| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹3.1 LAccepted-Finance | ₹3.1 L | L2 | Accepted-Finance accept |
| 2 | L1₹1.8 LRejected-Finance | ₹1.8 L | L1 | Rejected-Finance The rate quoted for major items 1.08, 1.09, 1.10, 1.11, 1.12 is 95 percentage ( average) below and in total PAC is 38.11 percentage below and it is not workable hence rejected |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance EMD exemption certificate not valid |
| Sl No | Description | Qty | Unit | Shyam Sunder L1 | BINIL S O L2 |
|---|---|---|---|---|---|
| 1.00ANNUAL MAINTENANCE OF LIS | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 480 | sqm | 20.01 ₹9,604.80 | 19 ₹9,120 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 294 | cum | 283.39 ₹83,316.66 | 270.63 ₹79,565.22 |
| 1.00 | OD8690/2025-2026:Supplying and engaging Electrician for servicing motor and starter | 4 | each | 1,158.65 ₹4,634.60 | 1,105.55 ₹4,422.20 |
| 1.00 | OD8692/2025-2026:Supplying Electrician for Lifting the Motor after disconnecting the wire connections, decoupling the pump, detaching from the base plate/ for Lowering
motor and fitting to correct level and alignment including trial run etc. complete as per the direction of Departmental officer at site. | 4 | Day | 1,158.65 ₹4,634.60 | 1,105.55 ₹4,422.20 |
| 1.00 | OD8689/2025-2026:Supplying Man Mazdoor/Coolie for Lifting the Motor after disconnecting the wire
connections, decoupling the pump, detaching from the base plate/ for Lowering motor
and fitting to correct level and alignment including trial run etc./ for Placing wooden
shutters in the vents of check dam and filling the gap in between and making the same
leak proof/ for Lifting wooden shutters in the vents of check dam and clearing the vent
from any obstruction complete as per the direction of Departmental officer at site. | 51 | Day | 1,190.4 ₹60,710.40 | 1,136.18 ₹57,945.18 |
| 1.01 | OD8688/2025-2026:Supplying Mechanic Fitter for Lifting the Motor after disconnecting the wire
connections, decoupling the pump, detaching from the base plate/ for Lowering motor
and fitting to correct level and alignment including trial run etc. complete as per the
direction of Departmental officer at site | 10 | each | 1,446.93 ₹14,469.30 | 1,381.02 ₹13,810.20 |
| 1.01 | OD8693/2025-2026:Supplying and engaging Assistant wireman for servicing motor and starter | 4 | Day | 1,158.65 ₹4,634.60 | 1,105.55 ₹4,422.20 |
| 1.01 | OD8691/2025-2026:Greasing, Lubricating and Varnishing Pump | 4 | each | 20.01 ₹80.04 | 2,923.04 ₹11,692.16 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.8 | cum | 20.01 ₹216.11 | 8,996.14 ₹97,158.31 |
Tender Value
₹3.0 L
EMD Value
₹7,410
Closing Date
14 May 2026, 4:00 pmClosed
Pradeesh v
Office of Assistant Executive Engineer Minor Irrigation Sub-division, Palakkad
GENERAL-AM-2025-26 Cheerakkadavu LISAnnual Maintenance work to Cheerakkadavu LIS in attappadi Taluk in Palakkad District- General Civil Work
2026_Irrig_849445_1
IRR/IA/TR/3295/2025_5_1_1/1
Open Tender
Civil Works - Others
365 days
Cheerakkadavu in attappadi Taluk in Palakkad
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹7,410
Yes
8 Jun 2026
7 May 2026
16 May 2026
7 May 2026
14 May 2026
7 May 2026
7 May 2026 - 10 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1ANNUAL MAINTENANCE OF LIS | ||||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | OD8690/2025-2026:Supplying and engaging Electrician for servicing motor and starter | - | each | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | OD8692/2025-2026:Supplying Electrician for Lifting the Motor after disconnecting the wire connections, decoupling the pump, detaching from the base plate/ for Lowering
motor and fitting to correct level and alignment including trial run etc. complete as per the direction of Departmental officer at site. | - | Day | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | OD8689/2025-2026:Supplying Man Mazdoor/Coolie for Lifting the Motor after disconnecting the wire
connections, decoupling the pump, detaching from the base plate/ for Lowering motor
and fitting to correct level and alignment including trial run etc./ for Placing wooden
shutters in the vents of check dam and filling the gap in between and making the same
leak proof/ for Lifting wooden shutters in the vents of check dam and clearing the vent
from any obstruction complete as per the direction of Departmental officer at site. | - | Day | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | OD8688/2025-2026:Supplying Mechanic Fitter for Lifting the Motor after disconnecting the wire
connections, decoupling the pump, detaching from the base plate/ for Lowering motor
and fitting to correct level and alignment including trial run etc. complete as per the
direction of Departmental officer at site | - | each | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | OD8693/2025-2026:Supplying and engaging Assistant wireman for servicing motor and starter | - | Day | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | OD8691/2025-2026:Greasing, Lubricating and Varnishing Pump | - | each | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1435383.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1435383.xls
BOQ • 0.31 MB
viewsbdcheerakkadavu.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid