| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-Finance | ₹15.2 L | L1 | Accepted-Finance The bidder has emerged as the lowest (L1) bidder. The quoted rate has been verified and found acceptable. Hence, the financial bid is accepted |
| 2 | L3₹15.9 LAccepted-Finance | ₹15.9 L | L3 | Accepted-Finance The bidder has emerged as L3 in the financial evaluation |
| 3 | L4₹16.2 LAccepted-Finance | ₹16.2 L | L4 | Accepted-Finance The bidder has emerged as L4 in the financial evaluation |
| 4 | Rejected-Technical MUKALEL AMARAVATHY P O KUMILY | KUMILY | IDUKKI | KERALA | - | - | Rejected-Technical The bid is technically rejected due to non-submission of the required documents as stipulated in the tender conditions |
Updated dates
Tender Value
₹16.5 L
EMD Value
₹41,250
Closing Date
31 Mar 2026, 2:00 pmClosed
Assistant Executive Engineer
Transmission Sub Division Peermade, Pothuipara P.O pallikunnu
Construction of Front Gate and Compound wall for 33kV Substation Kumily
2026_KSEB_839432_1
TDT /E-Tender 03/2025-26 dated 23.02.2026
Open Tender
Civil Works - Others
33kvsubstation kumily
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,894
Yes
₹41,250
20 Jun 2026
24 Feb 2026
16 Apr 2026
24 Feb 2026
31 Mar 2026
24 Feb 2026
24 Feb 2026 - 31 Mar 2026
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts:
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size
Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
Centering and shuttering including strutting, etc. and removal of form for: Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand)
Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Fabricating and supplying angle iron of size 40x40x6mm of length 1m for fixing over the compound wall pillar including providing 450 bend from 65 cm from the bottom, Includlng bottom to be split and bent at right angle in opposite direction for 5 cm length cutting 6 Nos grooves for fixing barbed wire Including providing red oxide priming coat etc complete.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
White cement washing one coat for new surface including cost and conveyance of all materials, labour charges, etc. complete as per the direction of departmental officers
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.46 MB
GCC.pdf
Tender Documents • 0.88 MB
specialconditionsandtechspec.pdf
Additional Documents • 0.58 MB
Nominationform.pdf
Additional Documents • 0.09 MB
etendertermsandconditions.pdf
Additional Documents • 0.32 MB
BoundenAgreement.pdf
Additional Documents • 0.14 MB
BOQ_1414598.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid