Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-Finance VILLAGE P O KUMARSAIN TEHSIL KUMARSAIN DISTT SHIMLA H P | KUMARSAIN | SHIMLA | HIMACHAL PRADESH | ₹1.3 Cr | L-1 | Accepted-Finance Lowest- |
| 2 | L-2₹1.4 Cr+₹13.0 L (10.1%)Rejected-Finance R O VILLAGE DADOH PO DHABAN TEHSIL BALH DISTRICT MANDI HP 175027 | MANDI | HIMACHAL PRADESH | 175027 | ₹1.4 Cr+₹13.0 L (10.1%) | L-2 | Rejected-Finance Lowest-2 |
| 3 | L-3₹1.5 Cr+₹18.4 L (14.2%)Rejected-Finance NOT AVAILABLE | NA | NA | 121004 | ₹1.5 Cr+₹18.4 L (14.2%) | L-3 | Rejected-Finance Lowest-3 |
| 4 | L-4₹1.7 Cr+₹41.8 L (32.3%)Rejected-Finance VILL SAKRAH PO CHAMBI TEHSIL SUNDERNAGAR DISTT MANDI HP | SUNDERNAGAR | MANDI | HIMACHAL PRADESH | ₹1.7 Cr+₹41.8 L (32.3%) | L-4 | Rejected-Finance Lowest-4 |
| 5 | L-5₹1.7 Cr+₹42.3 L (32.7%)Rejected-Finance VILLAGE DOHAL PO PATTI TEHSIL PALAMPUR DISTRICT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.7 Cr+₹42.3 L (32.7%) | L-5 | Rejected-Finance Lowest-5 |
| Sl No | Description | Qty | Unit | MNBN Enterprises L3 | GANTANTAR THAKUR L5 | AMIT CHOUDHARY L7 | MOHAMMAD SALMAN L2 | Tek Singh Raghav L6 | Shashi Bhushan L1 | KUSHAL SINGH RAGHAV L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15 cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads/lifts and shoring strutting, timbering and dewatering where ever required as per direction & entire satisfaction of the Engineer-in-Charge. All kind of soil (at STP work). | 177.59 | Cum | 330 ₹58,604.7 | 650 ₹1,15,433.5 | 660 ₹1,17,209.4 | 500 ₹88,795 | 710 ₹1,26,088.9 | 250 ₹44,397.5 Lowest | 695 ₹1,23,425.05 |
| 2.00 | Excavation in foundation and trenches etc. in earth work lift up to 1.5 mtrs, stacking the excavated soil not more than 3 meters away from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths, side of foundations etc including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil as directed in all lead of 20 mtrs complete in all respect as per the direction and satisfaction of Engineer-in-Charge. All kind of Soil (for pipes & man hole Chamber Work) | 1,547.3 | Cum | 329 ₹5,09,061.7 | 1,700 ₹26,30,410 | 1,800 ₹27,85,140 | 300 ₹4,64,190 Lowest | 1,150 ₹17,79,395 | 500 ₹7,73,650 | 1,095 ₹16,94,293.5 |
| 3.00 | Providing & laying cement concrete 1:6:12 (1 cement : 6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in : foundation and plinth including carriage of material complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 9.73 | Cum | 5,800 ₹56,434 Lowest | 6,500 ₹63,245 | 6,800 ₹66,164 | 6,000 ₹58,380 | 7,500 ₹72,975 | 5,800 ₹56,434 Lowest | 7,395 ₹71,953.35 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 16.79 | Cum | 6,000 ₹1,00,740 Lowest | 7,500 ₹1,25,925 | 7,800 ₹1,30,962 | 7,000 ₹1,17,530 | 7,800 ₹1,30,962 | 6,200 ₹1,04,098 | 7,695 ₹1,29,199.05 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 4.83 | Cum | 6,400 ₹30,912 Lowest | 8,000 ₹38,640 | 8,500 ₹41,055 | 7,500 ₹36,225 | 8,000 ₹38,640 | 6,500 ₹31,395 | 8,095 ₹39,098.85 |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including carriage of material complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 49.79 | Cum | 6,600 ₹3,28,614 Lowest | 8,500 ₹4,23,215 | 8,800 ₹4,38,152 | 7,700 ₹3,83,383 | 9,000 ₹4,48,110 | 7,000 ₹3,48,530 | 9,095 ₹4,52,840.05 |
| 7.00Providing and laying cement concrete in M 30 grade but not leaner than 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement & reinforced concrete work in:- | ||||||||||
| 7.01 | Foundation & Plinth including carriage of material complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 4.1 | Cum | 7,400 ₹30,340 Lowest | 10,000 ₹41,000 | 10,500 ₹43,050 | 7,900 ₹32,390 | 10,000 ₹41,000 | 8,200 ₹33,620 | 9,995 ₹40,979.5 |
| 7.02 | Walls (any thickness but not less than 0.10 m thickness) including attached butteresses, pillaster plinth and string coursess etc. from top of foundation level upto floor two level including carriage of materialcomplete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 13.59 | Cum | 7,600 ₹1,03,284 Lowest | 10,200 ₹1,38,618 | 10,600 ₹1,44,054 | 7,900 ₹1,07,361 | 10,000 ₹1,35,900 | 8,200 ₹1,11,438 | 9,995 ₹1,35,832.05 |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage of material complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 12.69 | Cum | 7,600 ₹96,444 Lowest | 9,500 ₹1,20,555 | 10,000 ₹1,26,900 | 7,900 ₹1,00,251 | 10,000 ₹1,26,900 | 8,200 ₹1,04,058 | 9,995 ₹1,26,836.55 |
Tender Value
₹1.8 Cr
EMD Value
₹2.6 L
Closing Date
23 Mar 2026, 5:00 pmClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_131564_1
EE-JSD-BGI/2025- 32247-97 dt. 13/03/2026
Open Tender
Civil Works
Item Rate
395 days
Baggi
as per NIT
7 documents required · 7 mandatory
₹5,000
₹2.6 L
6 Apr 2026
14 Mar 2026
24 Mar 2026
14 Mar 2026
23 Mar 2026
14 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15 cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads/lifts and shoring strutting, timbering and dewatering where ever required as per direction & entire satisfaction of the Engineer-in-Charge. All kind of soil (at STP work). | 177.59 | Cum | - | - |
| 2 | Excavation in foundation and trenches etc. in earth work lift up to 1.5 mtrs, stacking the excavated soil not more than 3 meters away from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths, side of foundations etc including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil as directed in all lead of 20 mtrs complete in all respect as per the direction and satisfaction of Engineer-in-Charge. All kind of Soil (for pipes & man hole Chamber Work) | 1,547.3 | Cum | - | - |
| 3 | Providing & laying cement concrete 1:6:12 (1 cement : 6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in : foundation and plinth including carriage of material complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 9.73 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 16.79 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 4.83 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including carriage of material complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 49.79 | Cum | - | - |
| 7Providing and laying cement concrete in M 30 grade but not leaner than 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement & reinforced concrete work in:- | |||||
| 7.01 | Foundation & Plinth including carriage of material complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 4.1 | Cum | - | - |
| 7.02 | Walls (any thickness but not less than 0.10 m thickness) including attached butteresses, pillaster plinth and string coursess etc. from top of foundation level upto floor two level including carriage of materialcomplete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 13.59 | Cum | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage of material complete in all respect with in all leads & lifts as per direction & entire satisfaction of the Engineer-in-Charge. | 12.69 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Form6.pdf
Tender Documents • 0.58 MB
TermsAndConditions.pdf
Tender Documents • 0.06 MB
BOQ_194567.xls
BOQ • 0.95 MB
OFFICE_ORDER_24_3.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .