Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC VILLAGE KACCHI KHAMARIYA P O LALPUR TEHSIL RUDRAPUR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | L1 | Accepted-AOC Overall accepted as L1 | |
| 2 | L2₹5.5 L+₹76,010 (16.2%)Rejected-AOC MALIK COLONY AMARIYA ROAD AMARIYA CHOURAHA SITARGANJ | DEHRADUN | UTTARAKHAND | 248123 | L2 | Rejected-AOC Overall disqualified | |
| 3 | L3₹5.9 L+₹1.2 L (25.4%)Rejected-AOC KHASRA NO 203 KHARAKPUR DEVIPURA KASHIPUR | KASHIPUR | L3 | Rejected-AOC Overall disqualified | |
| 4 | Not Admitted-Fee/PreQual/Technical NA | - | Not Admitted-Fee/PreQual/Technical Others-The bidder did not submit tender documents in original with tender cost and EMD on or before schedule date and time. | |
| 5 | Not Admitted-Fee/PreQual/Technical BEHIND NIRMALA CONVENT SCHOOL CANAL ROAD KATHGODAM 263126 | NAINITAL | UTTARAKHAND | 263126 | - | Not Admitted-Fee/PreQual/Technical Others-The bidder did not submit tender documents in original with tender cost and EMD on or before schedule date and time. |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
25 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of SE, OandM Circle, PTCUL, Haldwani
Replacement of broken/punctured/damaged disc insulators in 132KV Bazpur-Haldwani line under 220KV OandM Division, Haldwani
2023_PTC13_66869_1
SE(OandM)/PTCUL/HLD/48/2023-24
Open Tender
Electrical Works
Item Rate
120 days
Haldwani
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
EE, 220KV OandM Division, PTCUL, Haldwani
₹17,000
Office of SE, OandM Circle, PTCUL, Haldwani
15 Jul 2024
26 Dec 2023
27 Jan 2024
26 Dec 2023
25 Jan 2024
26 Dec 2023
10 Jan 2024
Transportation, loading and unloading of various kinds of line material such as disc insulators, fittings, tools and plants such as turn buckle, stay wire, ropes, liftys, pulleys, different tools, clamps and connectors etc. from the stores of 220KV S/s, Kamaluaganja to 5 different sites in line route such as Barhaini, Gadgadia, Peepal Padao, Bhakhra Reserve Forest and Kamaluaganja Dohra areas through motorable roads, non-motorable roads, dense forest areas on suitable vehicle as well as on foot including head loading in a total stretch of approximately 60-70 Kms. complete in all respect as per direction of engineer incharge.
Temporary earthing at R and Y Phase between tower No. 2-3, B-phase between tower No. 83-86, Y-phase and B-phase between tower No. 98-102 of 132KV Bazpur-Haldwani line for providing safe zone for safety of line workers complete in all respect as per direction of engineer incharge.
Fixing of adequate stays including erection of Turn Buckle with the help of D clamp stay wire and nozzing of stay of stay wire at both ends, stringing and cutting of earth wire for proper erection work on crossarms of R and Y phase between tower No. 2-3, B phase between tower No. 83-86, Y and B Phase between tower No. 98-102 of 132KV Bazpur-Haldwani line, complete in all respect as per direction of engineer incharge.
Destringing of single phase ACSR Panther Conductor or R and Y phase between tower No. 2-3, B Phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 of 132KV Bazpur-Haldwani line by safe opening of all clamps, connectors and fittings, lowering of damaged insulator strings with the help of pulley system and laying it properly on the ground complete in all respect as per direction of engineer incharge.
Re-stringing of ACSR Panther Conductor of R phase tower No. 2-3, B phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 of 132KV Bazpur-Haldwani line with the help of liftey, pulley sytem including all related works such as hoisting of new insulators including measuing, cutting, clamping and all work above ground level complete in all respect as per direction of engineer incharge.
Removing of temporary earthing at R phase between tower No. 2-3, B phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 for providing safe zone for safety of line workers complete in all respect as per direction of engineer incharge.
Removing of turnbuckle and staywire etc. after completion of disc insulator replacement work between tower No. 2-3, B phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 complete in all respect as per direction of engineer incharge.
Transportation, loading and unloading of various kinds of line material such as disc insulators, fittings, tools and plants such as turn buckle, stay wire, ropes, liftys, pulleys, different tools, clamps and connectors etc. from 5 different sites in line route such as Barhaini, Gadgadia, Peepal Padao, Bhakhra Reserve Forest and Kamaluaganja Dohra areas to the stores of 220KV S/s, Kamaluaganja through motorable roads, non-motorable roads, dense forest areas on suitable vehicle as well as on foot including head loading in a total stretch of approximately 60-70 Kms. complete in all respect as per direction of engineer incharge.
Lashani Enterprises
KUMAUN ELECTRICALS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .