Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹14.8 LAccepted-Finance | ₹14.8 L | L 1 | Accepted-Finance Done |
| 2 | L 2₹16.9 L+₹2.1 L (14.4%)Accepted-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172029 | ₹16.9 L+₹2.1 L (14.4%) | L 2 | Accepted-Finance Done |
| 3 | L 3₹17.8 L+₹3.0 L (20.4%)Accepted-Finance | ₹17.8 L+₹3.0 L (20.4%) | L 3 | Accepted-Finance Done |
| 4 | L 4₹19.3 L+₹4.5 L (30.3%)Accepted-Finance VILL MANOH P O BASSI TEH JOGINDER NAGAR DISTT MANDI H P | JOGINDER NAGAR | MANDI | HIMACHAL PRADESH | ₹19.3 L+₹4.5 L (30.3%) | L 4 | Accepted-Finance Done |
| Sl No | Description | Qty | Unit | chamel singh L4 | Biri Singh Govt Contractor L3 | Arun Chaudhary L1 | HARDEEP SINGH L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils complete in all respect as per direction and best satisfactiEngineer -in Charge | 77.43 | Cum | 330 ₹25,551.9 | 175 ₹13,550.25 Lowest | 250 ₹19,357.5 | 250 ₹19,357.5 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering upto all meter, leads and lifts as per direction and best satisfaction of Engineer-in-charge.- All work up to plinth level : -1:5:10 (1 cement : 5 fine sand : 10 graded
stone aggregate 40 mm nominal size) | 13.41 | Cum | 5,200 ₹69,732 | 3,800 ₹50,958 | 3,500 ₹46,935 Lowest | 4,500 ₹60,345 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : -- 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size leads and lifts upto all meter, as per direction and best satisfaction of Engineer-in-charge | 12.16 | Cum | 6,900 ₹83,904 | 7,200 ₹87,552 | 5,800 ₹70,528 | 5,700 ₹69,312 Lowest |
| 4.00 | Reinforced cement concrete in beams, suspended floors,s having slope upto 15 degree landing, balconies , shelves, chajjas lintels including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :- 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal leads and lifts upto all meter, as per direction and best satisfaction of Engineer-in-charge size | 20.67 | Cum | 8,000 ₹1,65,360 | 7,200 ₹1,48,824 | 6,200 ₹1,28,154 | 5,800 ₹1,19,886 Lowest |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :- 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal leads and lifts upto all meter, as per direction and best satisfaction of Engineer-in-charge | 2.82 | Cum | 8,300 ₹23,406 | 7,200 ₹20,304 | 6,200 ₹17,484 | 5,800 ₹16,356 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for (a) Foundations, footings, bases of columns,etc. for mass concrete complete in all respect as per direction and best satisfactiEngineer -in Charge | 80.49 | Sqm | 310 ₹24,951.9 | 250 ₹20,122.5 | 250 ₹20,122.5 | 200 ₹16,098 Lowest |
| 7.00 | (B) Suspended floors, roofs, landings, balconies and access platform complete in all respect as per direction and best satisfactiEngineer -in Charge | 137.79 | Sqm | 540 ₹74,406.6 | 350 ₹48,226.5 | 250 ₹34,447.5 Lowest | 350 ₹48,226.5 |
| 8.00 | (D) Edges of slabs and breaks in floors and walls. Under 20 cm wide metre complete in all respect as per direction and best satisfactiEngineer -in Charge | 57.6 | Rmt | 210 ₹12,096 | 45 ₹2,592 Lowest | 120 ₹6,912 | 100 ₹5,760 |
| 9.00 | E) Columns, Pillars, Piers, Abutments, Posts and Struts complete in all respect as per direction and best satisfaction of Engineer -in Charge | 50.4 | Sqm | 630 ₹31,752 | 450 ₹22,680 | 250 ₹12,600 Lowest | 350 ₹17,640 |
| 10.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) complete in all respect as per direction and best satisfactiEngineer -in Charge | 21.81 | Cum | 7,000 ₹1,52,670 | 7,600 ₹1,65,756 | 6,600 ₹1,43,946 | 6,200 ₹1,35,222 Lowest |
Tender Value
₹16.1 L
EMD Value
₹32,500
Closing Date
20 Jul 2026, 5:00 pmClosed
Chairman, Temple Trust Shri Naina Devi Ji
Office of the Chairman, Temple Trust
Construction of Office and Toilet Complex at Kaulawala toba (Talab) for Temple Trust Shri Naina Devi Ji Distt. Bilaspur (H.P.)
2026_NDTT_138912_1
No.TTSND.Cons (T)-15-(21)-40/2026-3564 to 3576 Dated 01.07.2026
Open Tender
Civil Works
Item Rate
Shri Naina Devi Ji
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
Chairman, Temple Trust Shri Naina Devi Ji
₹32,500
Yes
26 Aug 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils complete in all respect as per direction and best satisfactiEngineer -in Charge | - | Cum | 1.25 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering upto all meter, leads and lifts as per direction and best satisfaction of Engineer-in-charge.- All work up to plinth level : -1:5:10 (1 cement : 5 fine sand : 10 graded
stone aggregate 40 mm nominal size) | 13.41 | Cum | 2.25 | ₹30.17 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : -- 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size leads and lifts upto all meter, as per direction and best satisfaction of Engineer-in-charge | 12.16 | Cum | 3.25 | ₹39.52 |
| 4 | Reinforced cement concrete in beams, suspended floors,s having slope upto 15 degree landing, balconies , shelves, chajjas lintels including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :- 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal leads and lifts upto all meter, as per direction and best satisfaction of Engineer-in-charge size | 20.67 | Cum | 4.25 | ₹87.85 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :- 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal leads and lifts upto all meter, as per direction and best satisfaction of Engineer-in-charge | 1 | Cum | 5.25 | ₹5.24 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for (a) Foundations, footings, bases of columns,etc. for mass concrete complete in all respect as per direction and best satisfactiEngineer -in Charge | 80.49 | Sqm | 6.25 | ₹503.06 |
| 7 | (B) Suspended floors, roofs, landings, balconies and access platform complete in all respect as per direction and best satisfactiEngineer -in Charge | 1 | Sqm | 7.25 | ₹7.24 |
| 8 | (D) Edges of slabs and breaks in floors and walls. Under 20 cm wide metre complete in all respect as per direction and best satisfactiEngineer -in Charge | 57.6 | Rmt | 8.25 | ₹475.2 |
| 9 | E) Columns, Pillars, Piers, Abutments, Posts and Struts complete in all respect as per direction and best satisfaction of Engineer -in Charge | 50.4 | Sqm | 9.25 | ₹466.2 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) complete in all respect as per direction and best satisfactiEngineer -in Charge | 21.81 | Cum | 10.25 | ₹223.55 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
SBD.pdf
Tender Documents • 2.01 MB
GST.pdf
Additional Documents • 0.84 MB
BOQ_205747.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .