| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹68.4 LAccepted-Finance VILLAGE DOHAL PO PATTI TEHSIL PALAMPUR DISTRICT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | L-1 | Accepted-Finance Lowest One | |
| 2 | L-2₹69.6 L+₹1.3 L (1.85%)Rejected-Finance | L-2 | Rejected-Finance High rate quoted | |
| 3 | L-3₹71.2 L+₹2.8 L (4.11%)Rejected-Finance VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | L-3 | Rejected-Finance High rate quoted | |
| 4 | L-4₹79.3 L+₹10.9 L (16.0%)Rejected-Finance VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | L-4 | Rejected-Finance High rate quoted | |
| 5 | Not Admitted-Fee/PreQual/Technical DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹96.3 L
EMD Value
₹1.3 L
Closing Date
5 Feb 2021, 11:00 amClosed
Executive Engineer
JSD Palampur
Construction of reinforcement cement concrete channel from Node No. 23 to 24 at RD 3960_0 to 1050_ 1050 metre, Node No.25 to 26 from RD 4440_0 to 720 _ 720 metre, Node No.27 to 28 from RD 6090_0 to 350 _350 metre, Node No.29 to 30 from RD 6600_0 t
2021_HPIPH_43874_1
20056-95 dt 30/01/2021 Palampur
Open Tender
Civil Works
Item Rate
180 days
Palampur
Please refer Tender documents.
9 documents required · 9 mandatory
₹800
Executive Engineer
₹1.3 L
Yes
6 Sept 2021
30 Jan 2021
5 Feb 2021
30 Jan 2021
5 Feb 2021
30 Jan 2021
Amount
Excavation in drain and channels etc. in all kinds of soil such as pick work,jumper work,blasting work soft and hard rock and saturated soil including dressing of sides and beds and disposing of excavated earth within all leads and lifts as per the direction of Engineer-in-charge.
Dressing of bed and prepration of sub-grade for stone lining in all kind soil within all leads and lifts as per the direction of Engineer -in-charge.
Excavation in foundation trenches etc.in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge within all leads and lifts.
Providing and laying cement concrete 1:6:12 (One cement is to six sand is to twelve graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in:-
Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge.
Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge.
Suspended floors,roofs landing shelves and their supports balconies beams, girders and cantilevers upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge.
Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200 milimetre in thickness within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
Square rubble masonry coursed with hard stone of approved quality in foundation and plinth including racking out joints in cement mortar 1:4 (One cement is to four sand) within all leads and lifts as per the direction of Engineer-in-charge.
15 milimetre (Fifteen milimetre) thick cement plaster in single coat on rough side of brick/stone masonry for interior plastering upto floor two level including arrises internal rounded angles chamfers and/or rounded angles not exceeding 80 milimetre in girth and finished even and smooth in cement mortar 1:3 (One cement is to three sand) within all leads and lifts as per the direction of Engineer-in-charge.
15 milimetre (Fifteen milimetre) thick cement concrete topping 1:2:3 (One cement is to two to three graded stone aggregate of size 4.75 milimetre below by volume) laid over and finished monolithic with base concrete within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:5:10 (One cement is to five sand is to ten graded stone aggregate 40 milimetre nominal size) with 15% plum and curing complete excluding the cost of form work in retaining walls/breast walls, the size of plums shall usually be 150 milimetre to 300 milimetre as per HPPWD specification within all leads and lifts as per the direction of Engineer-in-charge
Providing and fixing mild steel plates for 90 V-Notch and gates within all leads and lifts as per the direction of Engineer-in-charge.
Providing and fixing PVC water stop seal 20 metre center to center of expension cum construction joint within all leads and lifts as per the direction of Engineer-in-charge.
OM PARKASH KAPOOR
AMIT CHOUDHARY
MADAN KATOCH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .