SUPERINTENDING ENGINEER
SE OFFICE EDC PITHORAGARH
CONSTRUCITON OF 11 KV LT LINE FOR DUTIBAGARH JAULJIBI PEYJAL SCHEME UNDER JJM SCHEME UNDER EDD DHARCHULA
2023_UPCL3_66912_1
25/EDC(P)/2023-24
Open Tender
Electrical Works
Turn-key
90 days
DHARCHULA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EE EDD UPCL PITHORAGARH
₹75,000
2 Feb 2024
27 Dec 2023
9 Jan 2024
27 Dec 2023
8 Jan 2024
27 Dec 2023
Amount
SUPPLY OF FOLLOWING CENTRALISED MATERIAL
T/F 11/0.4 25 KVA
T/F 11/0.4 63 KVA
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
ACSR weasel Conductor
M.S. channel 100×50 mm
M.S. angle 50x50x6 mm.
MS Angle 75x75x8 mm (for T/F base & guarding angle)
11 KV Polyemer Disc insulator
11kv Disc fitting 45 KN
11 KV Polyemer Pin insulator with Pin
Earthing rod 20 × 2500 mm.
GI wire 6 SWG (for guarding & earthing)
11 KV GO switch (TPMO)
LT XLPE Cable 1X70 Sq mm
Stay SET 16 × 1800 mm.
Stay wire 7/10 SWG
LT Pil.resi.MC CTR for all ration (CT Accuracy class-1)
Electronic 3P 4W LT TVM RS-232 Port
Electronic KWH Meter 3P 4W 10-60 A with box
Lighting Arrester 9KV 5KA(polymer)
SUPPLY OF FOLLOWING NON CENTRALISED MATERIAL
Top channel clamp & PP for SP-23 with nut & bolt
Holding Clamp TPMO , fuse set, T/F base plate, guarding angle etc with N&B
Earth wire clamp for SP-23 with N&B
Top bracing set clamp for SP-23 with N&B
Bottom bracing set clamp for SP-23 with N&B
E - clamp for 11 KV Pin
11 KV fuse set
LT Shackle insulator clamp for SP-21 with N&B
Shackle insulator with N&B
Stay clamp D/E with N&B for SP-23
Stay clamp S/E with N&B for SP-23
Stay clamp S/E with N&B for SP-21
Stay insulator
Eye hook for guarding
MS bolt with nut 216x16
MS Bolt with nut 25x16
LABOUR CHARGE
Cartage of Steel poles from concer firm to construction site with loading & unloading at both points approx distance 600 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Other material(Centralised Items)
T/F 11/0.4 25 KVA
T/F 11/0.4 63 KVA
Head load cartage of following material from road to site approx distance 1.40 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Other material(Centralised Items+De-Centralised Items)
T/F 11/0.4 25 KVA
T/F 11/0.4 63 KVA
Exavation of earth for pole pit of size 0.9x0.9x1/6 of full lenth of polestay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
Steel pole 8.5 mtr. SP-23(0.765X34)
Steel pole 8.5 mtr. SP-21(0.765X6)
erection of pole support as per RESSPO specification of the following types of poles in boulder mixed soil, grouting of support in CC 1:4:8 block incuding cost of ballast,cement and sand, back filling of soil and boulders in pit and ramming filling of accessories of the pole, leveling and erection of pole
SP-23 (with CC) Double Pole
SP-21 (with CC) Single Pole
Grouting of pole in size 0.45x0.45x1/9 of the supprt in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual
Steel pole 8.5 mtr. SP-23(0.2565X34)
Steel pole 8.5 mtr. SP-21(0.2653X6)
Muffing of poles with CC1;3;6 block and 45 Cm hight from ground level including cost of ballast, cement & sand.
Fabriction of MS Channel, angle iron after cutting in requeired sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESSPO
Exavation of earth for stay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.(0.432X82)
Fixing, tightening and nozzling of stay with pole and stay rod for 11 KV
Grouting of stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling.(82X0.108)
Erection & earthing of support with MS Earth rod of 2.5 Mtr long incuding exavation of pit and digging of MS rod proper depth and connecting the earth electrode with the GI wire as per instruction manual
Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart
Laying, spreading, stringing and sagging of LT line with ACSR Weasel conductor 3 P 4W
Route clearance by cutting of tree branches/ proning, loping and chopping of trees for 11 KV line
Earthing of distribution T/F incuding digging of pit of size 2.5 mtr depth and make hole of size 150mm. Placing of earthing electrode(to be supplied by contractor as per drawing No A) as drawing B, connecting the same with GI strip(to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum length 6 mm, treatment of soil with highly conductive subustance as per IS 30343 complete in all respect, result of earthing resistance to be recorded in MB before and after instalation of earthing. the earth resistance after earthing should be less then 1 Ohm.
Mounting/fixing of TPMO on doble pole structure including making of connection complete work.
Mounting/fixing of fuse set on doble pole structure including making of connection complete work.
Mounting & fixing of LA set(3 No) on double pole structure including making all connection vy GI strip size 35x6 mm to earth point(incuding cost of GI strip)
Installation/Mounting of following T/F on D/P structure and fixing of channel and making all connections of HT and LT and its complete commissioning.
T/F 11/0.4 25 KVA
T/F 11/0.4 63 KVA
Construction of Protection wall for 11 KV structure
Excavation in all type of soil including ramming and dressing of surface DP(10X4.96)
Base concreting in 1:6:12 cc DP(10X1.66)
R&R Stone Massonary in 1:6 course fine sand & cement DP(10X.19.6)
Top concreting in 1:2:4 cc DP(10X0.34)
HP Stone Filling DP (10X6.72)
Saun Engineering and Construction Co P Ltd
M/s Shahi Electricals
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .