Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹4.5 L
Closing Date
12 May 2026, 4:00 pmClosed
Executive Enginner Nyoma Division
Office of the Executive Engineer RnB Nyoma
Construction of Motorable Bridge from tankhar to Norbuyangzin at Bukshado Hanlay under SDP
2026_PWD_18857_1
63 of RnB Nyoma
Open Tender
Civil Works - Bridges
Percentage
720 days
Nyoma Leh
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,000
Executive Engineer RnB Nyoma
₹4.5 L
29 Apr 2026
29 Apr 2026
13 May 2026
29 Apr 2026
12 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Soil testing, Design, Fabrication, Launching and Commissioning incl. weighing of drawings 26mtrs span single lane steel plate girder Motorable Bridge with RCC decking over Hanly Nallah at Tangkhar to Norbuyangzin, including dewatering , construction of abutments, approach, wing wall, return wall dirt wall, approach slab of 5.0mtr, RCC cap, fixing of suitable bridge bearings, expansion joints complete job, carriages of material to the site of works as per approved drawings and design with respect to site conditions duly approved by the competent authority i.e., Design Directorate (complete Job). As per direction of Engineer In- charge. | 1 | Job | 1,89,27,118.64 | ₹1,89,27,118.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_45022.xls
BOQ • 0.31 MB
Corribridgebukshado.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .