Loading…
Loading…
Tender Value
₹51.9 L
EMD Value
₹52,000
Closing Date
13 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Panchayat Road and Building Division, Bhavnagar
Construction of Taluka panchayat office Building (Furniture Work) At Palitana, Tal. Palitana Dist. Bhavnagar
318459
6/2026-27 of Bhavnagar Sr. No.13
Open
Civil - All
Bhavnagar
5 documents required · 5 mandatory
₹2,400
Executive Engineer Panchayat R&B Division Bhavnagar
₹52,000
27 Jun 2026
27 Jun 2026
27 Jun 2026
13 Jul 2026
27 Jun 2026
Name of Work :- Construction of Taluka panchayat office Building (Furniture Work) At
Palitana, Tal. Palitana Dist. Bhavnagar
Bill of Quantities
Memorandum showing items of works to be carried out
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or In Figure In Words. according to
No. less. Rs. Ps estimated
1 24.00 Sqm Providing making & supplying 11729.13 Rupees One
wooden Executive Table of required Eleven Squere
size of approved design and as per Thousand Seven metre
detail drawing using 19 mm thick Hundred
water proof ply wood in top,side,front Twenty Nine
and support with 1.0 mm thick and Paise
laminate off approved pattern, colour, Thirteen only
texture,the rest of the inside
surfaces,shelves, back and the top
shall be finished with 0.8 mm white
laminates of approved make, teak
wood framingshall be used wherever
necessary with all steel finish brass
hardware fittings,fastners, 3 coat of
melamine polish on
woodenpart,glass,glass work i.e.
acid,frosting on top,front as per detail
drawings,key board trays,drawer with
SS sliding channels,cabale tray under
table,table top pop up with RJ45
RJ11,5Amp universal plug of legrand
or eq. make etc. complete as per detail
drawing and as directed by Engineer-
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or In Figure In Words. according to
No. less. Rs. Ps estimated
2 54.00 Sqm Providing making & supplying wooden 13970.32 Rupees One
work station of requred persons clusters Thirteen Squere
of design as per detail drawing using 19 Thousand Nine metre
mm thick water proof ply wood of Hundred
approved quality in top, side, front, Seventy and
shutter and support with 1.0 mm thick Paise Thirty
laminate of approved quality and Two only
pattern,colour,texture,the rest of the
inside surfaces,shelves,back and the top
shall be finised with 0.80 mm thick white
laminates of approved make,wooden
framing shall be used wherever necessary
with all steel finish brass hardware
fittings,fasteners,3 coats of melamine
polish on wooden part, glass,glass work
i.e. acid,frosting on top, front as per
detail drawings, key board trays,drawers
with SS sliding channels,cable tray inside
table,table top pop up with
RJ45,RJ11,5Amp universl plug of
legrand or eq. make, 50mm thick and
1.20m high partition at front,end and
center of clusters etc. complete as per
detail drawing and as directed by
Engineer-in-Charge.(Note: For payment
lenth and width of top will be multiplied).
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or In Figure In Words. according to
No. less. Rs. Ps estimated
3 7.00 Sqm providing, making & supplying wooden 7143.73 Rupees Seven One
Conferrence / Seminar table having top Thousand One Squere
38mm and of required size and design as Hundred Forty metre
per detail drawing using 19 mm thick ply Three and Paise
wood of approved brand in top,side,front Seventy Three
and support & covered with 1.0 mm thick only
laminate of approved
make,pattern,colour,texture and teak
wood/white beach pattern, the rest of
inside surfaces,shelves,back and the top
shall be finised with 1 mm laminates of
approved make & pattern,wooden
framing shall be used wherever necessary
with all steel finish brass hardware
fittings, fastners, 3 coat of melamine
polish on wooden part, glass, glas work
i.e. acid,frostin on top,front as per detail
drawings,key board trays,drawers with
SS sliding channels,cabale tray under
table,table top pop up with
RJ45,RJ11,%amp universal plug of
legrand or eq. make etc. complete as per
detail drawing and directed by Engineer-
in-Chrge.(Note: For payment lenth and
width of table top will be measured)
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or In Figure In Words. according to
No. less. Rs. Ps estimated
4 123.00 Sqm providing, making & supplying wooden 9446.53 Rupees Nine One
cup boards/side table of size and design Thousand Four Squere
as per detail drawing using 19 mm thick Hundred Forty metre
BWP grade ply wood of IS 710 of Six and Paise
approved brand in top,side,front and Fifty Three only
support & covered with 1.0 mm thick
laminate of approved
make,pattern,colour,texture and teak
wood/white beach pattern, the rest of
inside surfaces,shelves,back and the top
shall be finised with 1 mm laminates of
approved make & pattern,wooden
framing shall be used wherever necessary
with all steel finish brass hardware
fittings, i.e. handles,locks,magnet,auto
stoppers,hinges,channel, fastners, 3 coat
of melamine polish on wooden part,
glass, glas work i.e. acid,frostin on
top,front as per detail drawings,key board
trays,drawers with SS sliding
channels,cabale tray inside etc. complete
as per detail drawings and architect's
instructions.(Note: For payment height
and width will be measured)
5 6.00 No Providing and supplying powder 15150.00 Rupees One
coated/Chrome plated hydraulic Fifteen Number
Revolving Synchronic High Back Thousand One
chair of approved make ergonomic Hundred Fifty
design using M.S.pipe/carbon frame and Paise Zero
and supports, rubber Dunlop in seat only
and back portion covered with
polycarbon net, chrome coated five
lags base with virgin caster, pu
handles of approved shape with
hydraulic system with adjustable head
rest, adjustable lumber support,
adjustable handle etc. complete as
directed by Enginner-in-Charge.
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or In Figure In Words. according to
No. less. Rs. Ps estimated
6 264.00 No Providing and placing Auditorium 5252.00 Rupees Five One
Chair/seinar Chair of seat size Thousand Two Number
475X475 and back height 475 mm Hundred Fifty
from seat with pad Rest Facility using Two and Paise
pipe sructure of approved shape using
high density U foam covering good
quality of tapestry cloth on seat back
as design approved by engineer in
7 46.00 No Providing and supplying powder 8080.00 Rupees Eight One
coated/Chrome plated hydraulic Thousand Number
Revolving Synchronic High Back Eighty and
design using M.S.pipe/carbon frame
and supports, rubber Dunlop in seat
and back portion covered with
polycarbon net, chrome coated five
lags base with virgin caster, pu
handles of approved shape with
hydraulic system with adjustable head
rest, adjustable lumber support,
adjustable handles etc. complete as
directed by engineer-in-Charge.
8 30000.00 Sqcm Providing and fixing signage plates 4.86 Rupees One
made out of 2 mm thick S.S. sheet of Four and Paise Squere
S.S. 316 of specified size as per Eighty Six only Centimetr
design. Pre-treated with hair line brush e
finish: coated with two coat of
melamine polish of appropriate brand,
with figure print, raduim strip writings
which carrying specified fonts letters
of appropriate height fixed with
appropriate hardware like sash stud,
s.s. hanger, sash chain etc. and
fastners as per designs supplied by the
Architect and instructions by
Authority and Engineer in charge. The
fixing at site should be complete under
the supervision of Engineer-in-charge.
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or In Figure In Words. according to
No. less. Rs. Ps estimated
9 15.00 No Supplying and fixing of Stainless steel 9090.00 Rupees Nine One
seat Waiting Bench height 760mm, Thousand Number
back height 460mm, Overall length Ninety and
back, Cold rolled steel armrest and
legs with chrome finishings, &
Powder-coated cross beam in black.
under the supervision & as directed by
Engineer - in - charge.
10 91.00 Sqm Providing and fixing 40mm panelled, 3581.89 Rupees Three One
Glazed or panelled and glazed Thousand Five Squere
partitions fixed to frames with iron Hundred Eighty metre
scews etc. complete with indian teak One and Paise
wood (Frames tobe paid separately) Eighty Nine only
11 7.00 10 Providing wood work in frames of 610.23 Rupees Six Ten
Cu.dm Doors, windows cleare story Hundred Ten Cubic
windows and othersimilar works and Paise Decimal
wrought, framede and fixed in Twenty Three
position. (A) Indian Teak Wood only
12 4.00 Sqm Providing and fixing 25 mm thick 3179.95 Rupees Three One
shutters for cupboards etc. including Thousand One Squere
anodised alluminium butt hinges with Hundred metre
necessary screws. (A) Indian teak Seventy Nine
wood. (i) Fully Panelled. and Paise
Ninety Five only
13 162.00 Sqm Providing and fixing Metal Slotted 2222.00 Rupees Two One
Angle Rack Grey Colour2.2x0.75x0.3 Thousand Two Squere
one Reck, heavy metal used, Hundred metre
Assembly Required: nut bolt assembly Twenty Two
required, 20 gauge plate 16 gauge and Paise Zero
angle, Color: Grey Oil Paint under only
the supervision & as directed by
Engineer - in - charge.
14 174.00 Sqm Providing and fixing Cloth Curtian 606.00 Rupees Six One
Polyester Fabric Blend : Polyester Hundred Six Squere
*Readymade Premium Jacquard Door and Paise Zero metre
Curtain with 8 Eyelets & Stainless only
Steel Two Tone Curtain Rod under
the supervision & as directed by
Engineer - in - charge.
Rupees Fifty One Lakh Eighty Seven Thousand Four Hundred Thirty Five and Paise Total Rs.
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or In Figure In Words. according to
No. less. Rs. Ps estimated
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent
( Should be written in figures and words ) of the estimated rate mentioned above. Amount of
My \ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Palitana Bhavnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8.GR SBD (Paripatra).pdf
9.Invorement (MMGSY).pdf
Tender Notice No.6 of 2026-27.pdf
BOQ-Palitana Taluka Panchayat Furniture.pdf
SBD TP Palitana Furniture.pdf
SPECI TP Palitana Furniture.pdf
Download all tender documents and submit your bid