Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.3 LAccepted-AOC VILL BHANKOLI P O BHANKOLI TEHSIL PUROLA UTTARKASHI UTTARAKHAND 249171 | UTTAR KASHI | UTTARAKHAND | 249171 | ₹85.3 L | L1 | Accepted-AOC Financial bid qualified |
| 2 | L2₹87.4 LRejected-Finance | ₹87.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹89.7 LRejected-Finance | ₹89.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹90.6 LRejected-Finance | ₹90.6 L | L4 | Rejected-Finance L4 |
| 5 | L5₹1.0 CrRejected-Finance BADI BARGICHA ALMORA DISTRICT UTTARAKHAND | ALMORA | UTTARAKHAND | 263601 | ₹1.0 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Hitesh Bhatt L2 | TANUJA TRADERS L4 | Mahesh Chandra Sanwal L5 | ELEMENTE DESIGNER HOMES L3 | Dalip Singh L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 169.73 | cum | 181.5 ₹30,806 | 194.12 ₹32,947.99 | 216.18 ₹36,692.23 | 190 ₹32,248.70 | 182.67 ₹31,004.58 |
| 2.00 | Filling available excavated earth in trenches, plinth in layers consolidating by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 85.18 | cum | 135.5 ₹11,541.89 | 146.17 ₹12,450.76 | 162.78 ₹13,865.60 | 155 ₹13,202.90 | 137.55 ₹11,716.51 |
| 3.00 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | 46.63 | cum | 4,935.6 ₹2.3 L | 5,080.13 ₹2.4 L | 5,657.42 ₹2.6 L | 5,500 ₹2.6 L | 4,780.52 ₹2.2 L |
| 4.00 | RR stone masonry with hard stone in foundation and plinth i/c levellingup with CC 1:6:12 (1 cement: 6 coarse sand : 12 stone agg. 20mm size) at plinth level with cement mortar 1:6 (1 cement : 6 c/sand). | 30.8 | cum | 5,335 ₹1.6 L | 5,452.45 ₹1.7 L | 6,072.05 ₹1.9 L | 5,500 ₹1.7 L | 5,130.88 ₹1.6 L |
| 5.00 | P/L in position RCC 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - All work upto plinth level (in foundation). | 47.03 | cum | 6,400 ₹3.0 L | 6,745.98 ₹3.2 L | 7,512.57 ₹3.5 L | 6,800 ₹3.2 L | 6,348.12 ₹3.0 L |
| 6.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in cement mortar 1:6 (1 cement : 6 c/sand). | 11.24 | cum | 5,016 ₹56,379.84 | 5,318.97 ₹59,785.22 | 5,923.39 ₹66,578.90 | 5,600 ₹62,944 | 5,005.27 ₹56,259.23 |
| 7.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), plinth and string courses, columns, pillars, piers, abutments, posts & struts etc. upto floor five level ex. cost of c/shuttering, finishing and reinf. | 19.53 | cum | 7,827 ₹1.5 L | 8,093.73 ₹1.6 L | 9,013.47 ₹1.8 L | 8,500 ₹1.7 L | 7,616.38 ₹1.5 L |
| 8.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) beams,s/shades, shelf ,stair case,door bend and suspended slabs etc. ex. cost of c/shuttering, finishing and reinf. | 131.39 | cum | 8,305 ₹10.9 L | 8,580.37 ₹11.3 L | 9,555.41 ₹12.6 L | 8,500 ₹11.2 L | 8,074.32 ₹10.6 L |
| 9.00 | Centering and shuttering i/c strutting propping etc and removel of form for foundations footings bases of columns etc for mass concrete. | 115.57 | sqm | 273 ₹31,550.61 | 292.45 ₹33,798.45 | 325.68 ₹37,638.84 | 260 ₹30,048.20 | 275.2 ₹31,804.86 |
| 10.00 | Centering and shuttering i/c strutting propping etc and removel of form for Suspended floors roofs landings balconies and access platform. | 604.83 | sqm | 682.4 ₹4.1 L | 691.51 ₹4.2 L | 770.09 ₹4.7 L | 650 ₹3.9 L | 650.73 ₹3.9 L |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
26 Jun 2024, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMORA
The work ofdeveloping the required basic facilities at GIC Bhainta Baroli as a cluster school
2024_RES_72474_1
313 Dated 11-06-2024
Open Tender
Civil Works - Buildings
360 days
Bhainta baroli
The work ofdeveloping the required basic facilities at GIC Bhainta Baroli as a cluster school
2 documents required · 2 mandatory
₹4,720
Yes
4000 D.H. And 720 GST No.
₹2.1 L
3 Feb 2026
19 Jun 2024
27 Jun 2024
19 Jun 2024
26 Jun 2024
19 Jun 2024
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid