD Starter cum Panel for2 No 3 Phase20 HPMotorsconsisting of 80AmpContractors along with Recapitalization 63KVAtransformer
2026_IFC_332270_1
MICD/J/34 of 2026-27
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
90 days
Zindapeer
As per SBD
9 documents required · 9 mandatory
₹500
Yes
Executive Engineer MICD Jammu
₹13,000
Yes
O/o Executive Engineer MICD Jammu
26 Nov 2026
26 Nov 2026
17 Dec 2026
26 Nov 2026
16 Dec 2026
2 Dec 2026
1 Dec 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, Fitting, Installation, Testing & Commissioning of protection panel cum FASD star delta starters at LIS Zinda Peer with the following specifications:
Description of Panel
Designing, fabrication, installation, testing and commissioning of LT control panel 415 volts, AC-3 Phase, 50 Hz. For unit no. 1 and 2, with one incoming and two no. outgoing for 20 HP Induction motors (2 No.) at LIS Zinda peer. The panel shall be dust and vermin proof fabricated out of 16 SWG CR Sheet supported on M.S. angle of suitable size and having provision for fixing it on the ground with the help of foundation bolts. The panel should be sturdy enough for vibration free operation and should be equipped with suitable locking/sealing arrangements. The structure should be provided with suitable entry and exit holes for incoming and outgoing cables. The panel should be given two coats of antirust primer and two coats of steel grey enamel paint. The panel should have equipped with following components/features: -
1. M.C.C.B :The panel incomer should be fitted with a main incomer M.C.C.B. of 100 Ampere capacity (1 No.) and Outgoer MCCBs of 63 amp. Capacity (2 No.) for the two three phase motors, 1 no. voltmeter, 1 no ammeter along with a set of CTs, 1 No. V.S.S, 1 No. A.S.S. and a set of RYB indicators at incoming side. P/f of 32amp. 3 pole MCCB for the 2HP monoblock priming pump.
2. Star delta Starter: - Fully automatic star delta starter cum panel for unit no I and unit no 2 should comprises of 2 Nos (for unit I & II) Main contactor of 80 Amp capacity each, 2 Nos. (for unit I & II) Delta contactor of 50 Amp capacity each, 2 Nos (for unit I & II) Star contactor of 40 Amp capacity each. 2 Nos (for unit I & II) star delta timer with timing range from 3 to 120 seconds, 4 Nos. push buttons for start and stop operation of both motor, 2 No. indicator 2 No. MCB 6 Amp for the protection of internal control wiring, a neat and clean internal control wiring should be made with flexible copper cables to complete the star delta circuit of outgoing supply for pumping unit no. 1 and pumping unit no 2.
3. Protection relay device cum Fault analyser: A protection relay device cum fault analyser shall be fitted with the panel with capability to protect the motor by isolating the power supply of motor by de-energizing the starter/panel from following electro-mechanical faults which may otherwise damage the motor windings:
A. Voltage related protection: Single phasing, under voltage, over voltage, unbalance voltage.
B. Current related protection: Over current/load, dry running, unbalance current /load, earth leakage, short circuiting.
C. Mechanical fault related protection: Locked rotor etc.
a. Display line current of RYB Phase and also line voltage of RY and YB phase.
b. Display and indicate trip status for over load, under load, single phase, unbalance, earth fault, over voltage, under voltage respectively.
4. Thermal overload relay: Thermal over load relays of suitable range should be fitted within the starter cum panel for each 20 HP motor as an extra protection to protect the motor in case of failure of fault analyser.
The job also includes shifting of the old flood damaged LT control panel from LIS Zindapeer to the sub divisional store at Jammu. Complete job includes cost of providing, Transportation Charges, installation, testing & commissioning charges at site, tool and tackles charges, hire charges of skilled and unskilled labour, To and fro transportation charges at site of LIS and all other kind of associated charges. | 1 | One Job | 65 | ₹65 |
| 2 | Recapitalisation by doing Repairs to the 63 KVA electric transformer of LIS Zinda peer by way of shifting of the damaged transformer at workshop. Removing the top cover after unscrewing all the nuts and bolts along with dismantling of damaged HT & LT bushes. Draining out of transformer oil from transformer tank at site. Extraction of the damaged coil assembly using chain pulley and other allied tools and tackles. Dismantling of damaged HT coils and LT Coils from the coil assembly and rewinding of HT coils for 2 No. legs of the transformer with the aluminium wire of requisite specifications as per original design and varnishing complete. Dehydrating/drying the coils. Reconditioning of LT coils with insulation material and varnishing complete. Servicing, cleaning and flushing of transformer tank by using appropriate chemicals to clean all the deposits and repair to the transformer body & radiator of the transformer to plug the leakage at multiple spots, drying completely. Fitting of the newly rewound coils to the legs of the coil assembly and fitting of the core and making connections of the coil assembly. Lowering of the coil assembly in the container after making proper connections. Providing and filling of fresh transformer oil 130 litres in the tank of the transformer. Providing and fitting of 3 No. HT and 4 No. LT bush rods, set of gasket, sundry items and insulation required. Complete assembling of transformer using new nuts, bolts and washers as per site requirement. Making all the electrical connections on HT and LT side along with proper insulation. Checking for continuity, insulation and putting the transformer on no load and then on full load. Shifting of transformer back to the site at LIS Zindapeer. Providing & fitting of new MS channels for support to the transformer at base and installation of transformer onto the poles. Making proper connections on the LT & HT bush side. Complete Job is inclusive of rebate cost on account of old damaged winding & other worn-out parts and the job also includes cost of material, skilled/semi-skilled labour charges, carriage/shifting charges, hire charges of tools and tackles required at LIS Zindapeer. Complete Job. | 1 | One Job | 65 | ₹65 |
| 3 | Providing, Fitting and installation of 1 No. 200 mm dia foot valve for the pumping unit No.1 at LIS Zindapeer and by way of extraction of old flood damaged foot valve from the suction pipes using skilled labor, along with other tools and tackles. Repairs to1 No. choked foot valves 200mm dia. Of pumping unit No.2 of L.I.S Zindapeer done by way of dismantling the foot valve & suction pipe, then cleaning of mud/silt from suction pipes and foot valves using special tools & tackles and providing/fitting of new leather washers cut to size, adjustment of flaps with repairs to hinges of the foot valve. Reassembling the foot valve along with suction pipes. The job further involves joining of flanges as per foot valves size to the MS suction pipe and installing the foot valves on MS suction pipe end by p/f of appropriate no. of nuts, bolts and rubber gaskets as per size by way of lowering of the foot valves along with suction pipe by using chain pulley block/tools and tackles and skilled labour, joining of the foot valves with the suction pipes. Repairs to the priming pump’s suction pipe and providing/fitting of 50mm dia. foot valve at the priming suction pipe in place of flood damaged existing one. Shifting of the old 200mm damaged foot valve to sub divisional store at Jammu. The job further includes desilting of the sump at the suction side using hydraulic excavators and cleaning the sump. The job also includes restoration and cleaning of inlet water channel (approx.100m in length) connected to the sump from the nearest river source by way of desilting & removal of stones/boulders from the water channel using hydraulic excavators and machinery. Making the inlet water channel functional again by bringing the river water to the sump. Complete job includes cost of providing/ Fitting, Transportation Charges, tool and tackles charges, hire charges of skilled and unskilled labour, To and fro transportation charges at site of LIS and all other kind of Charges. | 1 | One Job | 65 | ₹65 |
| 4 | Providing/fitting of Aluminium 3.5 core PVC insulated LT cable of 70 mm2 capacity of reputed make as per IS 7098 (Part 1) 1988 with up-to-date amendments of 14m in length from outer pole near the pump room to the main switch along with p/f of thimbles. The job also includes P/f of Aluminium single core PVC insulated LT cable of 50 mm2 capacity of reputed make as per IS 7098 (Part 1) 1988 with up-to-date amendments of approximately 36m in length for each motor unit (i.e. 72 m in total length) from the FASD starter cum panel to the two individual motor units. The job includes cutting the aforesaid cable as per requirement & p/f of 24 No. thimbles of requisite specifications by preparing all the ends of the LT cables and then making proper connections from the motor to the FASD starter cum panel. The job also includes P/f of Aluminium single core PVC insulated LT cable of 95 mm2 capacity of reputed make as per IS 7098 (Part 1) 1988 with up-to-date amendments of approximately 10m in combined length from LT bush rods of the transformer to the connection points onto the pole along with providing and fitting thimbles (4 No.) and making connections with the LT bush rods of the transformer. The job also includes P/f of 100 Amp. HRC fuse based main switch in place of damaged worn out existing one. The job includes disconnecting the old LT cable connections from the worn-out main switch and extracting it by way of tools and tackles. Installation of new 100 Amp. Main switch main switch by using nut-bolt or fasteners. The job further includes making back the LT cable connections from both the transformer and the Voltage stabilizer side onto the newly installed main switch. Complete job is inclusive of rebate cost on account of old worn-out parts, cables, fully damaged 20 HP ATS (2 No.) and the job includes cost of material, providing/ Fitting, Transportation Charges, tool and tackles charges, hire charges of skilled and unskilled labour, To and fro transportation charges at site of LIS and all other kind of associated Charges. | 1 | One Job | 65 | ₹65 |
| 5 | Desilting of pump house from inside, periphery and approach pathway to the pump room entrance caused due to flash flood, which has resulted in accumulation of sand/silt and other unwanted material thus causing heavy damage to the installed existing electro mechanical components. The job further involves clearance of sand, silt and unwanted material from inside the pump room. Complete desilting of the pumproom & there after cleaning and washing the walls and floor of the pump house and then placing and fixing the components in the respective positions. Further removing of wooden blocks, bushes, stones and pebbles and other unwanted material from periphery including the suction area. The job has to be executed by engaging labour and necessary tools and tackles. The job also involves throwing away of wooden blocks, silt, sand and stones and other unwanted materials away from the pump house at certain distance from the site at a suitable place. The job has to be executed by way of engaging labour/ handcart and other necessary required tools and tackles. The job further involves cleaning of electro-mechanical equipments from the outer surfaces as well as inner surfaces including all the small components hosted by the equipments. The job also includes Providing/ fitting of rolling steel shutter to pump house along with allied works at LIS Zindapeer in place of fully damaged/washed out one. The job involves fabrication of rolling steel shutter of size 10.5 ft x 8.5 ft of superior quality, carriage to the site of LIS by transport and shifting near to pump house by head load. Fitting of shutter to the entrance of the pump house of LIS Zindapeer. P/F of MS channel grooves on both sides of wall since the grooves act as sliding mechanism for rolling shutter along with its complete finish necessary for smooth sliding. The job further involves Provide and fitting of 2 No. centre locks at the newly installed rolling shutter of pump room at LIS Zindapeer by way of welding the centrelocks at the base of the shutter at equidistant from the two side ends. The job further involves digging of 2 No. pits for installation of 2 No. clamp locking frames and fixing them using cement concrete mixture within the pits for the 2 No. welded centre locks. Complete Job is inclusive of rebate cost on account of worn-out rolling shutter parts and the job includes cost of material, providing/ Fitting, Transportation Charges, tool and tackles charges, hire charges of skilled and unskilled labour, To and fro transportation charges at site of LIS and all other kind of Charges. (Complete job) | 1 | One Job | 65 | ₹65 |
| 6 | Repairs/Reconditioning of 2 cusec discharge, 16 m Head H.C pumps coupled with 20HP Motors (2 No.) with allied works at site of LIS Zindapeer which was affected in the flash floods. The job involves disconnection of motors, dismantling of the pumps, de-coupling from the motor and suction delivery lines at site, P/F of new gland packing 12 mm dia. with nuts, bolts as per specifications. Applying sufficient amount of grease including gland packing to avoid excessive wear and tear. Dismantling of the 20 HP three phase induction motors (2 No.). Cleaning the stator and rotors, drying the windings using heater/hot air in controlled way so as not to damage the windings due to heat for two to three days intermittently and then applying two coats of varnish and drying each coat by hot air process. Fitting the rotor and complete greasing of bearings properly. Refitting bearings in housings, greasing properly and reassembling the motors. Reinstalling the pumps and motors at their installed position. Job includes proper fitting of pumps and motors on base frame, leveling and alignment of pumps and motors after fitting of coupling pulley sets.
Servicing/Repairs of 2 HP mono block priming pump set by way of dismantling of the priming pump, de-coupling from suction & delivery lines at site, P/F of new gland packing 4 mm dia. with nuts, bolts as per specifications. Applying sufficient amount of grease including gland packing to avoid excessive wear and tear. Cleaning the stator and rotors, drying the windings using heater/hot air in controlled way so as not to damage the windings due to heat for two to three days intermittently and then applying two coats of varnish and drying each coat by hot air process. Fitting the rotor and complete greasing of bearings properly. Complete assembling of priming pump and its refitting back to its position at site for installation.
Complete job includes cost of material used and labour charges for skilled and semiskilled labour to be employed at site for execution of job, transportation charges etc. | 1 | One Job | 65 | ₹65 |
| 7 | Repairs to the flood damaged 63KVA voltage stabilizer of LIS Zindapeer. Job includes shifting of the stabilizer by manual labor for loading of the same in the transport vehicle for further carriage to the workshop by employing hydraulic crane or/and manual labour at site. Replacement of the worn-out components of the voltage stabilizer at workshop and repairs to the coil assembly by way opening of its top cover/panel for extraction of inner assembly including the flood damaged copper coils and the core. Providing and fitting by way of rewinding of new copper coils for all the three no. legs with copper conductor of requisite size and specifications as per the existing sample, new insulation material and nuts/bolts, varnishing drying in hot air circulation. Cleaning of the core and reconditioning it. Fitting of the newly rewound coils to the legs of the coil assembly and assembling of the core and making connections of the coil assembly. Lowering of the coil assembly along with core inside the casing. Providing and fitting of top cover gasket, nuts/bolts and complete reassembling of the stabilizer at workshop. Checking and testing the stabilizer at the workshop. Shifting back the voltage stabilizer to the site. Unloading the same at site employing hydraulic crane/manual labour and shifting it into the pump room for re-installation. Reinstallation of the voltage stabilizer in the pump room by fixing all the electrical connections, providing/fitting of new nuts/bolts. Filling up with 150 litres of fresh Toil in the voltage stabilizer (to be provided by the department). Testing of the 63 KVA voltage stabilizer at site. Complete Job is inclusive of rebate cost on account of old damaged copper winding & other worn-out parts and the job also includes cost of materials, hydraulic crane charges, skilled/semi-skilled labour charges and tools and tackles required during the execution of the job. | 1 | One Job | 65 | ₹65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
SBD34.pdf
Tender Documents • 0.89 MB
BOQ_1128034.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .