| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC BHARSATHI VARANASI UTTAR PRADESH | MAU | UTTAR PRADESH | 221601 | ₹7.3 Cr Quoted ₹7.4 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹7.5 Cr+₹13.9 L (1.89%)Rejected-Finance LOHRADIH KAPSETHI VARANASI U P | ₹7.5 Cr+₹13.9 L (1.89%) | L2 | Rejected-Finance Not Qualified |
Tender Value
₹7.5 Cr
EMD Value
₹15.0 L
Closing Date
31 Mar 2025, 12:00 pmClosed
Praveen Kumar
Superintending Engineer, Varanasi Circle, PWD Vara
Widenning and Strengthning of Sarai Laxmangardh Ramgardh Maharajganj Hingutargardh Road
2025_CEUVZ_1019326_1
598/183Com-Varanasi Circle/2024-25 Dt. 11.02.2025
Open Tender
Civil Works
Item Rate
360 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,590
₹15.0 L
Yes
28 May 2025
19 Mar 2025
31 Mar 2025
19 Mar 2025
31 Mar 2025
19 Mar 2025
Amount
Excevation for roadwork in soil with hydraulic excavator including cutting and loading, trimming bottom and side slopes in accordarice with requrerments of lines grades and cross sections and transporting to the embackment location within all lifts and load upto 1000m (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of Embankment with Material obtained from Right of way: Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying primer coat with SS grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat-2 with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of un-reinforced,plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification MORT&H Specification No-304 (Sr. No-12.3).(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
P.C.C 1:2:4 Providing concrete for plain/reinforced concrete in open foundations complete as per drawaings and technical speicfication Clause 802,803,1202 & 1203.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications..(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Brick Masonry Work in Cement Mortar 1:4 in substructure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. 602,603,604,1202 & 1204.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. As per SOR No-574 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and Laying 600 mm RCC Hume Pipes NP-3 inculidng collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and Laying 1000 mm RCC Hume Pipes NP-3 inculidng collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
M25 Providing and laying reinforced cement concrete in super structure as per drawing and technical specification Clause 800,1205.4 and 1205.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing weep holes in brick masonry/ stone masonry plain/ reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure slope of 1(V) 20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 As per SOR No-MORD 600/12.9 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL As Per SOR NS(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Wearing Coat Providing and laying cement concrete wearing course M 30 grade excluding reinforcement complete as per drawing and technical specification Clause 800 and 1206.3 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying cut stone on road or shoulders with 25x15x10cm size dressed cut stone over WBM surface including providing average 3cm thick stone dust for leveling cost and joint filling with coarse sand and 5% Bitumen mix including all cost of Labour, Fuel wood, T&P etc required for proper completion of the work (including cost of cut sone, stone dust. coarse sand and bitumen)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 25 kg each complete as per drawing and Technical specification. Clause no-1301(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
RCC Grade M20 using batching plant transit mixer & manual placing(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
MS RAJ ASSOCIATES (BID ID -5067167)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tenderdocument.pdf
Tender Documents • 0.15 MB
Tenderdocument_2.pdf
Tender Documents • 0.30 MB
Tenderdocument_3.pdf
Tender Documents • 8.22 MB
BOQ.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .