Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | Accepted-Technical Eligible |
| 2 | Accepted-Technical VILLAGE AND PO SHIYAH TEHSIL BHUNTAR DISTT KULLU H P | Accepted-Technical Eligible |
| 3 | Accepted-Technical | Accepted-Technical Eligible |
| 4 | Accepted-Technical V P O KOSRI TEHSIL JAISINGHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | Accepted-Technical Eligible |
| 5 | Accepted-Technical R O VILLAGE SAYANH P O LOHARA TEHSIL BATH DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | Accepted-Technical Eligible |
Tender Value
₹8.9 L
EMD Value
₹17,840
Closing Date
31 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Construction of roughing filter bed
2026_HPIPH_139926_1
HP IPH 5353-5403 DATED 24.07.2026
Open Tender
Civil Works
Item Rate
90 days
PALAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
EXECUTIVE ENGINEER
₹17,840
5 Aug 2026
24 Jul 2026
1 Aug 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc.in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge. | - | Cubic metre | - | - |
| 2 | Providing and laying cement concrete 1:3:6 (One cement is to three sand is to Six graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth, retaining walls and breast wall within all leads and lifts as per the direction of Engineer-in-charge. | - | Cubic metre | - | - |
| 3 | Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | - | - | - | - |
| 4 | a) Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 1 | Square metre | - | - |
| 5 | b) Edges of slab and breaks in floor and walls under 20 centimetre in wide within all leads and lifts as per the direction Engineer-in-charge. | - | Running metre | - | - |
| 6 | Providing and laying cement concrete 1:1.5:3 (One cement is to One and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in:- | - | - | - | - |
| 7 | a) Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | - | Cubic metre | - | - |
| 8 | b) Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge. | 1 | Cubic metre | - | - |
| 9 | Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge. | - | Killogramme | - | - |
| 10 | Laying and fixing of G.I. flanged pipe in trenches of following dia complete in all respect within all leads and lifts as per the direction of Engineer-in-charge. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_207408.xls
BOQ • 0.29 MB
Form6.pdf
Tender Documents • 0.29 MB
Form8.pdf
Tender Documents • 1.01 MB
Termsandconditions.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .