Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 LAccepted-AOC | L1 | Accepted-AOC overall accepted L1 | |
| 2 | L2₹53.0 L+₹5.2 L (10.9%)Rejected-AOC | L2 | Rejected-AOC overall disqualify | |
| 3 | Not Admitted-Fee/PreQual/Technical BEHIND NIRMALA CONVENT SCHOOL CANAL ROAD KATHGODAM | ALMORA | UTTARAKHAND | 263601 | - | Not Admitted-Fee/PreQual/Technical Others-The bidder did not submitted tender cost and EMD in originals on or before schedule date and time. |
Tender Value
Refer Docs
EMD Value
₹72,000
Closing Date
14 Nov 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, OandM Circle, 400 KV Substation Campus, Kashipur -244713
Work of Procurement and replacement of 145KV and 33KV CVts/PTs/CTs at 132KV SubStation, Kashipur
2022_PTC12_50014_1
SE(OandM)/PTCUL/KSP/34/2022-23
Open Tender
Supply of Materials
Item Rate
180 days
Kashipur
5 documents required · 5 mandatory
₹2,360
Yes
EE,400KV OandM Division, Kashipur
₹72,000
Yes
Kashipur
26 Jul 2023
29 Sept 2022
15 Nov 2022
29 Sept 2022
14 Nov 2022
29 Sept 2022
29 Sept 2022 - 28 Oct 2022
13 Oct 2022
Amount
Supply
145 KV CVT (1-Phase), Accuracy class 0.2/0.2S
145 KV CT (1-Phase), 5 core, 400/200/1A, Accuracy class 0.2S
145 KV PT (1-Phase), Accuracy class 0.2/0.2S
33 KV PT (1-Phase), Accuracy class 0.2/0.2S
Erection
Dismantling of old 145 KV CVT after opening ofl jumpers and clamps, earthing, nuts and botls etc complete, including its safe cartage to store at sub-station
Erection of 145 KV CVT (1-Phase), Accuracy class 0.2/0.2S complete with earthing ,including its testing and commissioning ,cartage at site, modification of base if required, Jumpering work etc. to complete the job in all respect.
Dismantling of old 145 KV PT after opening of| jumpers and clamps, earthing, nuts and botls etc. complete, including its safe cartage to store at sub-station.
Erection of 145 KV PT (1-Phase), Accuracy class 0.2/0.2S complete with earthing ,including its testing and Commissioning ,cartage at site modification of base if required, Jumpering work etc. to complete the job in all respect.
Dismantling of old 145 KV CT after opening of jumpers and clamps, earthing, nuts and botls etc complete, including its safe cartage to store at sub-station.
Erection of 145 KV CT (1-Phase), Accuracy class 0.2S complete with earthin8 including its testing and commissioning ,cartage at site, modification of base if required, Jumpering work etc. to complete the job in all respect.
Dismantling of old 33 KV PT after opening of| jumpers and clamps, earthing, nuts and botls etc. complete, including its safe cartage to store at sub-station.
Erection of 33 KV PT (1-Phase), Accuracy class 0.2/0.2S complete with earthing, including its testing and commissioning ,cartage at site, modification of base if required, Jumpering work etc. to complete the job in all respect.
KARAN SUPER ELECTRICAL WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .