| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹312.3 CrAdmitted-Finance AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | L1 | Admitted-Finance | ||
| 2 | L2₹321.9 Cr+₹9.6 Cr (3.06%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-As per bid clause 1.4.6 each member of a joint venture should have qualifying experience of at least one key component of eligibility criteria. Both the bidders of this joint venture are not fulfilling this criteria. | ||
| 4 | Not Admitted-Fee/PreQual/Technical 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | ||
| 5 | Not Admitted-Fee/PreQual/Technical B 31 32 2ND FLOOR INDUSTRIAL ESTATE NEW POWER HOUSE ROAD JODHPUR 342003 RAJASTHAN | JODHPUR | RAJASTHAN | 342003 | - | Not Admitted-Fee/PreQual/Technical Others-JV is not satisfying the condition of lining work specified in technical qualification requirement at clause 3.3.3 of the bid as at least one third of the lining should be PCC block lining which is( 0.88/1.357) not there in certificates submitted. |
Tender Value
₹335.8 Cr
EMD Value
₹6.7 Cr
Closing Date
12 May 2022, 6:00 pmClosed
CE IGNP BIKANER
OFFICE OF CE IGNP BIKANER
Development of Escape Reservoir at RD 1121 of IGMN For storage of excess water for JJM schemes
2022_IGNP_267766_3
CE 01 OF 2022-23
Open Tender
Civil Works - Canal
Percentage
547 days
RD 1121 OF IGMN
AS PER BID
2 documents required · 2 mandatory
₹10,000
EXECUTIVE ENGINEER 24TH DIVISION IGNP PHALODI
₹6.7 Cr
Yes
OFFICE OF CE IGNP BIKANER
27 May 2022
12 Apr 2022
13 May 2022
12 Apr 2022
12 May 2022
12 Apr 2022
20 Apr 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation , bushes,shurbs , brush wood , trees and sapling of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. (IGNP BSR 2021-22 Ch. VI item No.1 ) | 32,06,945 | Per Sqm | 7.39 | ₹2,36,99,323.55 |
| 2 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m (IGNP BSR 2021-22 Ch. VI item No.3 i, ii,iii,iv ) (i) Girth above 300 mm to 600 mm | 6,000 | each | 220 | ₹13,20,000 |
| 3 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m
(ii) Girth above 600 mm to 1200 mm | 3,000 | each | 990 | ₹29,70,000 |
| 4 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m
(iii) Girth above 1200 mm to 2400 mm | 1,000 | each | 4,620 | ₹46,20,000 |
| 5 | Loading in truck or MG/BG wagon within 50 Meter lead. Stone, sand, ballast, bajri, earth, grit , lime, timber murrum & Kankar...(IGNP BSR 2021-22 Ch. IV item No.3) | 4,80,562.55 | Cum | 100 | ₹4,80,56,255 |
| 6 | Unloading & stacking within 50 M. lead from truck or Railway wagon...Stone, sand , ballast, bajri, earth, grit, lime, timber, murrum & kankar ..(IGNP BSR 2021-22 Ch. IV item No.3) | 4,817.55 | Cum | 100 | ₹4,81,755 |
| 7 | Earth work excavation in Ordinary soil, undressed inclusive of all lift but with combined lead up to 200 mtrs (IGNP BSR 2021-22 Ch. VII item No.9.1 ) | 1,18,86,586.78 | Cum | 84 | ₹99,84,73,289.52 |
| 8 | Carriage of materials excluding loading, unloading and stacking..Earth lead for 1 km. (IGNP BSR 2021-22 Ch. IV item No.3) | 1,00,000 | Cum | 41 | ₹41,00,000 |
| 9 | Carriage of materials excluding loading, unloading and stacking..Earth lead for 2 km. (IGNP BSR 2021-22 Ch. IV item No.3) | 1,00,000 | Cum | 52 | ₹52,00,000 |
| 10 | Carriage of materials excluding loading, unloading and stacking..Earth lead for 3 km. (IGNP BSR 2021-22 Ch. IV item No.3) | 2,75,745 | Cum | 62 | ₹1,70,96,190 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BID1121.pdf
Tender Documents • 5.20 MB
BOQ_477733.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .