Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Gondal Nagarpalika, Gondal
BID DOCUMENTS FOR CONSTRUCTION WORK OF BOX CULVERT, AS PER VARIOUS LOCATION OF GONDAL NAGARPALIKA, UNDER SWARNIM JAYANTI CHIEF MINISTER URBAN DEVELOPMENT SCHEME, AT. GONDAL, DIST.: RAJKOT
275781
Feb-26/Box Culvert
Open
Civil Works
Rajkot
3 documents required · 3 mandatory
₹18,000
Chief Officer, Gondal Nagarpalika, Gondal
₹11.0 L
12 Feb 2026
12 Feb 2026
12 Feb 2026
24 Feb 2026
12 Feb 2026
NAME OF WORK:- CONSTRUCTION WORK OF BOX CULVERT, AS PER VARIOUS LOCATION, AT. GONDAL
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
PERCENTAGE RATE TENDER
Sr.No. Schedule Amount
1 Schedule - "B"- 1
2 Schedule - "B"- 2
3 Schedule - "B"- 3
4 Schedule - "B"- 4
5 Schedule - "B"- 5
6 Schedule - "B"- 6
7 Schedule - "B"- 7
8 Schedule - "B"- 8
9 Schedule - "B"- 9
10 Schedule - "B"- 10
11 Schedule - "B"- 11
12 Schedule - "B"- 12
13 Schedule - "B"- 13
14 Schedule - "B"- 14
15 Schedule - "B"- 15
16 Schedule - "B"- 16
17 Schedule - "B"- 17
18 Schedule - "B"- 18
19 Schedule - "B"- 19
20 Schedule - "B"- 20
21 Schedule - "B"- 21
22 Schedule - "B"- 22
23 Schedule - "B"- 23
24 Schedule - "B"- 24
25 Schedule - "B"- 25
26 Schedule - "B"- 26
27 Schedule - "B"- 27
Total Amount Rs.
Total Amount Rs.
I/We am/are willing to carry out the work @ ________% Above / Below_____________Percentage (should be writen in
figures and words) of the Estimated rates mentioned above amount of my / our Tender works out as under.
Estimated Amount Estimated Amount
Put to Tender Rs. 11,01,58,613=00 Put to Tender Rs. 11,01,58,613=00
Total Rs. Total Rs.
(In Words (In Words
Signature of the Contractor
Consl. Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ramanath Dham, Umbala Chowkadi, At - Gondal.
SCHEDULE - "B-1"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 22.10 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 5.90 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 62.40 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 75.60 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 41.70 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 401.30 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 36.12 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 6.80 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 3.75 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 162.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 647.90 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 18.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.30 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 30.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 243.50 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 27.50 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Gundala Road, Near Aanand Color Shop, At - Gondal.
SCHEDULE - "B-2"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 21.60 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 4.10 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 17.20 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 14.90 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 12.10 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 76.60 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 6.90 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 1.34 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 1.09 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 45.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 86.40 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.12 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 10.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 67.20 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 6.50 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Gundala Road, Near Sonal Street, At - Gondal.
SCHEDULE - "B-3"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 16.20 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 4.10 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 12.90 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 11.50 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 9.10 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 66.70 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 6.00 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 1.04 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 0.82 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 38.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 52.80 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 9.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 1.54 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 10.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 56.40 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 4.00 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Gundala Road, Near Khodal Cement, At - Gondal.
SCHEDULE - "B-4"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 21.60 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 5.40 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 15.80 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 21.00 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 17.60 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 62.80 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 5.65 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 1.89 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 1.59 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 35.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 57.60 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.12 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 20.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 52.80 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 4.30 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Gundala Road, Krishna Apartment, At - Gondal.
SCHEDULE - "B-5"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 25.20 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 7.40 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 20.80 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 24.10 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 20.60 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 78.90 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 7.10 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.17 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 1.85 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 44.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 92.80 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 14.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.58 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 20.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 66.40 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 7.00 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Khodiyarnagar-2, Near Randal Mata Temple, At - Gondal
SCHEDULE - "B-6"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 24.30 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 9.50 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 20.00 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 33.10 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 29.70 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 103.80 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 9.35 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.98 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.68 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 52.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 88.40 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.28 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 25.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 77.60 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 4.30 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- NH Service Road, At - Gondal
SCHEDULE - "B-7"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 23.00 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 7.70 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 16.50 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 31.90 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 28.70 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 80.30 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 7.23 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.87 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.59 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 48.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 67.20 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 17.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.83 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 25.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 71.80 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 3.30 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Pramukhnagar, Near Rasashram, At - Gondal
SCHEDULE - "B-8"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 101.30 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 33.80 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 52.20 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 113.90 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 108.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 200.20 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 18.01 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 10.25 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 9.72 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 67.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 154.70 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 15.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 4.26 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 60.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 100.50 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 7.60 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Pramukhnagar, Near Rashashram, At - Gondal.
SCHEDULE - "B-9"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 29.30 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 9.40 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 24.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 29.10 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 25.10 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 96.80 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 8.72 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.62 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.26 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 49.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 106.00 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 13.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.61 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 25.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 74.00 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 8.00 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ranchodnagar-2, Arun Colony, At - Gondal.
SCHEDULE - "B-10"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 20.70 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 16.90 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 39.60 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 161.20 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 76.40 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 253.60 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 22.82 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 14.51 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 6.87 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 96.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 158.80 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 15.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 3.02 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 30.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 143.60 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 3.80 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ranchodnagar, Meldi Mata Temple, Radha Park, TP Road, At - Gondal.
SCHEDULE - "B-11"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 20.70 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 22.50 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100
mix and providing necessary vertical pin headers including formwork,
vibrating, ramming and curing complete. 64.00 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 222.00 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 112.40 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return
as per drawing including necessary shutering laying, vibrating, height from
0.00 to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 487.20 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 43.85 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per
detailed drawing. For well :- curb, staining, cap and RCC Raft. 19.98 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement
including cutting, bending, hooking, and tying complete as per detailed
drawing.(A) Solid Slab. 10.11 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C.
pipes of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 149.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all
lead and lift and including watering rolling and consolidation of subgrade
in layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 396.90 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade
concrete for using cement content as per approved design mix, improve
workability without impiring strength and durability as per direction of the
engineer in charge. (min cement level as per latest ID: 456 shall be
maintained) for 150mm thick trimix C.C Road with trimix vaccume
dewatering system work with power trowling sheet form with M.S
Channel, surface vibrator with providing road expansion joint having size
6mmx50mm by concrete cutter machine and filled with bitumen, finishing
with floor hardener necessary all equipments, all labour charges
complete. 25.50 5890.87 Cumt.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in
proper line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 15.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 40.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 224.00 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade -
II of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%)
filler i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with
vibratory roller8-10 tonnes in stages to proper garde and cmaber applying
and brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 9.50 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Sahjanandnagar, Near Ganesh Temple, At - Gondal.
SCHEDULE - "B-12"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 22.10 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 10.80 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 24.80 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 76.70 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 40.90 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 98.90 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 8.90 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 6.90 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 3.68 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 44.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 39.20 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.31 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 30.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 65.90 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 1.40 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Sahjanand nagar, TP Road, At - Gondal
SCHEDULE - "B-13"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 40.50 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 10.10 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 33.80 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 40.60 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 37.20 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 177.50 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 15.98 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 3.65 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 3.34 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 86.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 232.10 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 15.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 3.19 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 30.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 128.30 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 11.30 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Aashapura River Road, Near Meldi maa Temple, At - Gondal.
SCHEDULE - "B-14"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 216.00 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 85.50 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100
mix and providing necessary vertical pin headers including formwork,
vibrating, ramming and curing complete. 63.30 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 115.00 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 80.20 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return
as per drawing including necessary shutering laying, vibrating, height from
0.00 to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 426.80 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 38.42 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per
detailed drawing. For well :- curb, staining, cap and RCC Raft. 10.35 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement
including cutting, bending, hooking, and tying complete as per detailed
drawing.(A) Solid Slab. 7.22 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C.
pipes of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 123.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all
lead and lift and including watering rolling and consolidation of subgrade
in layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 722.10 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade
concrete for using cement content as per approved design mix, improve
workability without impiring strength and durability as per direction of the
engineer in charge. (min cement level as per latest ID: 456 shall be
maintained) for 150mm thick trimix C.C Road with trimix vaccume
dewatering system work with power trowling sheet form with M.S
Channel, surface vibrator with providing road expansion joint having size
6mmx50mm by concrete cutter machine and filled with bitumen, finishing
with floor hardener necessary all equipments, all labour charges
complete. 42.80 5890.87 Cumt.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in
proper line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 12.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 229.50 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade -
II of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%)
filler i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with
vibratory roller8-10 tonnes in stages to proper garde and cmaber applying
and brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 26.10 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Total Amounts Rs (2-Nos)….....…
Total Amounts Rs (2-Nos)….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Behind Balashram-1, At - Gondal.
SCHEDULE - "B-15"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 32.40 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 5.40 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 19.30 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 34.70 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 14.70 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 129.20 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 11.63 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 3.12 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 1.32 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 68.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 117.50 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.00 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 10.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 101.80 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 4.30 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Behind Balashram-2, At - Gondal.
SCHEDULE - "B-16"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 32.40 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 5.40 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 19.30 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 34.70 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 14.70 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 129.20 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 11.63 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 3.12 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 1.32 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 68.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 117.50 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.00 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 10.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 101.80 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 4.30 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Sukhnathnagar, Near Suryamukhi Hanuman Temple, At - Gondal
SCHEDULE - "B-17"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 48.60 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 14.40 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 29.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 53.00 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 48.60 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 144.80 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 13.03 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 4.77 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 4.38 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 61.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 117.90 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.71 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 30.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 91.50 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 5.80 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Bhagwatpara, Domadiya Society, At - Gondal.
SCHEDULE - "B-18"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 13.50 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 6.80 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 16.80 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 35.20 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 30.20 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 50.90 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 4.59 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 3.17 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.72 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 46.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 25.20 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 30.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 4.50 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 10.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 69.60 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 1.90 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Bhagvatpara, Sidi Samaj, Near Ghoghavadar Chowk, At - Gondal.
SCHEDULE - "B-19"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 72.00 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 30.00 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 49.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 144.20 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 90.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 225.80 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 20.33 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 12.98 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 8.10 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 89.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 117.50 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 20.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 4.34 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 20.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 133.80 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 4.30 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ghoghavadar Road, Jaydip Cement Street, At - Gondal.
SCHEDULE - "B-20"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 23.60 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 10.50 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 15.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 31.10 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 27.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 61.90 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 5.57 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.80 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.43 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 19.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 17.40 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 14.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.42 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 25.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 28.60 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 1.70 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ghoghavadar Road, Near Shrinathji Steel Fabrication, At - Gondal.
SCHEDULE - "B-21"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 23.60 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 10.50 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 15.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 31.10 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 27.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 61.90 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 5.57 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.80 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.43 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 19.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 17.40 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 14.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.42 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 25.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 28.60 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 1.70 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ghoghavadar Road, Tulshi Mamra, At - Gondal.
SCHEDULE - "B-22"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 31.50 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 10.10 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 14.90 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 31.10 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 27.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 46.10 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 4.15 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.80 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.43 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 25.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 21.20 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 14.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.41 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 25.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 37.60 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 1.60 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ghoghavadar Road, Kal bheiravdada Temple, At - Gondal.
SCHEDULE - "B-23"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 27.00 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 8.70 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 35.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 27.00 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 23.10 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 160.70 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 14.47 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.43 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 2.08 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 80.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 192.00 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 12.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.81 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 30.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 120.00 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 14.40 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Opp. Malaviya Sump, At - Gondal.
SCHEDULE - "B-24"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 36.00 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 17.10 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 29.20 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 51.00 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 45.60 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 90.60 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 8.16 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 4.59 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 4.10 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 41.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 81.60 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 16.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 3.32 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 25.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 60.80 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 6.10 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Nagnath Mahadev Temple, At - Gondal
SCHEDULE - "B-25"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 26.30 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 6.30 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 8.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 24.90 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 22.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 29.90 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 2.69 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.24 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 1.98 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 26.00 90.83 Nos.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 13.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.02 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 12.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 39.00 1298.38 Sqmt
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Kantoliya Road, Near Koli Samaj Smashan, At - Gondal
SCHEDULE - "B-26"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 26.30 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 6.30 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 8.70 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 24.90 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 22.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 29.90 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 2.69 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 2.24 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 1.98 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 26.00 90.83 Nos.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 13.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 2.02 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 12.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 39.00 1298.38 Sqmt
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
GONDAL NAGARPALIKA - GONDAL
SCHEME : SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJNA
NAME OF WORK :- CONSTRUCTION WORK OF BOX CULVERT
Location :- Ganji Vada, Near Khetalavala Meladi Ma Mandir, At - Gondal
SCHEDULE - "B-27"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Demolition of Brick Work and Stone Masonry including stacking of
serviceable materilas and disposal of unserviceable materials with all lead
and lift. (ii) in Cement Mortar. 101.30 589.70 Cumt.
Demolition and disposal of unserviceable materials with all lead and lift. (i)
Cement concrete. 33.80 652.69 Cumt.
Excavation for foundation in hard murrum and boulders and very stiff or
sticky, clays and other similar strata including shoring and strutting and
dewatering as necessary and disposing of the excavated stuff as directed.
Providing and filling in foundation with ordinary Cement concrete M-100 mix
and providing necessary vertical pin headers including formwork, vibrating,
ramming and curing complete. 52.20 3359.93 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Raft and
cut-off walls including necessary shutering laying, vibrating, ramming and
curing complete. 113.90 4877.29 Cumt.
Providing and casting in situ controlled cement concrete M-300 for
R.C.C. solid slab including centering, scaffolding curing and finishing
complete. 108.00 5613.58 Cumt.
Providing & Laying controlled cement concrete M-300 for R.C.C Return as
per drawing including necessary shutering laying, vibrating, height from
to 5.00 m (a) Pier, (b) Abutment (c) R.C.C. Return. 200.20 5484.30 Cumt.
Providing and laying in position FE 500D TMT bar reinforcement including
cutting, bending, hooking and tying complete as per detailed drawings for
the following.(A) Piers (B) Abutments (C) R.C.C. Returns 18.01 73858.69 MT.
Providing and placing in position FE 500D bar reinforcement for following
items including cutting bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft. 10.25 73858.69 M.T.
Providing and placing in position FE 500D TMT bar reinforcement including
cutting, bending, hooking, and tying complete as per detailed drawing.(A)
Solid Slab. 9.72 73243.02 M.T.
Providing and laying weep holes in abutment and return by using A.C. pipes
of 100mm diameter including laying in proper grade and jointing etc.
complete as per detailed drawings. 67.00 90.83 Nos.
Earthwork for embankment including breaking clods, dressing with all lead
and lift and including watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including filling the depression
which occur during the process using power roller 8T to 10T. (E) From
Borrow area within 10.0KM. lead 154.70 252.50 Cumt.
Providing and Laying in position Controlled Concrete M-200 grade concrete
for using cement content as per approved design mix, improve workability
without impiring strength and durability as per direction of the engineer in
charge. (min cement level as per latest ID: 456 shall be maintained) for
150mm thick trimix C.C Road with trimix vaccume dewatering system work
with power trowling sheet form with M.S Channel, surface vibrator with
providing road expansion joint having size 6mmx50mm by concrete cutter
machine and filled with bitumen, finishing with floor hardener necessary all
equipments, all labour charges complete.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
concret as per approved design and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. 15.00 419.96 Rmt.
Providing and fixing in position FE 500D TMT bar reinforement including
cutting, bending and tying complete as per detailed drawings. (A) R.C.C.
Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approch slab. (D) Wearing Coat. 4.26 73243.02 MT.
Provding PVC 100 mm diameter water spouts including necessary iron
gratings as per drawings. 60.00 159.37 Nos.
Providing and laying fitter media 600mm thick as directed at the back of
abutments, returns and wing walls as per detailed specifications. 100.50 1298.38 Sqmt
Providing & laying spreading and compacting 150mm thick WBM Grade - II
of B.T.M.C. metal 40mm to 63mm size including using 20% (13+7%) filler
i.e. stone screeing 13.2 mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness hand packing rolling with vibratory
roller8-10 tonnes in stages to proper garde and cmaber applying and
brooming required types of screening/binding materials to fill up the
interstices of coarse aggregate watering and compacting to the required
density. 7.60 1220.08 Cumt.
Total Amounts Rs….....…
Total Amounts Rs….....…
Stamp with Signature of Contractor
Consl.Engineer Municipal Engineer
"DESIGN POINT" Gondal Nagarpalika
Chief Officer President
Gondal Nagarpalika Gondal Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Tender-SBD.pdf
02 Form B-1.pdf
03 Schedule B.pdf
04 Drw and Section.pdf
05 Term and Condition.pdf
06 Specifications of Road Work.pdf
07 Specifications of Building Work.pdf
08 Vendor Civil work.pdf
09 TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
10 GR All.pdf
11 DMO_2876_01-May-2025_273.pdf
Download all tender documents and submit your bid