| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC KERALA KL | IDUKKI | KERALA | 685533 | ₹10.9 L | L1 | Accepted-AOC Accepted Vide Resolution No.1 dtd.17-02-2026 wadakkanchery municipality |
| 2 | L2₹11.4 LRejected-AOC | ₹11.4 L | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | VINEESH L1 | RAJESH V U L2 |
|---|---|---|---|---|---|
| 1.00SIDE PROTECTION AND CONCRETING | |||||
| 1.00 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (D) Dry Rubble Masonry | 8.11 | cum | 450 ₹3,650.40 | 450 ₹3,650.40 |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 142.37 | cum | 380 ₹54,100.22 | 390 ₹55,523.91 |
| 1.00 | OD223116/2025-2026:DRY RUBBLE MASONRY_Dry rubble without concrete levelling coarse masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete asper direction of Departmental officers at site | 67.15 | cum | 3,300 ₹2.2 L | 3,800 ₹2.6 L |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 45 | cum | 2,000 ₹90,000 | 2,000 ₹90,000 |
| 1.00 | OD223117/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 5.68 | cum | 1,700 ₹9,652.60 | 1,650 ₹9,368.70 |
| 1.01 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 83.92 | cum | 8,500 ₹7.1 L | 8,600 ₹7.2 L |
Tender Value
₹12.7 L
EMD Value
₹31,747
Closing Date
28 Jan 2026, 3:00 pmClosed
RISMY MUHAMMED
Office of the Muncipal Engineer, LID/EW, wadakkanchery municipality
Annual Plan-Pro. No.124/2025-26.GREEN PARK ROAD SIDE PROTECTION AND CONCRETING IN Dn-32 WADAKKANCHERY MUNICIPALITY
2026_LSGD_829094_2
07/2025-26/ME/LID/EW/WKY
Open Tender
Civil Works - Roads
210 days
wadakkanchery municipality
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹31,747
Yes
13 Mar 2026
21 Jan 2026
29 Jan 2026
21 Jan 2026
28 Jan 2026
21 Jan 2026
SIDE PROTECTION AND CONCRETING
2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (D) Dry Rubble Masonry
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD223116/2025-2026:DRY RUBBLE MASONRY_Dry rubble without concrete levelling coarse masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete asper direction of Departmental officers at site
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.
OD223117/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1392079.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1392079.xls
BOQ • 0.30 MB
td.pdf
Tender Documents • 0.75 MB
SBDNIT.pdf
Tender Documents • 2.24 MB
Download all tender documents and submit your bid